Perdaman Urea Project

Project
Proposal description: 

Perdaman Chemicals and Fertilisers Pty Ltd intends to construct and operate a urea plant with a production capacity of approximately 2 million tonnes per annum (Mtpa) on Sites C and F within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula. Both sites are located adjacent to the Murujuga National Park.

The EPA considered the Study of the Cumulative Impacts of Air Emissions in the Murujuga Airshed in its assessment of the Perdaman Urea Project.

Assessment Number: 
2184
Region: 
Referred under EP Act: 
s38
Industry sector: 
Last updated: 
September 6, 2021
Current Status: 
EPA Report and Recommendations released - appeals closed
EPA Report and Recommendations released - appeals closed