This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: February 17, 2025
Gascoyne Gateway Ltd proposes to build, own and operate a multipurpose marine complex in Exmouth that will service a variety of vessels including but not limited to cruise liners and associated ecotourism activities, Defence and marine supply vessels. The project will not be utilised for livestock or iron ore. The Proposal site is located 10 kilometres south of the Exmouth township and immediately south of the Ingram Street light industrial area; opposite the Exmouth landfill site and to the... Read more...Last updated: February 4, 2025
The Proposal is to construct and operate a new multimodal port in the Kwinana Industrial Area (KIA), approximately 30 km south of Perth. The Proposal includes: A port facility. Adjacent areas of landside development. An offshore breakwater. Dredging for a second main channel. Dredging for access channels, turning basins and berthing areas. Use of dredge material for beneficial re-use and, where required, placement in approved marine placement areas. Removal of the disused Kwinana Bulk Berth 1 (... Read more...Last updated: February 3, 2025
The proposal is for the construction and operation of a recreational jetty at Beadon Point, Onslow, Western Australia. The Proposal will provide a pedestrian jetty alongside the ruins of the historic Onslow Jetty for tourism and fishing. The jetty will not be designed to accommodate vehicles or vessels and will be for pedestrians only. Some land clearing will be required to allow an access track and a boardwalk access path to the jetty. Read more...Last updated: January 24, 2025
The Proposal will use combined onshore wind and solar energy of approximately 5.2 gigawatt (GW) capacity to produce green hydrogen which will be converted to an estimated 2 Million tonnes per annum (Mtpa) of green ammonia for export to emerging green energy markets. The Proposal is located within the Shire of Northampton, Western Australia (WA), approximately 20 km north of Kalbarri. The Proposal comprises the following major components: a wind and solar farm with a combined installed capacity... Read more...Last updated: December 19, 2024
WA Offshore Windfarm Pty Ltd is proposing the construction, operation and decommissioning of the Western Australian Offshore Windfarm project. The project will be located approximately 5.5 km off the coast between Preston Beach and Myalup and will have a generation capacity of up to 300 MW. The Project will comprise up to 37 offshore wind turbine generators (WTGs) with supporting offshore and onshore electrical assets to transfer energy generated by the windfarm to the existing electricity... Read more...Last updated: December 18, 2024
Condition 3. Extension to Time Limit for Proposal Implementation Read more...Last updated: November 25, 2024
The Proposal is located in the Pilbara region of Western Australia within a development envelope of 20,821 ha and clearing no more than 1,564 ha. Onslow Infraco Pty Ltd (herein MRL a wholly owned subsidiary of Mineral Resources Limited) is proposing to develop: • A fully sealed private haul road, approximately 125km in length • Gas pipeline and ancillary haul road infrastructure. • Storage and bulk handling of ore at the Port of Ashburton. • Dredging a dedicated berthing pocket adjacent to the... Read more...Last updated: November 25, 2024
The construction of facilities for the development of the Pluto Gas Field on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on the Burrup Peninsula. Extensive dredging will be undertaken adjacent to the export facility. Read more...Last updated: August 12, 2024
The proposal is to develop and operate a general cargo facility within the Port Hedland inner harbour, within the Town of Port Hedland. This proposal has been superseded by the Lumsden Point General Cargo Facility Read more...Last updated: July 31, 2024
The South West Development Commission is proposing an upgrade to the marine structures that are intended to meet existing demand and future requirements for small craft maritime infrastructure and include new mooring facilities for commercial and recreational vessels, floating jetties, a boat servicing facility, improved public ablution facilities and up upgraded boat launching and storage facilities. Read more...Last updated: July 23, 2024
This document has been prepared for the first future derived proposal of the Koombana Bay Marine Structures Strategic Proposal (Assessment Number 2049 and Ministerial Statement 1226), namely the Casuarina Boat Harbour (Figure 1 Proposal Content Document). This document supports the Department of Transport’s (DoT’s) request to the Environmental Protection Authority (EPA) under section 38E of the Environmental Protection Act 1986 (EP Act) that the referred Casuarina Boat Harbour (CBH) future... Read more...Last updated: July 4, 2024
Time limit for substantial commencement, review of the adequacy of existing implementation conditions to ensure consistency with the EPA’s current objectives for each environmental factor. Read more...Last updated: May 9, 2024
The proposal is for the development of eco-friendly tourism accommodation including holiday units, a restaurant/function centre, and associated facilities, at Lot 660 La Perouse Court, Goode Beach. The proposed development envelope is 7.71 hectares (ha) and includes a 2.23 ha clearing footprint, a 0.402 ha wastewater reticulation zone, and a 5.02 ha conservation area. The proposal is located approximately 50m west of the Goode Beach foreshore and immediately east of Lake Vancouver, a... Read more...Last updated: April 24, 2024
The construction, operation and maintenance of a nominal 320 megawatt combined cycle base load power plant at Kwinana, as documented in schedule 1 of the ministerial statement. Read more...Last updated: April 22, 2024
The proposal is to operate the Beenyup Wastewater Ocean Outlets into Marmion Marine Park that are associated with the Beenyup Wastewater Treatment Plant and Advanced Water Recycling Plant. Read more...Last updated: April 11, 2024
NW Interconnected Power Pty Ltd is seeking to develop the Asian Renewable Energy Hub. The proposal is to construct and operate a large-scale wind and solar hybrid renewable energy project, approximately 220 km east of Port Hedland, WA. The renewable energy will be exported via a subsea power cable to Indonesia and Singapore. Onshore components comprise a series of linear arrays of wind turbines (up to 1,743 turbines) and solar panels distributed across a 644,600 ha development envelope, with a... Read more...Last updated: March 7, 2024
The proposal is to expand CSBP's Kwinana Ammonium Nitrate Production Facility (ANPF) by incorporating additional components into the existing facility and re-engineering (debottlenecking) some existing components in order to increase ammonium nitrate production capacity from 520,000 tpa to 936,000 tpa. Read more...Last updated: February 5, 2024
Province Resources Ltd propose to use combined onshore wind and solar energy to produce green hydrogen and ammonia for export to the green energy market. The proposal is distributed across 3 distinct locations within the Shire of Carnarvon, Western Australia. The proposal will comprise the following major elements: • up to 945 ha (6.8 GW) of wind turbines and up to 10,000 ha of solar arrays (5.2 GW) • a new multiuser port facility with a material offloading facility and export terminal •... Read more...Last updated: November 6, 2023
The proposal is for a desalination plant located approximately five kilometres (km) west of Cape Riche, and approximately 19 km from the nearest town of Wellstead. The desalination plant would be based on reverse osmosis technology. A seawater intake and pump station would be located 500 m east of Cheyne Inlet, and a brine outfall would be located on the south side of Cape Riche. Pipelines and infrastructure would be also constructed. Read more...Last updated: July 31, 2023
The proposal will provide additional port facilities at Port Hedland to receive and stockpile the product from emerging miners, specifically the various mines owned by the proponent’s shareholders, and load this product onto ships for export. Each of the shareholders is exploring and developing new iron ore projects in the Pilbara, with one company actively mining ore and exporting through the existing facilities in the Port of Port Hedland. The current shareholders of the proponent are Atlas... Read more...