Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Infrastructure (55) Apply Infrastructure filter
  • Industrial (43) Apply Industrial filter
  • Iron Ore (34) Apply Iron Ore filter
  • Power generation (18) Apply Power generation filter
  • Waste management (18) Apply Waste management filter
  • Land use (16) Apply Land use filter
  • Oil and gas (15) Apply Oil and gas filter
  • Mineral sands (11) Apply Mineral sands filter
  • Sand, rock, gravel and clay (9) Apply Sand, rock, gravel and clay filter
  • Gold (5) Apply Gold filter
  • Nickel (5) Apply Nickel filter
  • Rare earth elements (5) Apply Rare earth elements filter
  • Clearing (3) Apply Clearing filter
  • Copper (3) Apply Copper filter
  • Lead (3) Apply Lead filter
  • Uranium (3) Apply Uranium filter
  • Utilities (3) Apply Utilities filter
  • Coal (2) Apply Coal filter
  • Bauxite (1) Apply Bauxite filter
  • Potash (1) Apply Potash filter
  • Salt (1) Apply Salt filter

Filter by current status:

  • Ministerial Statement published (182) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (17) Apply Decision on whether to assess has been published filter
  • Assessment has been terminated under s40A of the EP Act (4) Apply Assessment has been terminated under s40A of the EP Act filter
  • Environmental Scoping Document approved (4) Apply Environmental Scoping Document approved filter
  • Proposal withdrawn (4) Apply Proposal withdrawn filter
  • EPA Report and Recommendations released - not appealable (3) Apply EPA Report and Recommendations released - not appealable filter
  • Minister determined that the proposal should not be implemented (3) Apply Minister determined that the proposal should not be implemented filter
  • Awaiting Ministerial decision (2) Apply Awaiting Ministerial decision filter
  • Public Environmental Review period closed (2) Apply Public Environmental Review period closed filter
  • Waiting for Minister to reject proposal under s45(8) (2) Apply Waiting for Minister to reject proposal under s45(8) filter
  • Ministerial Statement withdrawn under s.47A (1) Apply Ministerial Statement withdrawn under s.47A filter

Filter by relevant environmental factors:

  • (-) Remove 37 filter 37
  • Social Surroundings (134) Apply Social Surroundings filter
  • Flora and Vegetation (112) Apply Flora and Vegetation filter
  • Terrestrial Fauna (84) Apply Terrestrial Fauna filter
  • Hydrological Processes (71) Apply Hydrological Processes filter
  • Inland Waters Environmental Quality (67) Apply Inland Waters Environmental Quality filter
  • Terrestrial Environmental Quality (50) Apply Terrestrial Environmental Quality filter
  • Marine Environmental Quality (41) Apply Marine Environmental Quality filter
  • Human Health (26) Apply Human Health filter
  • Benthic Communities and Habitats (25) Apply Benthic Communities and Habitats filter
  • Subterranean Fauna (25) Apply Subterranean Fauna filter
  • People (24) Apply People filter
  • Inland Waters (22) Apply Inland Waters filter
  • Marine Fauna (20) Apply Marine Fauna filter
  • Coastal Processes (16) Apply Coastal Processes filter
  • 3144 (12) Apply 3144 filter
  • Landforms (10) Apply Landforms filter
  • Water (2) Apply Water filter

Filter by Proponent:

  • Chevron Australia Pty Ltd (5) Apply Chevron Australia Pty Ltd filter
  • Water Corporation (5) Apply Water Corporation filter
  • Australian Gold Reagents Pty Ltd (4) Apply Australian Gold Reagents Pty Ltd filter
  • BHP Billiton Iron Ore Pty Ltd (4) Apply BHP Billiton Iron Ore Pty Ltd filter
  • Fortescue Metals Group Limited (4) Apply Fortescue Metals Group Limited filter
  • New Energy Corporation Pty Ltd (4) Apply New Energy Corporation Pty Ltd filter
  • Worsley Alumina Pty Ltd (4) Apply Worsley Alumina Pty Ltd filter
  • CSBP Limited (3) Apply CSBP Limited filter
  • Eastern Metropolitan Regional Council (3) Apply Eastern Metropolitan Regional Council filter
  • Hamersley Iron Pty Limited (3) Apply Hamersley Iron Pty Limited filter
  • Keysbrook Leucoxene Pty Ltd (3) Apply Keysbrook Leucoxene Pty Ltd filter
  • Kingstream Resources NL (3) Apply Kingstream Resources NL filter
  • Minister for State Development (3) Apply Minister for State Development filter
  • Roy Hill Infrastructure Pty Ltd (3) Apply Roy Hill Infrastructure Pty Ltd filter
  • Simcoa Operations Pty Ltd (3) Apply Simcoa Operations Pty Ltd filter
  • Tiwest Joint Venture (3) Apply Tiwest Joint Venture filter
  • Alcoa of Australia Ltd (2) Apply Alcoa of Australia Ltd filter
  • Alcoa World Alumina Australia (2) Apply Alcoa World Alumina Australia filter
  • Apache Energy Ltd (2) Apply Apache Energy Ltd filter
  • BHP Iron Ore Pty Ltd (2) Apply BHP Iron Ore Pty Ltd filter
  • Cable Sands (WA) Pty Ltd (2) Apply Cable Sands (WA) Pty Ltd filter
  • Cleanaway Solid Waste Pty Ltd (2) Apply Cleanaway Solid Waste Pty Ltd filter
  • Fortescue Metals Group Ltd (2) Apply Fortescue Metals Group Ltd filter
  • Griffin Power Pty Ltd (2) Apply Griffin Power Pty Ltd filter
  • Hamersley Iron Pty Ltd (2) Apply Hamersley Iron Pty Ltd filter
  • Hanson Construction Materials Pty Ltd (2) Apply Hanson Construction Materials Pty Ltd filter
  • Iluka Resources Limited (2) Apply Iluka Resources Limited filter
  • Kwinana WTE Project Co Pty Ltd (2) Apply Kwinana WTE Project Co Pty Ltd filter
  • LandCorp and Octennial Holdings Pty Ltd (2) Apply LandCorp and Octennial Holdings Pty Ltd filter
  • Main Roads Western Australia (2) Apply Main Roads Western Australia filter
  • Marubeni Corporation and Water Corporation of Western Australia (2) Apply Marubeni Corporation and Water Corporation of Western Australia filter
  • Murrin Murrin Operations Pty Ltd (2) Apply Murrin Murrin Operations Pty Ltd filter
  • Polaris Metals Pty Ltd (2) Apply Polaris Metals Pty Ltd filter
  • Robe River Mining Co. Pty. Ltd (2) Apply Robe River Mining Co. Pty. Ltd filter
  • Rosslyn Hill Mining Pty Ltd (2) Apply Rosslyn Hill Mining Pty Ltd filter
  • Tronox Management Pty Ltd (2) Apply Tronox Management Pty Ltd filter
  • Water Corporation of Western Australia (2) Apply Water Corporation of Western Australia filter
  • Wesfarmers Sugar Company Pty Ltd (2) Apply Wesfarmers Sugar Company Pty Ltd filter
  • Western Australia Biomass Pty Ltd (2) Apply Western Australia Biomass Pty Ltd filter
  • API Management Pty Limited (1) Apply API Management Pty Limited filter
  • Bluewaters Power 3 Pty Ltd (1) Apply Bluewaters Power 3 Pty Ltd filter
  • Conservation Commission of Western Australia (1) Apply Conservation Commission of Western Australia filter
  • Grange Resources Limited (1) Apply Grange Resources Limited filter
  • Hope Downs Management Services Pty Ltd (1) Apply Hope Downs Management Services Pty Ltd filter
  • Image Resources NL (1) Apply Image Resources NL filter
  • Karara Mining Limited (1) Apply Karara Mining Limited filter
  • Lanco Resources Australia Pty Ltd (1) Apply Lanco Resources Australia Pty Ltd filter
  • LandCorp (1) Apply LandCorp filter
  • Phoenix Energy Australia Pty Ltd (1) Apply Phoenix Energy Australia Pty Ltd filter
  • Vimy Resources Limited (1) Apply Vimy Resources Limited filter

Filter by region:

  • Perth (70) Apply Perth filter
  • Pilbara (61) Apply Pilbara filter
  • South West (30) Apply South West filter
  • Mid West (19) Apply Mid West filter
  • Goldfields Esperance (11) Apply Goldfields Esperance filter
  • Wheatbelt (11) Apply Wheatbelt filter
  • Peel (10) Apply Peel filter
  • Kimberley (7) Apply Kimberley filter
  • Great Southern (5) Apply Great Southern filter
  • Gascoyne (3) Apply Gascoyne filter
  1. Home
  2. Proposal search
  3. 37

Pilbara Energy Generation Power Station

Last updated: November 25, 2024

PEG proposes to construct and operate 14 new gas-fired reciprocating engines with a combined maximum installed capacity of 165 MW. It is expected the average annual throughput of the facility will be approximately 150 MW. The 165 MW power station is expected to result in 609,696 tCO2-e. The proposed PEG power station is located next to the existing Solomon power station and replaces the need for 221 MW power at Iron Bridge, which would have resulted in 1,196,423 tCO2-e. FMG have submitted a... Read more...

Covalent Lithium Hydroxide Refinery

Last updated: November 25, 2024

The proposal is for the construction and operation of a Lithium Hydroxide Refinery at Lot 15 Mason Road, Kwinana within the Kwinana Industrial Area, approximately 31 km south of the Perth Central Business District. The Proposal will process spodumene ore concentrate, to produce battery grade Lithium Hydroxide Monohydrate, primarily for use in Lithium ion batteries for electric vehicles. The proposal would require a total of 11.2 hectares of native vegetation clearing within a 76 hectare... Read more...

Albemarle Kemerton Plant

Last updated: November 25, 2024

Albemarle Lithium Pty Ltd (Albemarle) is proposing to stablish the Albemarle Kemerton Plant, a Lithium hydroxide Product manufacturing plant and associated infrastructure, within the Kemerton Strategic Industrial Area (KSIA), approximately 17 kilometres north-east of Bunbury. The Albemarle Kemerton Plant will produce up to 100,000 tonne per annum (tpa) of lithium hydroxide monohydrate (Lithium Hydroxide Product) from five 20,000 tpa process trains and produce up to 1,100,000 tpa of tailings.... Read more...

Wingellina Nickel Project

Last updated: November 25, 2024

Hinckley Range Pty Ltd proposes to mine nickeliferous limonite ore from the Wingellina deposit located approximately 1,400 km north-east of Perth in the Shire of Ngaanyatjarraku close to the Northern Territory and South Australia borders Read more...

Gorgon Gas Development Revised and Expanded Proposal: Barrow Island Nature Reserve

Last updated: November 25, 2024

The construction of facilities for the development of the Greater Gorgon Gas Fields on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on Barrow Island. Read more...

Pluto LNG Development (Site B Option), Burrup Peninsula

Last updated: November 25, 2024

The construction of facilities for the development of the Pluto Gas Field on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on the Burrup Peninsula. Extensive dredging will be undertaken adjacent to the export facility. Read more...

Gonneville Nickel-Copper-Platinum Group Element (PGE) Project

Last updated: November 12, 2024

Chalice Mining Limited proposes development of the Gonneville Nickel-Copper-Platinum Group Element (PGE) Project. The proposal is located within the Wheatbelt Region, approximately 70km north-east of Perth, 25 km west of Toodyay and 25 km south-east of Bindoon. The proposal comprises of a mine site including an open mine pit and/or underground mine and infrastructure corridor options for water and power supply. Road and/or existing rail infrastructure will be utilised in transporting supplies... Read more...

Valhalla Gas Exploration and Appraisal Program

Last updated: October 7, 2024

Bennett Resources is proposing to undertake an unconventional exploration drilling and hydraulic fracture stimulation program within Petroleum Exploration Permit EP 371 (EP 371) within the Shire of Derby, West Kimberley. The proposal area is located approximately 123 kilometres south east of the town of Derby. The proposal comprises the construction of up to twenty wells in a region of the Canning Basin that has been previously surveyed and explored for petroleum purposes. The proposal is... Read more...

Utah Point Berth Project (Stage B)

Last updated: September 27, 2024

The Utah Point Berth Project consists of two separate stages: Stage A: Dredging and Reclamation; and Stage B: Construction and Operation. Stage A, dredging and reclamation works for the UPBP was approved by the Minister for Environment as an amendment to the existing Fortescue Metals Group (FMG) approval and managed according to the approved conditions. The works for Stage A have been successfully completed. The EPA determined that Stage B, the construction and ongoing operation of stockyard... Read more...

Sodium Cyanide Plants (Liquid and Solid) at Kwinana and Transport of Sodium Cyanide by Road and Rail from Kwinana

Last updated: August 27, 2024

Australian Gold Reagents Pty Ltd propose to increase production at the existing Kwinana sodium cyanide liquid plant from 91,000 tonnes per annum (tpa) to a total of 110,000 tpa; and to increase production of solid sodium cyanide from 45,000 tpa up to 60,000 tpa. The proposal also includes connecting the two existing thermal combustion units to allow waste gas from either plant during down time to be directed through a combined header to the operational thermal combustion unit for effective... Read more...

Wagerup Cogeneration Project

Last updated: June 27, 2024

Read more...

Kwinana Gas-Fired Power Station (Water Cooled Condenser)

Last updated: April 24, 2024

The construction, operation and maintenance of a nominal 320 megawatt combined cycle base load power plant at Kwinana, as documented in schedule 1 of the ministerial statement. Read more...

Murrin Murrin Nickel-Cobalt Project Stage 2 Expansion

Last updated: April 24, 2024

The proposal is for the Stage 2 expansion of the Murrin Murrin Nickel-Cobalt mining and processing operation (Stage 1), 60 kilometres east of Leonora. The Stage 2 expansion includes the mining of additional ore; an expansion of the processing plant to process additional ore; and the development of additional infrastructure associated with mining and processing of the ore. Read more...

Kemerton Strategic Industrial Area (KSIA)

Last updated: April 2, 2024

DevelopmentWA is seeking to develop the Kemerton Strategic Industrial Area (KSIA) for the purpose of industrial and infrastructure development as a strategic proposal. The KSIA is located within the Shire of Harvey, 17 kilometres north of Bunbury. The KSIA key characteristics are: Development of the Kemerton Strategic industry Zone (Industry Core) which is approximately 2,024 hectares (ha). There is an approximate 50-year time period for development. Ultimate land use proposed is to be heavy... Read more...

Caravel Copper Project

Last updated: March 14, 2024

Caravel Minerals Limited is seeking to develop the Caravel Copper Project, located in the Western Australian (WA) Wheatbelt approximately 150 km north of Perth. The Proposal will produce copper concentrate, which will be transported to port by road. The Proposal includes mine pits, waste rock landforms, tailings storage, ore processing and transfer infrastructure and associated infrastructure such as workshops, laydown areas, landfill, communications, offices, ablutions, wastewater treatment,... Read more...

Ammonium Nitrate Production Expansion Project: Phase 2, Kwinana

Last updated: March 7, 2024

The proposal is to expand CSBP's Kwinana Ammonium Nitrate Production Facility (ANPF) by incorporating additional components into the existing facility and re-engineering (debottlenecking) some existing components in order to increase ammonium nitrate production capacity from 520,000 tpa to 936,000 tpa. Read more...

Multi-User Iron Ore Export (Landside) Facility Port Hedland (S46) [2349]

Last updated: February 19, 2024

The requested change relates to condition 3 of Ministerial Statement 1056 (as relevant to Ministerial Statement 891) for an extension to the Time Limit for Proposal Implementation for the proposal approved under MS 891. With the agreement of the proponent, the Environmental Protection Authority will take no further action in relation to the s.46 inquiry into the proposed changes to condition 3 of Ministerial Statement 1056 (as relevant to Ministerial Statement 891) Read more...

Quarry at Lot 150 Clydesdale Road, Grass Valley (1)

Last updated: February 15, 2024

Resource Group (WA) Pty Ltd proposes to construct a hard rock quarry at Lot 150 (792) Clydesdale Road, Grass valley. Holcim (Aust) Pty Ltd will be the eventual operators of the quarry. The proposal will extract, crush and screen approximately seventy thousand tonne (70,000tn) of hard rock per year with an approximate life of the quarry being 20-30 years. The proposal would require the clearing of 8.41 hectares (ha) of native vegetation and have a developmental envelope of 15.2 ha. Read more...

Cloudbreak Life of Mine Expansion

Last updated: February 9, 2024

The proposal includes the existing Cloudbreak iron ore mine and proposed expansion. The existing mine includes open pit strip mining, backfilling of pits, progressive rehabilitation and ore processing. The expansion includes increasing ore production, development of new pits and permanent waste landforms, the development of new infrastructure, additional dewatering and water disposal activities, an upgrade of the ore processing facility. Read more...

BHP Billiton Iron Ore - Pilbara Strategic Proposal

Last updated: February 5, 2024

BHP Billiton Iron Ore has prepared a Strategic Proposal of its future operations in the Pilbara for the next 50 to 100 years. The Strategic Proposal will facilitate a more holistic and longer term view of mining activities in the Pilbara region by identifying and assessing how impacts to the environment at a landscape scale will be managed. Read more...

Pages

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • …
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.