Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Infrastructure (16) Apply Infrastructure filter
  • Oil and gas (9) Apply Oil and gas filter
  • Iron Ore (6) Apply Iron Ore filter
  • Salt (4) Apply Salt filter
  • Industrial (3) Apply Industrial filter

Filter by current status:

  • (-) Remove Ministerial Statement published filter Ministerial Statement published

Filter by preliminary environmental factors:

  • (-) Remove Marine Fauna filter Marine Fauna
  • Benthic Communities and Habitats (19) Apply Benthic Communities and Habitats filter
  • Marine Environmental Quality (17) Apply Marine Environmental Quality filter
  • Flora and Vegetation (15) Apply Flora and Vegetation filter
  • Social Surroundings (13) Apply Social Surroundings filter
  • Terrestrial Fauna (11) Apply Terrestrial Fauna filter
  • 37 (8) Apply 37 filter
  • Coastal Processes (6) Apply Coastal Processes filter
  • Inland Waters Environmental Quality (4) Apply Inland Waters Environmental Quality filter
  • Hydrological Processes (3) Apply Hydrological Processes filter
  • Inland Waters (3) Apply Inland Waters filter
  • Landforms (2) Apply Landforms filter
  • Subterranean Fauna (2) Apply Subterranean Fauna filter
  • Terrestrial Environmental Quality (2) Apply Terrestrial Environmental Quality filter
  • 3144 (1) Apply 3144 filter

Filter by Proponent:

  • Chevron Australia Pty Ltd (3) Apply Chevron Australia Pty Ltd filter
  • Forge Resources Swan Pty Ltd (2) Apply Forge Resources Swan Pty Ltd filter
  • Leichhardt Industrials Pty Ltd (2) Apply Leichhardt Industrials Pty Ltd filter
  • Mardie Minerals Pty Ltd (2) Apply Mardie Minerals Pty Ltd filter
  • Onslow Salt Pty Ltd (2) Apply Onslow Salt Pty Ltd filter
  • Woodside Energy Ltd (2) Apply Woodside Energy Ltd filter
  • API Management Pty Limited (1) Apply API Management Pty Limited filter
  • Australian Methanol Company Pty Ltd (1) Apply Australian Methanol Company Pty Ltd filter
  • Australian United Steel Industry Pty Limited (1) Apply Australian United Steel Industry Pty Limited filter
  • BHP Billiton Iron Ore (1) Apply BHP Billiton Iron Ore filter
  • BHP Billiton Petroleum Pty Ltd (1) Apply BHP Billiton Petroleum Pty Ltd filter
  • Chevron Australia Pty Ltd (for original proposal) (1) Apply Chevron Australia Pty Ltd (for original proposal) filter
  • Korean Steel Pty Ltd (1) Apply Korean Steel Pty Ltd filter
  • NW Interconnected Power Pty Ltd (1) Apply NW Interconnected Power Pty Ltd filter
  • Onslow Infraco Pty Ltd (1) Apply Onslow Infraco Pty Ltd filter
  • Onslow Marine Support Base Pty Ltd (1) Apply Onslow Marine Support Base Pty Ltd filter
  • Port Hedland Port Authority (1) Apply Port Hedland Port Authority filter
  • Robe River Iron Associates (1) Apply Robe River Iron Associates filter
  • West Australian Petroleum Pty Ltd (1) Apply West Australian Petroleum Pty Ltd filter
  • Z1Z Resorts Pty Ltd (1) Apply Z1Z Resorts Pty Ltd filter

Filter by region:

  • (-) Remove Pilbara filter Pilbara

Filter by last updated:

  • 2024 (5) Apply 2024 filter
  • 2023 (2) Apply 2023 filter
  • 2022 (3) Apply 2022 filter
  • 2021 (1) Apply 2021 filter
  • 2020 (2) Apply 2020 filter
  • 2019 (1) Apply 2019 filter
  • 2018 (1) Apply 2018 filter
  • 2015 (1) Apply 2015 filter
  • 2013 (2) Apply 2013 filter
  • 2012 (2) Apply 2012 filter
  • 2008 (1) Apply 2008 filter
  • 2007 (1) Apply 2007 filter
  • 2002 (1) Apply 2002 filter
  • 2000 (1) Apply 2000 filter
  • 1998 (1) Apply 1998 filter
  • 1996 (1) Apply 1996 filter
  • 1995 (1) Apply 1995 filter
  • 1991 (1) Apply 1991 filter
  1. Home
  2. Proposal search
  3. Marine Fauna
  4. Ministerial Statement published
  5. Pilbara

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Ashburton Infrastructure Project

Last updated: November 25, 2024

The Proposal is located in the Pilbara region of Western Australia within a development envelope of 20,821 ha and clearing no more than 1,564 ha. Onslow Infraco Pty Ltd (herein MRL a wholly owned subsidiary of Mineral Resources Limited) is proposing to develop: • A fully sealed private haul road, approximately 125km in length • Gas pipeline and ancillary haul road infrastructure. • Storage and bulk handling of ore at the Port of Ashburton. • Dredging a dedicated berthing pocket adjacent to the... Read more...

Gorgon Gas Development Revised and Expanded Proposal: Barrow Island Nature Reserve

Last updated: November 25, 2024

The construction of facilities for the development of the Greater Gorgon Gas Fields on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on Barrow Island. Read more...

Wheatstone Development - Gas Processing, Export Facilities and Infrastructure

Last updated: November 25, 2024

The Proposal is to construct and operate a 25 million tonne per annum Liquefied Natural Gas (LNG) facility and associated Domestic Gas (Domgas) facility in the proposed Ashburton North Strategic Industrial Area (ANSIA) 12 kilometres south west of the town of Onslow. Read more...

Lumsden Point General Cargo Facility

Last updated: August 12, 2024

The proposal is to develop and operate a general cargo facility within the Port Hedland inner harbour, within the Town of Port Hedland. This proposal has been superseded by the Lumsden Point General Cargo Facility Read more...

Asian Renewable Energy Hub

Last updated: April 11, 2024

NW Interconnected Power Pty Ltd is seeking to develop the Asian Renewable Energy Hub. The proposal is to construct and operate a large-scale wind and solar hybrid renewable energy project, approximately 220 km east of Port Hedland, WA. The renewable energy will be exported via a subsea power cable to Indonesia and Singapore. Onshore components comprise a series of linear arrays of wind turbines (up to 1,743 turbines) and solar panels distributed across a 644,600 ha development envelope, with a... Read more...

Ningaloo Lighthouse Resort Project

Last updated: December 15, 2023

Z1Z Resorts Pty Ltd proposes to redevelop the Ningaloo Lighthouse Holiday Park, located along Yardie Creek Road, North West Cape. The Proposal comprises the construction of new visitor accommodation; the construction of associated ancillary facilities (i.e., staff accommodation, power supply infrastructure, water supply and treatment, wastewater treatment and reuse, and replacement service station (vehicle refuelling) etc.); refurbishment of the Vlamingh Head Lighthouse Quarters (a part of... Read more...

Optimised Mardie Project

Last updated: October 19, 2023

Mardie Minerals Pty Ltd has approval to develop a greenfields high quality salt and SoP project and associated export facility at Mardie, approximately 80 km south-west of Karratha, in the Pilbara region of WA. The project will produce a high purity salt product, Sulphate of Potash (SoP) and other products that can be derived from sea water. The Proposal includes the expansion of the approved Mardie Project (Ministerial Statement [MS] 1175) including expanded concentrator and crystalliser ponds... Read more...

Balla Balla Export Facilities

Last updated: July 1, 2022

The proposal is to construct and operate an iron ore export facility at Balla Balla midway between Port Hedland and Karratha, northwest of Whim Creek in the Pilbara region of WA. Read more...

Scarborough Project Nearshore Component

Last updated: June 14, 2022

The Proposal would include the following activities: shore crossing site preparation including installation of temporary facilities along the shoreline at the Pluto LNG Facility to facilitate the installation of the trunkline in shallower depths preparation works associated with the installation of the trunkline including dredging and associated spoil disposal at existing spoil grounds trunkline installation (about 32.7 kilometres long within State waters) shore crossing site reinstatement rock... Read more...

Wheatstone Development Proposal (S46) [2178]

Last updated: February 2, 2022

Conditions 6-12, 9-1 to 9-5 inclusive, and 12-1 to 12-8 inclusive of Ministerial Statement 873 are to be removed from the statement and conditions 9-1 to 9-5 inclusive and conditions 12-1 to 12-8 inclusive are to be transferred into a new ministerial statement. The change will facilitate the transfer of conditions relevant to the operation of port facilities from Chevron Australia Pty Ltd to the Pilbara Ports Authority via this new Ministerial Statement. Read more...

Mardie Project

Last updated: November 24, 2021

Mardie Minerals Pty Ltd proposes to develop a high volume salt and Sulphate of Potash project at Mardie, approximately 80 km south west of Karratha, in the Pilbara Region of Western Australia. The proposal would utilise seawater and evaporation to produce a concentrated salt product and other associated products., The proposal includes a seawater intake, evaporation ponds, processing plant, bitterns disposal pipeline and outfall, desalination plant, freshwater supply bores and associated... Read more...

Cape Preston East Iron Ore Export Facility (s46) [2183]

Last updated: August 6, 2020

Change to Extension of Timeframe for substantial commencement. Read more...

Balla Balla Export Facilities (s46) [2220]

Last updated: January 20, 2020

The Minister for Environment has requested that the Environmental Protection Authority (EPA) inquire into and report on the matter of changing the implementation conditions in Ministerial Statement 945 relating to Forge Resources Swan Pty Ltd’s Balla Balla Export Facilities proposal. Read more...

Onslow Marine Support Base Stage 2 Capital Dredging

Last updated: March 6, 2019

Onslow Marine Support Base Pty Ltd is proposing to modify and extend the Beadon Creek harbour approach channel, turning basin and berth pocket as part of Stage 2 of the Onslow Marine Support Base (OMSB) proposal. The proposed capital dredging will enable offshore supply vessels to access the newly constructed OMSB land-backed wharf facility (Stage 1) within the Beadon Creek Maritime Facility. 930,000 cubic metres of dredge material will be disposed of onshore to a 44 hectare Dredge material... Read more...

Cape Preston East – Multi-Commodity Export Facility

Last updated: November 12, 2018

The proposal is to construct and operate an iron ore export facility at Cape Preston East in the Pilbara region of WA. Read more...

Gorgon Gas Development Fourth Train Expansion Proposal

Last updated: April 30, 2015

To expand the liquefied natural gas (LNG) production capacity of the existing proposal from 15 million tonnes per annum (Mtpa) to 20 Mtpa (nominal). Read more...

Onslow Solar Salt Project (s46)

Last updated: February 12, 2013

Inquiry under s46 regarding proposed amendments to the Onslow Solar Salt Project, the subject of  Ministerial Statement 401 . The changes to the project are to allow the start-up production to increase from 1.5 Mtpa to 2.5 Mtpa. Modifications proposed include: expansion of condenser pond area from 70 km 2 to 80 km 2 ; expansion of the crystalliser pond area from 7.2 km 2 to 8.2 km 2 ; area for storage of bitterns; extension of the jetty structure by 300 m; extension of the dredged approach... Read more...

Anketell Point Port Development, Antonymyre, Shire of Roebourne

Last updated: January 30, 2013

The proposal is to construct and operate a multi-user deep-water port with iron ore stockpiling, transfer and ship loading facilities and ancillary infrastructure at Anketell Point. The proposal allows for facilities required by the Proponent and future third parties to be developed. Read more...

Port Hedland Outer Harbour Development

Last updated: February 28, 2012

The proposal is to construct and operate the Outer Harbour Development which includes landside and marine infrastructure for the handling and export of iron ore from BHPBIO’s operations. The Boodarie stockyard infrastructure will supply an overland conveyor to a transfer pad located to the west of the existing Finucane Island facilities. A piled jetty will transfer ore material to the ship loaders located at the piled wharf. Read more...

Macedon Gas Development

Last updated: January 17, 2012

The proposal is to construct a sub sea pipeline, onshore gas treatment and compression plant, and sales gas pipeline. The subsea pipeline from the Macedon Gas Field (100 kilometres west of Onslow) connects to the onshore gas treatment and compression plant at Ashburton North (15 kilometres southwest of Onslow). The sales gas pipeline connects the onshore facility to the Dampier to Bunbury Natural Gas (DBNG) Pipeline. Read more...

Pages

  • 1
  • 2
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.