Uaroo Renewable Energy Hub

Project
Proposal description: 

Pilbara Energy (Generation) Pty Ltd proposes to construct and operate the Uaroo Renewable Energy Hub on the Uaroo and Emu Creek Pastoral Stations located 120 kilometres south of Onslow, in the Pilbara region of Western Australia. 

The proposal is to construct and operate a renewable energy generation hub to power Fortescue Metals Group Limited’s mining operations in the Pilbara. 

The proposal will generate electricity (up to 5.4 gigawatts) from up to 340 wind turbine generators and a solar farm. The proposal includes a battery energy storage system, substations, associated supporting infrastructure, tracks and roads, and corridors for electrical cabling. 

The proposal would include a disturbance footprint of up to 10,158 hectares (ha) within a development envelope of 61,525 ha.  

During construction, the proposal would require abstraction of up to 6.5 gigalitres at a rate of 1 gigalitre per annum (GL/a) of groundwater. During operation, groundwater abstraction would be up to 0.2 GL/a

Assessment Number: 
2341
Region: 
Referred under EP Act: 
s38
Industry sector: 
Last updated: 
October 18, 2023
Current Status: 
Assessment has been terminated under s40A of the EP Act
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info