West Pilbara Iron Ore Project Stage 1 - Mine and Rail

Project
Proposal description: 

The proposal is to develop eight iron ore deposits at five locations, between 35 and 85 kilometres (km) south of Pannawonica. A heavy-haulage railway approximately 285 km in length would be developed to connect the mine area with a port to be constructed at Anketell Point, 25 km north-east of Karratha. The project would produce up to 30 million tonnes per annum (Mtpa) of iron ore.

This Ministerial Statement was superseded by Statement 1026 and Statement 1027 published on 4 February 2016.

Assessment Number: 
1767
Region: 
Referred under EP Act: 
s38
Industry sector: 
Last updated: 
November 25, 2024
Current Status: 
Ministerial Statement published
Ministerial Statement published