Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • (-) Remove Infrastructure filter Infrastructure
  • Iron Ore (5) Apply Iron Ore filter
  • Oil and gas (2) Apply Oil and gas filter
  • Gold (1) Apply Gold filter
  • Industrial (1) Apply Industrial filter
  • Land use (1) Apply Land use filter

Filter by current status:

  • Ministerial Statement published (15) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (6) Apply Decision on whether to assess has been published filter
  • Assessment has been terminated under s40A of the EP Act (2) Apply Assessment has been terminated under s40A of the EP Act filter
  • Assessment on Proponent Information – Request for More Information published (2) Apply Assessment on Proponent Information – Request for More Information published filter
  • Ministerial Statement withdrawn under s.47A (2) Apply Ministerial Statement withdrawn under s.47A filter
  • EPA Report and Recommendations released - appeals closed (1) Apply EPA Report and Recommendations released - appeals closed filter
  • Report and recommendations in preparation (1) Apply Report and recommendations in preparation filter
  • Seven-day public comment period closed (1) Apply Seven-day public comment period closed filter

Filter by relevant environmental factors:

  • Flora and Vegetation (14) Apply Flora and Vegetation filter
  • Social Surroundings (13) Apply Social Surroundings filter
  • Terrestrial Fauna (13) Apply Terrestrial Fauna filter
  • Marine Environmental Quality (8) Apply Marine Environmental Quality filter
  • Benthic Communities and Habitats (7) Apply Benthic Communities and Habitats filter
  • Terrestrial Environmental Quality (7) Apply Terrestrial Environmental Quality filter
  • 37 (5) Apply 37 filter
  • Inland Waters (5) Apply Inland Waters filter
  • Marine Fauna (5) Apply Marine Fauna filter
  • 3144 (4) Apply 3144 filter
  • Coastal Processes (4) Apply Coastal Processes filter
  • Inland Waters Environmental Quality (4) Apply Inland Waters Environmental Quality filter
  • Hydrological Processes (2) Apply Hydrological Processes filter
  • Subterranean Fauna (1) Apply Subterranean Fauna filter

Filter by Proponent:

  • Onslow Infraco Pty Ltd (2) Apply Onslow Infraco Pty Ltd filter
  • Port Hedland Port Authority (2) Apply Port Hedland Port Authority filter
  • API Management Pty Limited (1) Apply API Management Pty Limited filter
  • Aztec Resources Limited (1) Apply Aztec Resources Limited filter
  • City of Gosnells (1) Apply City of Gosnells filter
  • Commissioner of Main Roads Western Australia (Main Roads) (1) Apply Commissioner of Main Roads Western Australia (Main Roads) filter
  • CSBP Limited (1) Apply CSBP Limited filter
  • Department of Environment and Conservation (1) Apply Department of Environment and Conservation filter
  • Department of Transport (1) Apply Department of Transport filter
  • Electricity Networks Corporation trading as Western Power (1) Apply Electricity Networks Corporation trading as Western Power filter
  • Fortescue Metals Group Limited (1) Apply Fortescue Metals Group Limited filter
  • Kimberley Ports Authority (1) Apply Kimberley Ports Authority filter
  • Leichhardt Port Pty Ltd (1) Apply Leichhardt Port Pty Ltd filter
  • Mid West Ports Authority (1) Apply Mid West Ports Authority filter
  • Newmont Boddington Gold Pty Ltd (1) Apply Newmont Boddington Gold Pty Ltd filter
  • NWIOA Ops. Pty Ltd trading as North West Infrastructure (1) Apply NWIOA Ops. Pty Ltd trading as North West Infrastructure filter
  • Onslow Iron Pty Ltd and API Management Pty Limited (1) Apply Onslow Iron Pty Ltd and API Management Pty Limited filter
  • Pilbara Ports (1) Apply Pilbara Ports filter
  • Pilbara Ports Authority (1) Apply Pilbara Ports Authority filter
  • Public Transport Authority (1) Apply Public Transport Authority filter
  • Roy Hill Infrastructure Pty Ltd (1) Apply Roy Hill Infrastructure Pty Ltd filter
  • SF Irrigation Cooperative Limited (1) Apply SF Irrigation Cooperative Limited filter
  • South West Development Commission (1) Apply South West Development Commission filter
  • The Department of Agriculture and Food (1) Apply The Department of Agriculture and Food filter
  • Water Corporation (1) Apply Water Corporation filter
  • Western Australia Beach and Golf Resort Pty Ltd (1) Apply Western Australia Beach and Golf Resort Pty Ltd filter
  • Woodside Energy Ltd (1) Apply Woodside Energy Ltd filter
  • Woodside Energy Ltd (1) Apply Woodside Energy Ltd filter

Filter by region:

  • Pilbara (15) Apply Pilbara filter
  • Perth (6) Apply Perth filter
  • South West (4) Apply South West filter
  • Goldfields Esperance (2) Apply Goldfields Esperance filter
  • Kimberley (2) Apply Kimberley filter
  • Mid West (1) Apply Mid West filter

Filter by last updated:

  • (-) Remove 2024 filter 2024
  1. Home
  2. Proposal search
  3. Infrastructure
  4. 2024

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

West Pilbara Iron Ore Project – Stage 1 (s46) [2490]

Last updated: November 25, 2024

Change the implementation conditions relating to greenhouse gas emissions Read more...

Ashburton Infrastructure Project (s46) [2490]

Last updated: November 25, 2024

Change the implementation conditions relating to greenhouse gas emissions Read more...

Pluto Liquified Natural Gas Development (Site B Option) Burrup Peninsula (s46) [2490]

Last updated: November 25, 2024

Change the implementation conditions relating to greenhouse gas emissions Read more...

Ashburton Infrastructure Project

Last updated: November 25, 2024

The Proposal is located in the Pilbara region of Western Australia within a development envelope of 20,821 ha and clearing no more than 1,564 ha. Onslow Infraco Pty Ltd (herein MRL a wholly owned subsidiary of Mineral Resources Limited) is proposing to develop: • A fully sealed private haul road, approximately 125km in length • Gas pipeline and ancillary haul road infrastructure. • Storage and bulk handling of ore at the Port of Ashburton. • Dredging a dedicated berthing pocket adjacent to the... Read more...

Pluto LNG Development (Site B Option), Burrup Peninsula

Last updated: November 25, 2024

The construction of facilities for the development of the Pluto Gas Field on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on the Burrup Peninsula. Extensive dredging will be undertaken adjacent to the export facility. Read more...

West Pilbara Iron Ore Project Stage 1 - Mine and Rail

Last updated: November 25, 2024

The proposal is to develop eight iron ore deposits at five locations, between 35 and 85 kilometres (km) south of Pannawonica. A heavy-haulage railway approximately 285 km in length would be developed to connect the mine area with a port to be constructed at Anketell Point, 25 km north-east of Karratha. The project would produce up to 30 million tonnes per annum (Mtpa) of iron ore. This Ministerial Statement was superseded by Statement 1026 and Statement 1027 published on 4 February 2016. Read more...

Kennedy Bay Public Jetty

Last updated: November 12, 2024

The proposal is for constructing and operating a recreational jetty in Port Kennedy, located in south Warnbro Sound with the City of Rockingham, Western Australia. The Jetty proposal will provide: an elevated main deck low-level short-stay vessel berth central jetty ‘node’ to include a diving platform, terracing, stairs, swimming platform, ladders demarcated swimming area Read more...

Coastal Walk Trail from Point Ann to Hamersley Inlet - Fitzgerald River National Park

Last updated: October 16, 2024

The proposal is to construct and maintain a 45 kilometre (km) coastal walk trail from Point Ann to Hamersley Inlet, through the Wilderness Management Zone of the Fitzgerald River National Park. Camping facilities such as sleeping huts, water collection facilities and toilets would be constructed at camping points along the walk trail. The proposal would also require vehicle access tracks for ongoing maintenance of the walk trail, camping facilities, and emergency response. Read more...

Garden Street Extension, Southern River

Last updated: October 14, 2024

The City of Gosnells (the Proponent) proposes to extend Garden Street between Harpenden Street and Holmes Street in Southern River, which will involve the construction of an 840 m section of a dual carriageway (two lanes each direction). The Proposal is located predominantly within the suburb of Southern River, approximately 17 km south-east of Perth Central Business District (CBD) and intersects within Bush forever site 125 (Holmes Street Bushland). The construction and implementation of the... Read more...

Geraldton Port Maximisation Project

Last updated: October 14, 2024

The Mid West Ports Authority is proposing marine infrastructure upgrades at the Port of Geraldton. The Proposal has a disturbance footprint of up to 38 hectares (ha), of which 17 ha is a new footprint and 21 ha the existing port, within a 75 ha development envelope. The Proposal is a significant amendment to the Geraldton Port Enhancement Project and Preparatory Works for the Town Beach Foreshore Redevelopment (Original Proposal) (Ministerial statement 600), and consists of: dredging and land... Read more...

Roy Hill Infrastructure Railway

Last updated: October 10, 2024

The proposal is to construct and operate a railway of approximately 320 kilometres length and associated infrastructure to transport iron ore from the Roy Hill 1 Iron Ore Mining Project Stages 1 and 2 to facilities at Port Hedland. Read more...

Utah Point Berth Project (Stage B)

Last updated: September 27, 2024

The Utah Point Berth Project consists of two separate stages: Stage A: Dredging and Reclamation; and Stage B: Construction and Operation. Stage A, dredging and reclamation works for the UPBP was approved by the Minister for Environment as an amendment to the existing Fortescue Metals Group (FMG) approval and managed according to the approved conditions. The works for Stage A have been successfully completed. The EPA determined that Stage B, the construction and ongoing operation of stockyard... Read more...

State Barrier Fence Esperance Extension

Last updated: September 18, 2024

The Department of Agriculture and Food, Western Australia (DAFWA) proposes to erect a 660 kilometre long, 1.35 metre high extension to the existing State Barrier Fence from its current termination point near the town of Ravensthorpe to the east of Esperance near Cape Arid National Park. The purpose of the Esperance extension is to protect the south-eastern agricultural enterprises from predation and grazing from wild populations. This proposal was originally referred by the Conservation Council... Read more...

Tonkin Highway Grade Separated Interchanges (Hale Road and Welshpool Road)

Last updated: August 26, 2024

The Commissioner of Main Roads Western Australia (Main Roads) is proposing to widen Tonkin Highway from south of Roe Highway to approximately one kilometre north of Kelvin Road to a six-lane dual carriageway. The proposal includes construction of a half diamond interchange with north facing ramps at the Hale Road intersection in Forrestfield, and a grade-separated interchange at the intersection of Tonkin Highway and Welshpool Road in Wattle Grove. The proposal includes construction of a... Read more...

Lumsden Point General Cargo Facility

Last updated: August 12, 2024

The proposal is to develop and operate a general cargo facility within the Port Hedland inner harbour, within the Town of Port Hedland. This proposal has been superseded by the Lumsden Point General Cargo Facility Read more...

Nelson Point Dredging, RGP6 Port Development, Port Hedland

Last updated: August 12, 2024

The proposal involves the dredging of not more than 6 million cubic metres (Mm3) of material for two new berth pockets and extensions to the existing departure channel and swing basin at Nelson Point to accommodate vessels of approximately 250,000 dead weight tonnes (DWT); disposal of dredged material at both offshore in Commonwealth waters site and to a land based dredged material management area (DMMA). This proposal has been superseded by the Lumsden Point General Cargo Facility Read more...

Lumsden Point General Cargo Facility

Last updated: August 12, 2024

The proposal is to undertake dredging and construction to develop and operate a general cargo facility at Lumsden Point, located in Port Hedland. The proposal is a consolidation of the Nelson Point Dredging, RGP6 Port Development, Port Hedland and Lumsden Point General Cargo Facility approved proposals. Ministerial Statements 812 and 967 are now superseded. Read more...

Koombana Bay Marine Structures

Last updated: July 31, 2024

The South West Development Commission is proposing an upgrade to the marine structures that are intended to meet existing demand and future requirements for small craft maritime infrastructure and include new mooring facilities for commercial and recreational vessels, floating jetties, a boat servicing facility, improved public ablution facilities and up upgraded boat launching and storage facilities. Read more...

Casuarina Boat Harbour

Last updated: July 23, 2024

This document has been prepared for the first future derived proposal of the Koombana Bay Marine Structures Strategic Proposal (Assessment Number 2049 and Ministerial Statement 1226), namely the Casuarina Boat Harbour (Figure 1 Proposal Content Document). This document supports the Department of Transport’s (DoT’s) request to the Environmental Protection Authority (EPA) under section 38E of the Environmental Protection Act 1986 (EP Act) that the referred Casuarina Boat Harbour (CBH) future... Read more...

Northern Terminal to Neerabup Terminal 330kV Transmission Line

Last updated: July 22, 2024

The Northern Terminal (NT) to Neerabup Terminal (NBT) 330kV Transmission Line proposal (the Proposal) is located approximately 13 km north of Perth in the City of Swan and City of Wanneroo. The Proposal is for the construction of a new 330kV dual circuit transmission line between NT in Malaga and NBT in Pinjar, a length of approximately 29 km. The purpose of the proposal is to reinforce the North Region transmission network to remove constraints on existing connected generation and provide... Read more...

Pages

  • 1
  • 2
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.