This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: May 5, 2025
Chichester Metals Pty Ltd, a subsidiary of Fortescue Metals Group, proposes to develop and operate an iron ore mine approximately 80 kilometres north-west of Newman. The Nyidinghu Iron Ore Mine proposal includes mine pits above and below the water table, an on-site ore processing from various sources, waste rock and tailings storage, an aerodrome, groundwater abstraction, surplus water management including aquifer recharge and other supporting infrastructure. The proposal has a development... Read more...Last updated: January 21, 2025
Perdaman Chemicals and Fertilisers Pty Ltd intends to construct and operate a urea plant with a production capacity of approximately 2 million tonnes per annum (Mtpa) on Sites C and F within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula. Both sites are located adjacent to the Murujuga National Park. The EPA considered the Study of the Cumulative Impacts of Air Emissions in the Murujuga Airshed in its assessment of the Perdaman Urea Project. Read more...Last updated: November 25, 2024
Albemarle Lithium Pty Ltd (Albemarle) is proposing to stablish the Albemarle Kemerton Plant, a Lithium hydroxide Product manufacturing plant and associated infrastructure, within the Kemerton Strategic Industrial Area (KSIA), approximately 17 kilometres north-east of Bunbury. The Albemarle Kemerton Plant will produce up to 100,000 tonne per annum (tpa) of lithium hydroxide monohydrate (Lithium Hydroxide Product) from five 20,000 tpa process trains and produce up to 1,100,000 tpa of tailings.... Read more...Last updated: September 27, 2024
The Utah Point Berth Project consists of two separate stages: Stage A: Dredging and Reclamation; and Stage B: Construction and Operation. Stage A, dredging and reclamation works for the UPBP was approved by the Minister for Environment as an amendment to the existing Fortescue Metals Group (FMG) approval and managed according to the approved conditions. The works for Stage A have been successfully completed. The EPA determined that Stage B, the construction and ongoing operation of stockyard... Read more...Last updated: July 4, 2024
Time limit for substantial commencement, review of the adequacy of existing implementation conditions to ensure consistency with the EPA’s current objectives for each environmental factor. Read more...Last updated: April 11, 2024
NW Interconnected Power Pty Ltd is seeking to develop the Asian Renewable Energy Hub. The proposal is to construct and operate a large-scale wind and solar hybrid renewable energy project, approximately 220 km east of Port Hedland, WA. The renewable energy will be exported via a subsea power cable to Indonesia and Singapore. Onshore components comprise a series of linear arrays of wind turbines (up to 1,743 turbines) and solar panels distributed across a 644,600 ha development envelope, with a... Read more...Last updated: April 2, 2024
DevelopmentWA is seeking to develop the Kemerton Strategic Industrial Area (KSIA) for the purpose of industrial and infrastructure development as a strategic proposal. The KSIA is located within the Shire of Harvey, 17 kilometres north of Bunbury. The KSIA key characteristics are: Development of the Kemerton Strategic industry Zone (Industry Core) which is approximately 2,024 hectares (ha). There is an approximate 50-year time period for development. Ultimate land use proposed is to be heavy... Read more...Last updated: November 27, 2023
Alcoa of Australia Limited is proposing to increase production at the Pinjarra Alumina Refinery (the refinery) and increase the rate of bauxite mining at the existing Huntly Mine within Mineral Lease 1SA (ML1SA) to supply 2.5 million tonnes per annum (Mtpa) bauxite, for export to third party customers. The Proposal comprises the following components: an increase in alumina production at the refinery by 5 percent, from 5.0 Mtpa to 5.25 Mtpa; A transition of the Huntly mine into the Myara North... Read more...Last updated: February 20, 2023
Project Haber Pty Ltd proposes to construct and operate a 1.4 million tonnes per annum (Mtpa) urea plant in East Arrowsmith (South Erregulla). The proposal is located approximately 280 km north of Perth and 45 km south east of Dongara, in the Shire of Three Springs. The urea plant comprises of an Air Separation Unit (ASU) producing nitrogen, oxygen and hydrogen for various processes; an ammonia synthesis unit; and a granulation and urea production unit. Supporting infrastructure includes gas... Read more...Last updated: August 4, 2022
Yara Pilbara Fertilisers Pty Ltd propose to modify the existing Pilbara Fertiliser project to include the development of a Renewable Hydrogen Plant and associated infrastructure. The proposal is located approximately 11 km north-west of Karratha in the Pilbara region of Western Australia. The proposal is adjacent to the National Heritage listed area and the Murujuga National Park. The proposal would include a total disturbance of 24.78 hectares. The proposal will result in reduction of... Read more...Last updated: October 28, 2021
Albemarle Lithium Pty Ltd (Albemarle) is proposing to stablish the Albemarle Kemerton Plant, a Lithium hydroxide Product manufacturing plant and associated infrastructure, within the Kemerton Strategic Industrial Area (KSIA), approximately 17 kilometres north-east of Bunbury. The Albemarle Kemerton Plant will produce up to 100,000 tonne per annum (tpa) of lithium hydroxide monohydrate (Lithium Hydroxide Product) from five 20,000 tpa process trains and produce up to 1,100,000 tpa of tailings.... Read more...Last updated: August 9, 2021
The original proposal is for mining of silica (quartzite) rock approximately 15 kilometres north of Moora on Mining Lease M70/191, and smelting to produce silicon, employing wood, charcoal, coal and the silica mined at Moora, in the Kemerton Industrial Area approximately 20 kilometres north of Bunbury in the Shire of Harvey. This revised proposal is for an increase from the approved three submerged electric arc furnaces to four submerged electric arc furnaces at the Kemerton site, and the... Read more...Last updated: May 25, 2021
The proposal is to construct industrial infrastructure and a Southern Harbour in Jervoise Bay south of the Northern Harbour precinct and including the Marine support facility. Read more...Last updated: May 10, 2021
The Munglinup Graphite Project is located in the South Coast region of Western Australia, approximately 105km west of Esperance, 85km east of Ravensthorpe and 4km north on Munglinup. MRC Graphite Pty Ltd propose to extract graphite from up to six open pits. The proposal will also include a processing plant, tailings storage facility, waste rock landforms, and associated infrastructure. The proposal would include a total disturbance of 350 hectares. Read more...Last updated: February 1, 2021
Australian Potash Limited proposes to abstract brine resources to produce a sulfate of potash (SOP) product at the Lake Wells Potash Project. The proposal area is located on and adjacent to the Lake Wells Playa Lake system (salt lake terrain), approximately 160km north-northeast of Laverton in Western Australia. The proposal would include construction of an SOP processing plant, brine abstraction bores, evaporation ponds, raw water bore field, accommodation village and other associated... Read more...Last updated: November 30, 2020
Austral Bricks is proposing the redevelopment of the Cardup Brickworks, which includes the expansion of the existing factory, increasing the design capacity from 200,000 to 250,000 tonnes per annum. The site is located in the southern extremity of Byford. Additional ancillary improvements include the installation of a new baghouse scrubber and a new primary crusher located in the floor of the pit. The proposal would include: Expanding the capacity from 200,000 to 250,000 tonnes per annum; New... Read more...Last updated: November 9, 2020
NW Interconnected Power Pty Ltd (the Proponent) is seeking to revise its approved proposal to develop the Asian Renewable Energy Hub. The proposal was previously referred under section 38 of the Environmental Protection Act 1986 (EP Act), assessed by the Environmental Protection Authority (EPA) at the level of Public Environmental Review (PER) (NW Interconnected Power 2019), and subsequently approved by the Western Australian Minister for Environment in October 2020. This referral is for ... Read more...Last updated: April 14, 2020
Eastern Metropolitan Regional Council propose to construct and operate a Community Recycling Centre (CRC) and Waste Transfer Station (WTS) within the existing Hazelmere Resource Recovery Park, at Lots 814, 100 and 301 Lakes Road Hazelmere, in the City of Swan. The CRC would be accepting a range of materials for reuse, recycling and disposal from community members, while the WTS would provide for the short-term storage capacity for consolidation of various waste streams including refuse and food... Read more...Last updated: June 7, 2019
Kalium Lakes Potash Pty Ltd is seeking to develop a sub-surface brine deposit to produce approximately 150 kilotonne per annum of Sulphate of Potash product and by-products. The process will involve evaporation and processing operations at the Beyondie, 10-Mile and Sunshine Lakes area. The Project is located approximately 160 kilometres south east of Newman, and 75 km east of the Kumarina Roadhouse, in the eastern Pilbara region of Western Australia. The proposal includes the development of... Read more...Last updated: December 3, 2018
Wesfarmers Chemicals, Energy & Fertilisers Limited proposes to construct and operate a methanol plant with a production capacity of approximately 5,000 tonnes per day ( tpd ) on Site E within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula. The proposal is adjacent to the Murujuga National Park. The proposal would result in the disturbance of approximately 75 hectares within Site E. Read more...