This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: April 26, 2024
FMG Iron Bridge (Aust) Pty Ltd proposes to extend existing operations at its North Star Magnetite Project , which is subject to Ministerial Statement 993 issued under Part IV of the, Environmental Protection Act 1986 ., The proposal is located approximately 110km southeast of Port Hedland in the Pilbara region of Western Australia. The proposed extension includes increasing the Mining Development Envelope by 1425.9 ha and total clearing by 606.9 ha to support new mine pits (180.7 ha); an... Read more...Last updated: April 22, 2024
Chalice Mining Limited proposes development of the Gonneville Nickel-Copper-Platinum Group Element (PGE) Project. The proposal is located within the Wheatbelt Region, approximately 70km north-east of Perth, 25 km west of Toodyay and 25 km south-east of Bindoon. The proposal comprises of a mine site including an open mine pit and/or underground mine and infrastructure corridor options for water and power supply. Road and/or existing rail infrastructure will be utilised in transporting supplies... Read more...Last updated: April 2, 2024
Main Roads is proposing to upgrade and widen Anketell Road to an Expressway Standard for approximately 7.5 km between Leath Road and Kwinana Freeway in the City of Kwinana, WA. The Proposal will include grade separated interchanges at six locations, grade separation of road over rail at two locations and other supporting road infrastructure . Read more...Last updated: April 2, 2024
The Proposal is to construct and operate a new multimodal port in the Kwinana Industrial Area (KIA), approximately 30 km south of Perth. The Proposal includes: A port facility. Adjacent areas of landside development. An offshore breakwater. Dredging for a second main channel. Dredging for access channels, turning basins and berthing areas. Use of dredge material for beneficial re-use and, where required, placement in approved marine placement areas. Removal of the disused Kwinana Bulk Berth 1 (... Read more...Last updated: March 25, 2024
The Northern Terminal (NT) to Neerabup Terminal (NBT) 330kV Transmission Line proposal (the Proposal) is located approximately 13 km north of Perth in the City of Swan and City of Wanneroo. The Proposal is for the construction of a new 330kV dual circuit transmission line between NT in Malaga and NBT in Pinjar, a length of approximately 29 km. The purpose of the proposal is to reinforce the North Region transmission network to remove constraints on existing connected generation and provide... Read more...Last updated: February 7, 2024
The Proposal is for the development of the Rhodes Ridge Iron Ore Project (the Proposal), located approximately 40 kilometres north-west of Newman, in the Shire of East Pilbara. The Proposal requires a disturbance footprint of up to 14,850 hectares within a 61,301 hectares Development Envelope. The Proposal includes the development of new above and below water table deposits, and associated activities. The proposal includes but is not limited to: development of new deposits including above and... Read more...Last updated: February 5, 2024
Province Resources Ltd propose to use combined onshore wind and solar energy to produce green hydrogen and ammonia for export to the green energy market. The proposal is distributed across 3 distinct locations within the Shire of Carnarvon, Western Australia. The proposal will comprise the following major elements: • up to 945 ha (6.8 GW) of wind turbines and up to 10,000 ha of solar arrays (5.2 GW) • a new multiuser port facility with a material offloading facility and export terminal •... Read more...Last updated: January 31, 2024
Aigle Royal propose to develop Lots 11 and 74 Beenyup Road, Banjup for residential development and conservation. The site adjoins Jandakot Regional Park. 10.25 hectares of the site is proposed for residential development and a wetland buffer. 23 hectares is proposed to be managed for conservation. Read more...Last updated: January 29, 2024
The Shire of Broome propose to develop a Class III landfill, leachate management system and asbestos monocell at the Regional Resource Recovery Park (RRRP). The RRRP is located at Lot 550 on the Broome-Cape Leveque Rd, 12km northeast of the Broome town centre. Read more...Last updated: January 19, 2024
The Proposal includes the expansion and amalgamation of existing operations at: Jimblebar Iron Ore Revised Proposal (Ministerial Statement (MS 1126), Orebody 18 Iron Ore Mine (MS 439, MS 1012), Orebody 31 Iron Ore Mine (MS 1021), to include new above and below water table mining, overburden storage areas, beneficiation plant, overland conveyor, creek diversions, haul and access roads, pipelines and associated infrastructure. All mines and associated elements are proposed to be consolidated into... Read more...Last updated: December 22, 2023
DevelopmentWA propose to develop undeveloped land in the Rockingham Industrial Zone, located approximately 40 kilometres south of Perth, in the City of Rockingham and City of Kwinana. The proposal is a derived proposal, authorised by the Rockingham Industrial Zone Strategic Environmental Assessment, Ministerial Statement 863 (EPA report number 1390). The proposal would consist of the development and subdivision of undeveloped land in the Rockingham Industrial Zone into 13 superlots, with roads... Read more...Last updated: December 22, 2023
Rio Tinto Winu Pty Limited (the Proponent) proposes to develop the Winu Project (the Proposal). The Proposal is a new copper-gold mine located approximately 300 km south of Broome and 320 km east of Port Hedland in the northern Pilbara region of Western Australia within both the Nyangumarta people’s and the Martu people’s Native Title Determination Areas. The Proposal conceptual footprint will require the clearing of up to 4,868 ha of native vegetation within a proposed 37,344 ha Development... Read more...Last updated: December 22, 2023
The revised proposal is to develop a pegmatite-hosted lithium deposit at the abandoned Mt Holland Mine Site, in a Development Envelope of 3,996 ha. The Proposal involves new clearing of up to 1,885 ha of native vegetation, and use of existing cleared/disturbed land, infrastructure including a mine pit, waste rock landforms, tailings storage facility, processing plant, airstrip, accommodation village, water storage facilities, power generation infrastructure and associated infrastructure., The... Read more...Last updated: December 22, 2023
The Mulga Downs Hub and Rail Spur (the Proposal) is located approximately 210 km south of Port Hedland and 180 km northwest of Newman in the Pilbara region of Western Australia. The Proposal is for the development of a hub and rail spur to connect into the existing Roy Hill Railway for the transport of iron ore to Port Hedland. The Proposal includes truck unloading and train loading facilities, product rehandling facilities, stockyards, a laboratory, a rail loop and rail service tracks, lateral... Read more...Last updated: December 18, 2023
The proposal is for Alcoa’s bauxite mining activities on the Darling Range in the southwest of Western Australia spanning the years 2022 to 2026. These activities occur within Alcoa’s Mineral Lease 1SA (ML1SA) and are documented in annual rolling five-year Mining and Management Programs (MMPs) required under a State Agreement Act framework. The 2022-26 MMP was approved, subject to exclusions, through the State Agreement Act framework in September 2022, and the proposal is currently being... Read more...Last updated: December 18, 2023
The proposal is for Alcoa’s bauxite mining activities on the Darling Range in the southwest of Western Australia spanning the years 2023 to 2027. These activities occur within Alcoa’s Mineral Lease 1SA (ML1SA) and are documented in annual rolling five-year Mining and Management Programs (MMPs) required under a State Agreement Act framework. A 2023-27 MMP has not yet been approved through the State Agreement Act framework but activities are still proposed to be undertaken during this time, and... Read more...Last updated: October 23, 2023
Port Hedland Green Steel Pty Ltd proposes to develop a large-scale downstream iron ore processing facility known as the Port Hedland Green Steel Project – Stage 1. The proposal is located in the Boodarie Strategic Industrial Area (BSIA) approximately 10 km south-west of Port Hedland in the Pilbara region. The proposal will consist of a pellet plant and a hot briquette iron (HBI) plant, consuming approximately 3 - 3.5 million tonnes per annum (Mtpa) of iron ore. Most of the pellets will be fed... Read more...Last updated: October 16, 2023
De Grey Mining Ltd proposes to construct and operate the Hemi Gold Project (the Project) located approximately 85 km south of Port Hedland, in the Pilbara Region of WA. The Project involves the excavation of open pits, mine dewatering, surplus water management including reinjection and controlled discharge. Associated supporting infrastructure includes an integrated waste landform tailings storage facility, waste rock landforms, low-grade stockpiles, airstrip, accommodation village, sealed... Read more...Last updated: September 8, 2023
BHP propose to expand existing mining operations at the Newman Hub in the Pilbara, approximately 2 kilometres (km) southwest of Newman. The Proposal is a derived proposal for mining operations at Newman (Western Ridge) authorised by the Pilbara Expansion Strategic Proposal, Ministerial Statement 1105. The proposal is to develop four iron ore deposits to expand BHP’s Newman Hub and includes: overburden storage areas ore and topsoil stockpiles haul and access roads overland conveyor 30 million... Read more...Last updated: September 8, 2023
The proposal is a derived proposal to expand existing mining operations at the Newman Hub in the Pilbara, previously authorised by Ministerial Statement (MS) 1105 Pilbara Expansion Strategic Proposal. This proponent proposes to expand the existing Orebody 32 above water table iron ore mine (currently authorised by MS 1037 Eastern Ridge Revised Proposal) in BHP’s Newman Hub to below the water table. The proposal is located 3.6 km northeast of Newman, and includes activities permitted to be... Read more...