ProjectProponent: Griffin Electricity Pty LtdProposal description: The proposal is to construct and operate a 330MW capacity advanced sub-critical coal-fired power station (known as Collie B) at the Collie Power Station Site, immediately adjacent to the existing ‘Collie A’ Power Station. It will be an advanced sub-critical coal fired base-load generation facility with a nominal generating capacity of up to 330MW. The Collie B Power Station will supply electricity to Western Power for the South West Interconnected System (SWIS) under the SWIS Power Procurement Process (PPP). Note: The proposal was withdrawn on 17 October 2005 before the Minister's decision on implementation. Assessment Number: 1544Region: South WestReferred under EP Act: s38Industry sector: Power generationLast updated: October 17, 2005Current Status: Proposal withdrawn 2. Decision on whether to assess this proposalChair's Determination: Assess - Public Environmental ReviewPreliminary Environmental Factors: Air QualitySocial SurroundingsMarine Environmental QualityHydrological ProcessesDate published: Monday, 22 November, 2004 3. AssessmentScopingApproved: Monday, 20 December, 2004 Environmental ReviewPublic submissions: Monday, 24 January, 2005 to Monday, 21 March, 2005Environmental Review documentation: PER document (PDF, 14.17 MB)Proponent response to submissions: Proponent's response to submissions (PDF, 462.93 KB) RTS Attachment 1 - Collie Power Station Noise Map (PDF, 53.93 KB) RTS Attachment 2 - Bluewaters Power Station Noise Map (PDF, 61.09 KB) RTS Attachment 3 - Collie and Bluewaters Combined Noise Map (PDF, 70.31 KB) RTS Attachment 4 - Comparison of ENM vs SoundPlan Noise Models (PDF, 72.24 KB) RTS Attachment 5 - Coolangatta Noise Management Plan (PDF, 110.2 KB) RTS Attachment 6 - Health Impact Statement (PDF, 1.76 MB) RTS Attachment 7 - Letter to EPA from Griffin detailing greenhouse offsets (PDF, 109.9 KB) RTS Attachment 8 - Power Station Water Balance (PDF, 77.55 KB) RTS Attachment 9 - Griffin Energy Water Supply Strategy (PDF, 144.43 KB) RTS Attachment 10 - Environmental Management Plan (PDF, 14.39 MB) RTS Attachment 11 - Re-estimation of Hazard Index for Acid Gases (PDF, 106.67 KB) RTS Attachment 12 - Criteria Pollutants Health Effects (PDF, 115.17 KB) RTS Attachment 13 - Map Showing Saline Water Pipeline Location (PDF, 71.79 KB) 4. EPA Report on assessmentEPA Report Number: 1176EPA Report: Collie B Power Station (PDF, 1.14 MB)Key Environmental Factors: Air QualitySocial SurroundingsWaterInland Waters Environmental QualityDate published: Monday, 13 June, 2005Appeals close: Monday, 27 June, 2005