Uaroo Renewable Energy Hub

Project
Proponent: 
Pilbara Energy (Generation) Pty Ltd
Proposal description: 

Pilbara Energy (Generation) Pty Ltd proposes to construct and operate the Uaroo Renewable Energy Hub on the Uaroo and Emu Creek Pastoral Stations located 120 kilometres south of Onslow, in the Pilbara region of Western Australia. 

The proposal is to construct and operate a renewable energy generation hub to power Fortescue Metals Group Limited’s mining operations in the Pilbara. 

The proposal will generate electricity (up to 5.4 gigawatts) from up to 340 wind turbine generators and a solar farm. The proposal includes a battery energy storage system, substations, associated supporting infrastructure, tracks and roads, and corridors for electrical cabling. 

The proposal would include a disturbance footprint of up to 10,158 hectares (ha) within a development envelope of 61,525 ha.  

During construction, the proposal would require abstraction of up to 6.5 gigalitres at a rate of 1 gigalitre per annum (GL/a) of groundwater. During operation, groundwater abstraction would be up to 0.2 GL/a

Assessment Number: 
2341
Region: 
Pilbara
Referred under EP Act: 
s38
Industry sector: 
Power generation
Last updated: 
October 18, 2023
Current Status: 
Assessment has been terminated under s40A of the EP Act
1. Referral
Comment on this referral: 
Uaroo Renewable Energy Hub
Comment period: 
Wednesday, 9 February, 2022 to Tuesday, 15 February, 2022
Referral documentation: 
PDF icon Attachment 1 - Uaroo Renewable Energy Hub Referral Form.pdf
PDF icon Attachment 2 - Uaroo Hub EPA Referral Supporting Content - Uaroo Emu Creek Rev 0.pdf
PDF icon Attachment 3 - Uaroo Renewable Energy Hub Proposal Content Document.pdf
PDF icon Amendment to referred proposal under 38C - Amended Proposal Content Document.pdf
PDF icon Amendment to referred proposal under 38C – Summary of Reasons.pdf
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Public Environmental Review
Extract of determination: 
PDF icon Uaroo Renewable Energy Hub
Preliminary Environmental Factors: 
Social Surroundings
Flora and Vegetation
Subterranean Fauna
Terrestrial Fauna
Inland Waters
Date published: 
Monday, 23 May, 2022
3. Assessment
Termination of assessment under s40A
Date of termination: 
Wednesday, 18 October, 2023
Termination notice: 
PDF icon Notice to Terminate Assessment - 181023