Last updated: July 4, 2023
In 1998 Main Roads Western Australia (Main Roads) referred Stages 2, 3 and 4 of the Karratha – Tom Price Road, now called the Manuwarra Red Dog Highway (the Original Proposal), to the Environmental Protection Authority (EPA). The EPA assessed the Original Proposal and published EPA Report 1159. Ministerial Statement (MS) 677 was published in 2005. Construction of Stage 2 was completed in 2008. Stage 3 of the Original Proposal is currently under construction and is expected to be completed in... Read more...Last updated: June 21, 2023
Leichhardt Industrials Pty Ltd propose to develop the Eramurra Solar Salt project approximately 55 km west-south-west of Karratha in the Pilbara region of Western Australia. The proposal includes the development of a series of concentrator and crystalliser ponds and a processing plant. Supporting infrastructure includes seawater intake, bitterns outfall, desalination plant and groundwater bores, power supply and other infrastructure. Export of product would be via a previously approved trestle... Read more...Last updated: June 19, 2023
Woodside Energy Technologies Pty Ltd propose to construct and operate H2Perth, a domestic and export scale hydrogen and ammonia production facility, located approximately 40 km south of Perth. The proposal is to be located primarily within the Rockingham Industrial Zone (RIZ) in the City of Rockingham, with elements also located within the City of Kwinana and on the multi-user Kwinana Bulk Jetty. The proposal would produce approximately 3250 megawatts of gaseous hydrogen and approximately 3.25... Read more...Last updated: June 14, 2023
Remove Condition 2 (Proponent Commitments) if the proponent commitments in schedule 2 have been completed, are no longer relevant to the proposal or can be managed under Part V of the Environmental Protection Act 1986 (EP Act)., The EPA, in response to a request by the Water Corporation and pursuant to s40A of the EP Act, has terminated the inquiry under s46 of the EP Act into changing the implementation conditions of Ministerial Statement 568 Read more...Last updated: May 22, 2023
The proposal involves the construction and use of a landfill and associated infrastructure for receiving Class II and III waste of 150,000 to 250,000 tonnes per annum (tpa) over a period of 20 years. The proposal is located at Allawuna Farm, St Ronans, within the Shire of York. Read more...Last updated: May 10, 2023
The Commissioner of Main Roads Western Australia is proposing to construct and operate the northern section and upgrade the central section of the Bunbury Outer Ring Road (BORR). The proposal includes 19km of freeway-standard dual carriageway and associated interchanges between Forrest Highway and Boyanup-Picton Road (northern section) and between Boyanup-Picton Road and South West Highway (central section). The proposal would require the clearing of up to 73 hectares of native vegetation and... Read more...Last updated: February 28, 2023
Changes to condition 13-1 and 13-3 of Ministerial Statement 1114 (as amended) following a change to proposal after assessment. Read more...Last updated: February 20, 2023
Project Haber Pty Ltd proposes to construct and operate a 1.4 million tonnes per annum (Mtpa) urea plant in East Arrowsmith (South Erregulla). The proposal is located approximately 280 km north of Perth and 45 km south east of Dongara, in the Shire of Three Springs. The urea plant comprises of an Air Separation Unit (ASU) producing nitrogen, oxygen and hydrogen for various processes; an ammonia synthesis unit; and a granulation and urea production unit. Supporting infrastructure includes gas... Read more...Last updated: February 15, 2023
Main Roads Western Australia is proposing to construct and operate the southern section of the Bunbury Outer Ring Road (BORR). The proposal includes 10.5 km of freeway-standard dual carriageway, 3 km of rural distributor roads and other associated road-infrastructure. The BORR southern section will connect to the proposed northern and central sections of BORR near South West Highway, which together will complete a bypass around Bunbury City from Forest Highway to Bussell Highway. The BORR... Read more...Last updated: November 23, 2022
Covalent Lithium Pty Ltd propose to make changes to their existing approved lithium mine. Changes include the construction and operation of a solar plant to provide renewable energy, changes to the tailings disposal method from a dry to a wet tailings, co-disposal of inert refinery waste generated from the Kwinana Lithium Refinery and modification of existing flora and vegetation and fauna exclusion areas. The revised proposal would include the additional disturbance of 56 hectares (ha). Read more...Last updated: October 31, 2022
The requested change relates to condition 3 of Statement 1055 for an extension to the time limit for proposal implementation. Read more...Last updated: July 15, 2022
The proposal is for above and below water table mining and beneficiation of vanadium ore to produce an enriched vanadium-iron concentrate. The proposal is located 40 km south-southeast of Meekatharra and includes the development of open mine pits and associated infrastructure including but not limited to access roads, accommodation camp, a crushing, milling, flotation, and magnetic separation (beneficiation) plant, waste rock and tailings storage, and support infrastructure. Read more...Last updated: May 30, 2022
The requested change relates to condition 3 of Statement 1035 (as relevant to Statement 861) for an extension to the Time Limit for Proposal Implementation. Read more...Last updated: May 25, 2022
Harvey Water propose to construct and operate a pipeline and ocean outfall to dispose brine wastewater. The pipeline will be located between the Kemerton Strategic Industrial Area and the Indian Ocean south of Binningup in the Shire of Harvey. The pipeline will convey brine to a single outlet diffuser outfall. The outfall will be located approximately 400 m from the shoreline and will be installed under the seabed by horizontal directional drilling from the coast. The outlet pipe will protrude... Read more...Last updated: April 13, 2022
Main Roads proposes to upgrade and widen a 2 km section of Tonkin Highway from four lanes to six lanes from approximately 1 km north of Kelvin Road extending south to Maddington Road. The Proposal will include construction of a grade separated interchange at Tonkin Highway and Kelvin Road and associated works such as PSP upgrade, installation of noise and retaining walls, drainage improvements and landscaping. Read more...Last updated: March 21, 2022
The Proposal is located in the Pilbara region of Western Australia. CITIC Pacific Mining Pty Ltd on behalf of Sino Iron Pty Ltd and Korean Steel Pty Ltd is proposing to increase the rate of groundwater abstraction from the mine pits and discharge to the lower Fortescue River and estuary from 12 to 21 GLpa, which is an increase of 9 GLpa. The proposal is located within an area of existing pastoral, mining, and recreational use. The maximum rate of discharge will remain the same (667L/sec). The... Read more...Last updated: March 14, 2022
The Public Transport Authority (PTA) proposes to construct and operate a new 13 kilometre (km) dual railway track between Malaga and Ellenbrook. The proposed Malaga to Ellenbrook extends from the proposed Bayswater to Malaga railway line. The proposal includes three new stations at Malaga, Whiteman Park and Ellenbrook with intermodal rail, bus, carpark and active mode (cycling and walking) facilities at each station. A potential future station is also proposed at Bennett Springs and rail... Read more...Last updated: February 1, 2022
Lynas Kalgoorlie Pty Ltd (Lynas) propose to construct and operate a new Rare Earths Processing Facility at Lot 500 Great Eastern Highway, Yilkari and a By-product storage facility on Common Reserve 8767, Yarri Road, Parkerston in the City of Kalgoorlie-Boulder. The Rare Earths Processing Facility will process rare earth concentrate from the Mt Weld mine to produce a rare earth carbonate for export. Read more...Last updated: September 14, 2021
Hastings Technology Metals Ltd propose to expand the existing approved Yangibana Rare Earths Project, a Rare Earth Elements mine which includes on site processing and associated infrastructure. The expansion involves mining from two additional pits (Yangibana and Auer) and one larger amalgamated pit (Bald Hill-Simon’s Find-Fraser’s). The proposal is located approximately 270 kilometres east-north-east of Carnarvon in the Shire of Upper Gascoyne. The proposal would include total disturbance of... Read more...Last updated: September 14, 2021
The Warrawoona Gold Project, located approximately 20km south of Marble Bar, will abstract ore from an open pit and underground mine at the Klondyke deposit as well as a cutback of the existing Copenhagen pit. Ore will be processes at around 2Mtpa at Klondyke. The project will produce gold bar and gold concentrate and is expected to operate for approximately six years. The proposal would include a total disturbance of 398 hectares. Read more...