Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Iron Ore (16) Apply Iron Ore filter
  • Infrastructure (12) Apply Infrastructure filter
  • Power generation (8) Apply Power generation filter
  • Land use (5) Apply Land use filter
  • Gold (4) Apply Gold filter
  • Bauxite (3) Apply Bauxite filter
  • Industrial (3) Apply Industrial filter
  • Mineral sands (3) Apply Mineral sands filter
  • Sand, rock, gravel and clay (3) Apply Sand, rock, gravel and clay filter
  • Oil and gas (2) Apply Oil and gas filter
  • Salt (2) Apply Salt filter
  • Utilities (2) Apply Utilities filter
  • Aquaculture (1) Apply Aquaculture filter
  • Lithium (1) Apply Lithium filter
  • Nickel (1) Apply Nickel filter

Filter by current status:

  • Decision on whether to assess has been published (18) Apply Decision on whether to assess has been published filter
  • Ministerial Statement published (11) Apply Ministerial Statement published filter
  • Environmental Scoping Document approved (9) Apply Environmental Scoping Document approved filter
  • EPA Report and Recommendations released - appeals open (7) Apply EPA Report and Recommendations released - appeals open filter
  • Assessment on Proponent Information – public submission period closed (3) Apply Assessment on Proponent Information – public submission period closed filter
  • Environmental Review document open for public submissions (3) Apply Environmental Review document open for public submissions filter
  • Ministerial Statement withdrawn under s.47A (3) Apply Ministerial Statement withdrawn under s.47A filter
  • Assessment has been terminated under s40A of the EP Act (2) Apply Assessment has been terminated under s40A of the EP Act filter
  • Assessment on Proponent Information – Request for More Information published (2) Apply Assessment on Proponent Information – Request for More Information published filter
  • Public Environmental Review period closed (2) Apply Public Environmental Review period closed filter
  • Assessment on Proponent Information – open for public submissions (1) Apply Assessment on Proponent Information – open for public submissions filter
  • EPA Report and Recommendations released - not appealable (1) Apply EPA Report and Recommendations released - not appealable filter
  • Response to submission published (1) Apply Response to submission published filter

Filter by relevant environmental factors:

  • (-) Remove Flora and Vegetation filter Flora and Vegetation
  • Terrestrial Fauna (57) Apply Terrestrial Fauna filter
  • Social Surroundings (53) Apply Social Surroundings filter
  • Inland Waters (43) Apply Inland Waters filter
  • Subterranean Fauna (23) Apply Subterranean Fauna filter
  • Marine Environmental Quality (16) Apply Marine Environmental Quality filter
  • Terrestrial Environmental Quality (13) Apply Terrestrial Environmental Quality filter
  • Benthic Communities and Habitats (11) Apply Benthic Communities and Habitats filter
  • Coastal Processes (11) Apply Coastal Processes filter
  • Landforms (10) Apply Landforms filter
  • Marine Fauna (10) Apply Marine Fauna filter
  • Greenhouse Gas Emissions (9) Apply Greenhouse Gas Emissions filter
  • Inland Waters Environmental Quality (7) Apply Inland Waters Environmental Quality filter
  • Hydrological Processes (5) Apply Hydrological Processes filter
  • Air Quality (3) Apply Air Quality filter

Filter by Proponent:

  • BHP Iron Ore Pty Ltd (4) Apply BHP Iron Ore Pty Ltd filter
  • Alcoa of Australia Limited (3) Apply Alcoa of Australia Limited filter
  • Chichester Metals Pty Ltd (2) Apply Chichester Metals Pty Ltd filter
  • Main Roads Western Australia (2) Apply Main Roads Western Australia filter
  • Pilbara Energy (Generation) Pty Ltd (2) Apply Pilbara Energy (Generation) Pty Ltd filter
  • Regional Power Corporation T/A Horizon Power (2) Apply Regional Power Corporation T/A Horizon Power filter
  • Rottnest Island Authority (2) Apply Rottnest Island Authority filter
  • Tronox Management Pty Ltd (2) Apply Tronox Management Pty Ltd filter
  • Water Corporation (2) Apply Water Corporation filter
  • 5 Star Margaret River Pty Ltd and The Beach Village Pty Ltd. (1) Apply 5 Star Margaret River Pty Ltd and The Beach Village Pty Ltd. filter
  • Atlas Iron Pty Ltd (1) Apply Atlas Iron Pty Ltd filter
  • BHP Billiton Iron Ore Pty Ltd (1) Apply BHP Billiton Iron Ore Pty Ltd filter
  • Cable Sands (WA) Pty Ltd (1) Apply Cable Sands (WA) Pty Ltd filter
  • Colchester Pty Ltd (1) Apply Colchester Pty Ltd filter
  • Crimson Metals Pty Ltd (1) Apply Crimson Metals Pty Ltd filter
  • DBNGP (WA) Nominees Pty Ltd (1) Apply DBNGP (WA) Nominees Pty Ltd filter
  • De Grey Mining Ltd (1) Apply De Grey Mining Ltd filter
  • Department of Transport (1) Apply Department of Transport filter
  • Director General of the Department of Transport on behalf of the State of Western Australia (1) Apply Director General of the Department of Transport on behalf of the State of Western Australia filter
  • Electricity Networks Corporation trading as Western Power (1) Apply Electricity Networks Corporation trading as Western Power filter
  • Gascoyne Gateway Ltd (1) Apply Gascoyne Gateway Ltd filter
  • GINDALBIE METALS LTD (1) Apply GINDALBIE METALS LTD filter
  • Hancock Prospecting Pty Ltd (1) Apply Hancock Prospecting Pty Ltd filter
  • Infinite Green Energy Limited (1) Apply Infinite Green Energy Limited filter
  • Italia Stone Group Pty Ltd (1) Apply Italia Stone Group Pty Ltd filter
  • Ivan Yujnovich (1) Apply Ivan Yujnovich filter
  • K + S Salt Australia Pty Ltd (1) Apply K + S Salt Australia Pty Ltd filter
  • Kalgoorlie Consolidated Gold Mines Pty Ltd (1) Apply Kalgoorlie Consolidated Gold Mines Pty Ltd filter
  • Karara Mining Limited (1) Apply Karara Mining Limited filter
  • Leichhardt Industrials Pty Ltd (1) Apply Leichhardt Industrials Pty Ltd filter
  • MEPAU Perth Basin Pty Ltd (1) Apply MEPAU Perth Basin Pty Ltd filter
  • Mount Gibson Mining Limited (1) Apply Mount Gibson Mining Limited filter
  • Mt Gibson Mining (1) Apply Mt Gibson Mining filter
  • Murchison Hydrogen Renewables Pty Ltd as trustee for Murchison Hydrogen Renewables Project Trust (1) Apply Murchison Hydrogen Renewables Pty Ltd as trustee for Murchison Hydrogen Renewables Project Trust filter
  • Newmont Boddington Gold Pty Ltd (1) Apply Newmont Boddington Gold Pty Ltd filter
  • Perdaman Chemicals and Fertilisers Pty Ltd (1) Apply Perdaman Chemicals and Fertilisers Pty Ltd filter
  • Process Minerals International (PMI) a wholly owned subsidiary of Mineral Resources Limited (MinRes) (ACN 118 549 910) (1) Apply Process Minerals International (PMI) a wholly owned subsidiary of Mineral Resources Limited (MinRes) (ACN 118 549 910) filter
  • Ravensthorpe Nickel Operations Pty Ltd (1) Apply Ravensthorpe Nickel Operations Pty Ltd filter
  • Robe River Mining Co. Pty. Ltd (1) Apply Robe River Mining Co. Pty. Ltd filter
  • Robe River Mining Co. Pty Ltd. (1) Apply Robe River Mining Co. Pty Ltd. filter
  • Roy Hill Iron Ore Pty Ltd (1) Apply Roy Hill Iron Ore Pty Ltd filter
  • Simcoa Operations Pty Ltd (1) Apply Simcoa Operations Pty Ltd filter
  • Smiths 2014 Pty Ltd (1) Apply Smiths 2014 Pty Ltd filter
  • Southern Ports Authority (1) Apply Southern Ports Authority filter
  • Talison Lithium Australia Pty Ltd (1) Apply Talison Lithium Australia Pty Ltd filter
  • Tassal Operations Pty Ltd (1) Apply Tassal Operations Pty Ltd filter
  • The Pilbara Infrastructure Pty Ltd (1) Apply The Pilbara Infrastructure Pty Ltd filter
  • VRX Silica Limited (1) Apply VRX Silica Limited filter
  • Water Corporation of Western Australia (1) Apply Water Corporation of Western Australia filter
  • WGEH Pty Ltd (1) Apply WGEH Pty Ltd filter

Filter by region:

  • Pilbara (22) Apply Pilbara filter
  • Perth (10) Apply Perth filter
  • Mid West (9) Apply Mid West filter
  • South West (9) Apply South West filter
  • Goldfields Esperance (3) Apply Goldfields Esperance filter
  • Kimberley (3) Apply Kimberley filter
  • Peel (3) Apply Peel filter
  • Wheatbelt (3) Apply Wheatbelt filter
  • Gascoyne (2) Apply Gascoyne filter

Filter by last updated:

  • (-) Remove 2025 filter 2025
  1. Home
  2. Proposal search
  3. 2025
  4. Flora and Vegetation

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Tonkin Highway Extension from Mills Road West, Gosnells, to South Western Highway, Mundijong

Last updated: March 27, 2025

The proposal is to design and construct the extension of the Tonkin Highway from Mills Road West to South Western Highway. The proposal is approximately 32 km in length and includes the design, construction and use of a highway of six lanes from Mills Road West to Mundijong Road and four lanes from Mundijong Road to South Western Highway. Read more...

East Hamersley Railway Project

Last updated: March 27, 2025

The Pilbara Infrastructure Pty Ltd., a subsidiary of Fortescue Metals Group, proposes to construct and operate a railway of 106 kilometres (km) and associated infrastructure. The East Hamersley Railway Project includes communications and signalling infrastructure, an ore loading facility, groundwater abstraction and discharge, borrow pits and quarries, culverts, bridges, diversion drains, pump station, construction camp, landfills and wastewater treatment plants, and other supporting... Read more...

Mining Area C – Southern Flank Significant Amendment

Last updated: March 24, 2025

BHP Iron Ore Pty Ltd is proposing to significantly amend the approved proposal at Mining Area C, located approximately 120 km north-west of Newman. The approved proposal consists of above and below water table mine pits and associated infrastructure, groundwater abstraction, dewatering and surplus water infrastructure, ore processing facilities, ore transportation infrastructure, haul and access roads, and ore and topsoil stockpiles. The significant amendment proposal involves increased... Read more...

Jimblebar Hub Significant Amendment

Last updated: March 24, 2025

The Proposal includes the expansion and amalgamation of existing operations at: Jimblebar Iron Ore Revised Proposal (Ministerial Statement (MS 1126), Orebody 18 Iron Ore Mine (MS 439, MS 1012), Orebody 31 Iron Ore Mine (MS 1021), to include new above and below water table mining, overburden storage areas, beneficiation plant, overland conveyor, creek diversions, haul and access roads, pipelines and associated infrastructure. All mines and associated elements are proposed to be consolidated into... Read more...

Hard Rock Quarry, Lot 800 Pruden Road, Whitby

Last updated: March 23, 2025

Italia Stone Group proposes to develop a hard rock quarry at Lot 800 Pruden Road Whitby, approximately 3.5 kilometres east of Mundijong in the Shire of Serpentine-Jarrahdale. The proposed quarry is on freehold land and is for the extraction of 50,000 to 100,000 tonnes of hard rock per annum for a period of 20 years. The material will be extracted by drill and blast methods and hauled by truck to a processing area for crushing and stockpiling on site. Read more...

Turkey Point Access Road and Bridge

Last updated: March 17, 2025

The Proposal is to develop a new bridge with a single lane dual carriage road and dual use path over the Preston River, to Turkey Point, Bunbury, Western Australia. The Proposal requires a disturbance footprint of 9.59 ha within the overall Proposal Development Envelope (DE) of 11.34 ha. Subtropical Temperate Coastal Saltmarsh Threatened Ecological Community (VT03 and VT04) is present within the Proposal DE and will require clearing of approximately 1.36 ha. 1.22 ha has been identified as... Read more...

Alkimos Seawater Desalination Plant

Last updated: March 13, 2025

The Western Australian Water Corporation is proposing to construct the Alkimos Seawater Desalination Plant (ASDP) as part of Perth’s Integrated Water Supply Scheme which aims to provide additional sources of drinking water to supplement the existing metropolitan water supply. The ASDP Proposal will be located within the Alkimos Water Precinct (Lot 1050 Marmion Avenue), approximately 40 km north of the Perth, within the northwest corridor, north of Quinns Rock beach and south of Yanchep beach.... Read more...

Mindy South Iron Ore Mine

Last updated: March 7, 2025

Chichester Metals Pty Ltd is proposing to construct and operate an iron ore mine approximately 55 km north-west of Newman, and 30 km south of Fortescue’s existing Nyidinghu project in the Pilbara region. The proposal would require a disturbance footprint of 12,487 ha and is located within a 42,331 ha mine development envelope. The proposal is located within the Nyiyaparli and Nyiyaparli #3 Native Title determination area (WCD 2018/008) The proposal includes both above and below water table open... Read more...

Ravensthorpe Nickel Project (s46)

Last updated: March 4, 2025

Inquiry under s46 into the request for a number of substantial changes to the Ravensthorpe Nickel Project, located approximately 35 km east of Ravensthorpe, the subject of Ministerial Statement 509 . In summary, the proposed changes include: mining of additional ore reserves contained within the Shoemaker-Levy and Hale-Bopp deposits and a resulting increase in clearing within the Bandalup Corridor; changes to the processing of ore and the final product: a) deletion of nickel electrowinning,... Read more...

Tutunup Titanium Minerals Mine

Last updated: February 25, 2025

The proposal is for the development of a titanium minerals mine at Tutunup, approximately 20 km east of Busselton. The proposal has the following main components: disturbance of 120 hectares of mainly cleared agricultural land; construction of water and fines dams, and topsoil, tails and overburden stockpiles; dewatering and mining, using dry mining techniques at up to two million tonnes per annum; abstraction of groundwater from the Yarragadee aquifer for process use; haulage of the Heavy... Read more...

Gascoyne Gateway Marine Complex

Last updated: February 17, 2025

Gascoyne Gateway Ltd proposes to build, own and operate a multipurpose marine complex in Exmouth that will service a variety of vessels including but not limited to cruise liners and associated ecotourism activities, Defence and marine supply vessels. The project will not be utilised for livestock or iron ore. The Proposal site is located 10 kilometres south of the Exmouth township and immediately south of the Ingram Street light industrial area; opposite the Exmouth landfill site and to the... Read more...

Outer Harbour Port Development, Kwinana

Last updated: February 4, 2025

The Proposal is to construct and operate a new multimodal port in the Kwinana Industrial Area (KIA), approximately 30 km south of Perth. The Proposal includes: A port facility. Adjacent areas of landside development. An offshore breakwater. Dredging for a second main channel. Dredging for access channels, turning basins and berthing areas. Use of dredge material for beneficial re-use and, where required, placement in approved marine placement areas. Removal of the disused Kwinana Bulk Berth 1 (... Read more...

Fimiston Gold Mine Operations Extension (Stage 3) and Mine Closure Planning: Revised Proposal - Fimiston South Project

Last updated: February 3, 2025

Kalgoorlie Consolidated Gold Mines is seeking to expand the Fimiston Gold mine operations (Fimiston), located 600 kilometres East of Perth, and adjacent to the City of Kalgoorlie-Boulder, Western Australia. The proposal is a significant amendment to the current Fimiston Gold Mine Operations Extension (Stage 2) and Mine Closure Planning, approved under Ministerial Statement 782, operated by Kalgoorlie Consolidated Gold Mines (KCGM). The proposal is for the expansion of the Fimiston operations in... Read more...

Shine Iron Ore Project

Last updated: January 29, 2025

The proposal is to develop an iron ore mine located approximately 68 kilometres south-east of Yalgoo and 30 kilometres north-east of the Greater Karara Iron Ore Project in the Shire of Yalgoo. Read more...

Shine iron Ore Project (s46) [2212]

Last updated: January 29, 2025

Change Condition 3 to extend the time limit of authorisation for substantial commencement of the proposal Read more...

Extension Hill haematite haulage, road and rail siding

Last updated: January 29, 2025

Mount Gibson Mining Limited proposes to upgrade, widen and straighten existing local roads and construct and operate a rail siding south of Perenjori, to facilitate the transport of hematite iron ore from the already approved Extension Hill mine site at Mount Gibson to Geraldton Port for export. Read more...

Murchison Hydrogen Renewables Project

Last updated: January 24, 2025

The Proposal will use combined onshore wind and solar energy of approximately 5.2 gigawatt (GW) capacity to produce green hydrogen which will be converted to an estimated 2 Million tonnes per annum (Mtpa) of green ammonia for export to emerging green energy markets. The Proposal is located within the Shire of Northampton, Western Australia (WA), approximately 20 km north of Kalbarri. The Proposal comprises the following major components: a wind and solar farm with a combined installed capacity... Read more...

Port Hedland Iron Project – Stage 1 (formerly Port Hedland Green Steel Project – Stage 1)

Last updated: January 22, 2025

Port Hedland Iron Pty Ltd (formerly Port Hedland Green Steel) proposes to develop a large-scale downstream iron ore processing facility known as the Port Hedland Green Steel Project – Stage 1. The proposal is located in the Boodarie Strategic Industrial Area (BSIA) approximately 10 km south-west of Port Hedland in the Pilbara region. The proposal will consist of a pellet plant and a hot briquette iron (HBI) plant, consuming approximately 3 - 3.5 million tonnes per annum (Mtpa) of iron ore. Most... Read more...

Perdaman Urea Project

Last updated: January 21, 2025

Perdaman Chemicals and Fertilisers Pty Ltd intends to construct and operate a urea plant with a production capacity of approximately 2 million tonnes per annum (Mtpa) on Sites C and F within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula. Both sites are located adjacent to the Murujuga National Park. The EPA considered the Study of the Cumulative Impacts of Air Emissions in the Murujuga Airshed in its assessment of the Perdaman Urea Project. Read more...

Waitsia Gas Project Stage 2

Last updated: January 21, 2025

The Waitsia Gas Project Stage 2 is a conventional gas proposal located approximately 16km East-South-East of the Dongara-Port Denison town sites. The proposal includes clearing of up to 17 ha of native vegetation to support the following: Construction and operation of a new gas processing plant with a maximum export capacity of 250 terajoules per day; Drilling of up to 6 new production wells to supplement the existing 2 wells; and Installation of a gas gathering system comprising of flowlines... Read more...

Pages

  • « first
  • ‹ previous
  • 1
  • 2
  • 3
  • 4
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.