Project
Proponent: 
Griffin Electricity Pty Ltd
Proposal description: 

The proposal is to construct and operate a 330MW capacity advanced sub-critical coal-fired power station (known as Collie B) at the Collie Power Station Site, immediately adjacent to the existing ‘Collie A’ Power Station. It will be an advanced sub-critical coal fired base-load generation facility with a nominal generating capacity of up to 330MW. The Collie B Power Station will supply electricity to Western Power for the South West Interconnected System (SWIS) under the SWIS Power Procurement Process (PPP).

Note: The proposal was withdrawn on 17 October 2005 before the Minister's decision on implementation.

Assessment Number: 
1544
Region: 
South West
Referred under EP Act: 
s38
Industry sector: 
Power generation
Last updated: 
October 17, 2005
Current Status: 
Proposal withdrawn
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Public Environmental Review
Preliminary Environmental Factors: 
Social Surroundings
Marine Environmental Quality
Hydrological Processes
Date published: 
Monday, 22 November, 2004
3. Assessment
Scoping
Approved: 
Monday, 20 December, 2004
Environmental Review
Public submissions: 
Monday, 24 January, 2005 to Monday, 21 March, 2005
Environmental Review documentation: 
PDF icon PER document
Proponent response to submissions: 
PDF icon Proponent's response to submissions
PDF icon RTS Attachment 1 - Collie Power Station Noise Map
PDF icon RTS Attachment 2 - Bluewaters Power Station Noise Map
PDF icon RTS Attachment 3 - Collie and Bluewaters Combined Noise Map
PDF icon RTS Attachment 4 - Comparison of ENM vs SoundPlan Noise Models
PDF icon RTS Attachment 5 - Coolangatta Noise Management Plan
PDF icon RTS Attachment 6 - Health Impact Statement
PDF icon RTS Attachment 7 - Letter to EPA from Griffin detailing greenhouse offsets
PDF icon RTS Attachment 8 - Power Station Water Balance
PDF icon RTS Attachment 9 - Griffin Energy Water Supply Strategy
PDF icon RTS Attachment 10 - Environmental Management Plan
PDF icon RTS Attachment 11 - Re-estimation of Hazard Index for Acid Gases
PDF icon RTS Attachment 12 - Criteria Pollutants Health Effects
PDF icon RTS Attachment 13 - Map Showing Saline Water Pipeline Location
4. EPA Report on assessment
EPA Report Number: 
1176
EPA Report: 
PDF icon Collie B Power Station
Key Environmental Factors: 
Social Surroundings
Water
Inland Waters Environmental Quality
Date published: 
Monday, 13 June, 2005
Appeals close: 
Monday, 27 June, 2005

Source URL:https://www.epa.wa.gov.au/proposals/expansion-collie-power-station-collie-b