This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: July 30, 2025
Yindjibarndi Energy Corporation is proposing to develop the Baru-Marnda Renewable Energy Project, approximately 50 km south of Karratha, in the Pilbara region of Western Australia. The proposal is located on Yindjibarndi Ngurra country where Yindjibarndi People hold exclusive possession native title rights and interests. The proposal comprises 133 wind turbines and four solar array areas generating up to 1,000 and 500 Megawatts respectively. Other associated infrastructure includes battery... Read more...Last updated: July 22, 2025
The Western Green Energy Hub is a proposal to design, construct and operate a large-scale wind and solar power project to produce value added products, with the base case assuming green ammonia production. The proposal is situated on WA Mirning Native Title determined land in the far southeast of Western Australia in the Shire of Dundas and City of Kalgoorlie-Boulder, to the northwest of Eucla in the South Coast Region. The proposal will be located on Unallocated Crown Land and pastoral leases... Read more...Last updated: July 7, 2025
Horizon Power proposes to construct and operate the Derby Future Energy System (FES) for energy supply to the town of Derby within the Kimberley region of Western Australia. The proposal comprises ground-mounted solar photovoltaic (PV) system up to 21 megawatts (MW), battery energy storage systems (BESS) up to 10 MW, a new thermal power station up to 8 MW, and a transmission network connection route. The thermal power station will be installed adjacent to the existing power station on Broome... Read more...Last updated: June 6, 2025
The proposal is to construct and operate a wind farm and linear infrastructure to provide renewable energy to Fortescue mining operations within the Pilbara. The proposal comprises of wind turbines, 220 kV transmission lines, substations and switchyards, 33 kV reticulation lines, a borefield, roads, pipelines, corridors of overhead lines, battery energy storage, accommodation camps, wastewater treatment plant, optional airstrip and supporting infrastructure. The Proposal is located... Read more...Last updated: June 3, 2025
Horizon Power proposes to construct and operate the Broome Future Energy System (FES) for energy supply to the town of Broome within the Kimberley region of Western Australia. The proposal comprises ground-mounted solar photovoltaic (PV) system up to 90 megawatts (MW), battery energy storage systems (BESS) and a network connection route. The solar PV and BESS will be installed at a site approximately 10 km north of Broome. A network connection route will connect the solar PV and BESS to the... Read more...Last updated: May 26, 2025
The Proposal is for the construction and operation of a renewable energy solar generation hub to power Fortescue mining operations in the Pilbara region. It is located approximately 120 km south of Port Hedland and is within the Kariyarra Native Title determination area. The Proposal comprises the installation of solar panels and substation with an estimated total capacity of 644 MW and 220 kV transmission line spurs connecting the Proposal to Fortescue’s existing Pilbara Energy Connect (PEC)... Read more...Last updated: April 13, 2025
Infinite Green Energy propose to construct and operate a green energy wind and solar powered hydrogen production facility within freehold lots 3, 4, 100 and 6110 located in Arrowsmith 30km south of Dongara, within the Shire of Irwin, Western Australia (WA). Infinite Blue Energy purchased the 1929.68 ha property due to the site’s abundance of wind and solar power combined with abundant quantity of quality fresh water. The previous property use involved sheep, cattle and goats grazing. The... Read more...Last updated: January 24, 2025
The Proposal will use combined onshore wind and solar energy of approximately 5.2 gigawatt (GW) capacity to produce green hydrogen which will be converted to an estimated 2 Million tonnes per annum (Mtpa) of green ammonia for export to emerging green energy markets. The Proposal is located within the Shire of Northampton, Western Australia (WA), approximately 20 km north of Kalbarri. The Proposal comprises the following major components: a wind and solar farm with a combined installed capacity... Read more...Last updated: February 29, 2024
Woodside Energy Ltd (Woodside) proposes to construct and operate the Woodside Solar Facility in the Maitland Strategic Industrial Area, located approximately 15 kilometres south-west of Karratha, in the Pilbara region of Western Australia. The proposal will generate electricity (up to 500 megawatts) from a large-scale solar photovoltaic (PV) farm and includes energy storage (battery) infrastructure. The Proposal is only for the infrastructure associated with the generation and storage of... Read more...Last updated: February 5, 2024
Province Resources Ltd propose to use combined onshore wind and solar energy to produce green hydrogen and ammonia for export to the green energy market. The proposal is distributed across 3 distinct locations within the Shire of Carnarvon, Western Australia. The proposal will comprise the following major elements: • up to 945 ha (6.8 GW) of wind turbines and up to 10,000 ha of solar arrays (5.2 GW) • a new multiuser port facility with a material offloading facility and export terminal •... Read more...Last updated: October 18, 2023
Pilbara Energy (Generation) Pty Ltd proposes to construct and operate the Uaroo Renewable Energy Hub on the Uaroo and Emu Creek Pastoral Stations located 120 kilometres south of Onslow, in the Pilbara region of Western Australia. The proposal is to construct and operate a renewable energy generation hub to power Fortescue Metals Group Limited’s mining operations in the Pilbara. The proposal will generate electricity (up to 5.4 gigawatts) from up to 340 wind turbine generators and a solar farm.... Read more...Last updated: August 11, 2023
The proposal is to construct a nominal 260MW peaking power plant, consisting of: two open cycle air-cooled gas turbine generator sets; standby liquid fuel storage (1.5ML of ultra low sulphur diesel); and ancillary buildings and plant. The plant will predominantly use natural gas, and will operate as a peaking plant for meeting short duration, high power demands for electricity. The plant may also operate as spinning reserve, using gas at a very low load in anticipation of high demand. The... Read more...Last updated: February 25, 2019
New Energy Corporation Pty Ltd propose to revise the Waste to Energy technology for their approved Waste to Energy and Materials Recovery Facility on Lot 1 Office Road, 3 kilometres north-east of Rockingham in the Rockingham Industrial Zone (Shire of Rockingham). Read more...Last updated: October 22, 2018
Kondinin Energy Pty Ltd is proposing to construct and operate up to 46 wind turbines, an accompanying 125 ha of solar farm, energy storage and associated infrastructure, approximately 5 kilometres north east of Kondinin, Western Australia. The proposal will be established encompassing parts all or part of 19 freehold rural lots comprising approximately 3,105 hectares. Read more...Last updated: April 4, 2018
Griffin Power Pty Ltd, proposes to construct and operate a 200MW coal-fired power station known as the Bluewaters Power Station Phase II (Bluewaters II) adjacent to the proposed Bluewaters Power Station (Bluewaters I) on a site located approximately 4km north-east of Collie. It would be a subcritical coal-fired base-load generation facility with a nominal generating capacity of up to 200MW. The Bluewaters II Power Station would supplement the Bluewaters I Power Station and supply electricity... Read more...Last updated: January 12, 2017
Three Springs Solar Pty Ltd is proposing to construct and operate a 100MW solar photovoltaic power station on Lots M761-M764 and Lot 50 Bruce Road, approximately 2km north east of the Three Springs Townsite. The sites are predominately cleared farm land and no vegetation clearing is proposed. Read more...Last updated: September 17, 2010
The proposal is to construct and operate the Coolimba Power Station on a site located approximately 15 kilometres (km) south-south-west of Eneabba, and to establish an approximately 20 km long and 100 metre (m) wide infrastructure corridor that will accommodate the construction and operation of: a natural gas pipeline lateral to connect the power station to either the Dampier to Bunbury Natural Gas Pipeline (DBNGP) or the Parmelia Gas Pipeline; and a 330 kV electricity transmission line to... Read more...Last updated: March 13, 2009
The proposal involves the construction and operation of a 40 Megawatt power plant fuelled by up to 380,000 tonnes (+/-10%) per annum of, Eucalyptus globulus, (Bluegum) and pine plantation wastes, a pipeline for water supply, and a power line connecting the power plant to the sub-station. Read more...Last updated: October 17, 2005
The proposal is to construct and operate a 330MW capacity advanced sub-critical coal-fired power station (known as Collie B) at the Collie Power Station Site, immediately adjacent to the existing ‘Collie A’ Power Station. It will be an advanced sub-critical coal fired base-load generation facility with a nominal generating capacity of up to 330MW. The Collie B Power Station will supply electricity to Western Power for the South West Interconnected System (SWIS) under the SWIS Power Procurement... Read more...