West Pilbara Iron Ore Project Stage 1 - Mine and Rail

Project
Proponent: 
API Management Pty Limited
Proposal description: 

The proposal is to develop eight iron ore deposits at five locations, between 35 and 85 kilometres (km) south of Pannawonica. A heavy-haulage railway approximately 285 km in length would be developed to connect the mine area with a port to be constructed at Anketell Point, 25 km north-east of Karratha. The project would produce up to 30 million tonnes per annum (Mtpa) of iron ore.

This Ministerial Statement was superseded by Statement 1026 and Statement 1027 published on 4 February 2016.

Assessment Number: 
1767
Region: 
Pilbara
Referred under EP Act: 
s38
Industry sector: 
Infrastructure
Iron Ore
Last updated: 
November 25, 2024
Current Status: 
Ministerial Statement published
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Public Environmental Review
Extract of determination: 
PDF icon West Pilbara Iron Ore Project - mining and railway south-west of Pannawonica, Shire of Ashburton and Shire of Roebourne
Preliminary Environmental Factors: 
Social Surroundings
Flora and Vegetation
Terrestrial Fauna
Inland Waters Environmental Quality
Date published: 
Monday, 8 December, 2008
3. Assessment
Environmental Review
Public submissions: 
Monday, 21 June, 2010 to Monday, 16 August, 2010
Proponent response to submissions: 
PDF icon Response to Submissions Report
PDF icon Appendix 1: Complete submissions and response table
4. EPA Report on assessment
EPA Report Number: 
1409
EPA Report: 
PDF icon West Pilbara Iron Ore Project Stage 1 Mine and Rail Proposal
Key Environmental Factors: 
Flora and Vegetation
Subterranean Fauna
Terrestrial Fauna
Date published: 
Wednesday, 3 August, 2011
Appeals close: 
Wednesday, 17 August, 2011
5. Decision on proposal and implementation of proposal
Ministerial Statement
Comments: 

This Ministerial Statement was superseded by Statement 1026 and Statement 1027 published on 4 February 2016.

Date of approval: 
Wednesday, 30 November, 2011
Ministerial Statement: 
PDF icon Ministerial Statement 881
Post-assessment changes
Comments: 

In July 2014, Aquila Resources Ltd was acquired by Baosteel Resources Australia Pty Ltd and Aurizon Operations Limited. A revised implementation model for the project has been developed based on separate corporate entities being responsible for implementing the mine and rail infrastructure components of the project.

In August 2015, API Management Pty Ltd (API) submitted a request for a change to the proposal and Ministerial Statement under Sections 45C and 46 of the EP Act, requesting that the Ministerial Statement be separated into two for the mine and rail infrastructure components. This would include separating the development envelope into a mine development envelope and rail infrastructure development envelope. The change also involves minor amendments to the areas of disturbance and development envelopes. This results in a 67 hectare (ha) reduction to the total area of disturbance.

Section 46 inquiry: 
West Pilbara Iron Ore Project Stage 1 – Mine and Rail (s46)

Source URL:https://www.epa.wa.gov.au/proposals/west-pilbara-iron-ore-project-stage-1-mine-and-rail