ProjectProponent: Calidus Resources LtdProposal description: The Warrawoona Gold Project, located approximately 20km south of Marble Bar, will abstract ore from an open pit and underground mine at the Klondyke deposit as well as a cutback of the existing Copenhagen pit. Ore will be processes at around 2Mtpa at Klondyke. The project will produce gold bar and gold concentrate and is expected to operate for approximately six years. The proposal would include a total disturbance of 398 hectares. Assessment Number: 2229Region: PilbaraReferred under EP Act: s38Industry sector: GoldLast updated: August 20, 2020Current Status: Ministerial Statement published 1. ReferralComment on this referral: Warrawoona Gold ProjectComment period: Monday, 11 November, 2019 to Sunday, 17 November, 2019Referral documentation: Referral Cover Letter.pdf (PDF, 215.75 KB) Referral Form.pdf (PDF, 321.69 KB) Referral Supplementary Report.pdf (PDF, 13.9 MB) 2. Decision on whether to assess this proposalChairman's Determination: Assess - Referral InformationExtract of determination: Warrawoona Gold Project (PDF, 648.29 KB)Preliminary Environmental Factors: Flora and VegetationTerrestrial FaunaInland WatersDate published: Monday, 18 May, 2020 3. AssessmentEnvironmental ReviewPublic submissions: Tuesday, 12 May, 2020 to Tuesday, 26 May, 2020Make a submission: Warrawoona Gold Project - Additional informationEnvironmental Review documentation: 1-1. Desktop and L1 Fauna (Biologic).pdf (PDF, 4.54 MB) 1-2. Bat Monitoring (Biologic).pdf (PDF, 8.68 MB) 1-3. VHF Bat Foraging (Biologic).pdf (PDF, 7.94 MB) 1-4. Targeted Vertebrate (Biologic).pdf (PDF, 11.56 MB) 2-1. SRE Invert Fauna (Biologic).pdf (PDF, 4.88 MB) 2-2. Subterranean Fauna (Biologic).pdf (PDF, 8.44 MB) 3-1. Bat Impact Assessment (Biologic).pdf (PDF, 8.87 MB) 3-2. Con Sig Fauna Impact Assessment (Biologic).pdf (PDF, 12.3 MB) 3-3. Blasting Assessment (Blast It Global).pdf (PDF, 2.76 MB) 3-4. Tech Review of blasting assessment (POA).pdf (PDF, 151.96 KB) 3-5. Noise Assessment (Lloyd George).pdf (PDF, 2.89 MB) 3-6. Dust Assessment (AQA).pdf (PDF, 970.19 KB) 4-1. Surface Hydrology Assessment (GRM).pdf (PDF, 32.07 MB) 4-2. Hydrogeological Assessment (GRM).pdf (PDF, 20.42 MB) 5-1. Waste Characterisation (GCA).pdf (PDF, 7.07 MB) 5-2. Tailings Characterisation (GCA).pdf (PDF, 2.02 MB) 5-3. TFS Plan (ATC Williams).pdf (PDF, 56.85 MB) 6-1. Soil and Landforms Assessment (Mine Earth).pdf (PDF, 7.11 MB) 7-1. Veg and Flora Survey (Woodman).pdf (PDF, 26.74 MB) 7-2. Veg and Flora Memo (Woodman).pdf (PDF, 5.04 MB) 9-1 Significant Species Management Plan_Rev1_ CRL-ENV-PLN-006-19.pdf (PDF, 10.32 MB) 9-2. CRL-ENV-PRO-017-19_Rev 0 Environmental blast management procedure.pdf (PDF, 405.83 KB) 9-3. CRL-ENV-PRO-020-19_Rev 0_Surface_Water .pdf (PDF, 216.36 KB) 9-4. CRL-ENV-PRO-021-19_Rev 0_Ground_Water .pdf (PDF, 735.28 KB) 9-5. CRL-ENV-PRO-019-19_Rev 0 TSF and Cyanide Monitoring Procedures.pdf (PDF, 165.65 KB) 9-6. CRL-ENV-PRO-022-19_Rev 0 Metaliferous Drainage Procedure.pdf (PDF, 254.45 KB) 9-7. CRL-ENV-PRO-023-19_Rev 0_WRD_TSF Closure.pdf (PDF, 476.64 KB) Calidus Referral Report Rev01.pdf (PDF, 13.9 MB) Calidus Referral Report Rev01.pdf (PDF, 13.9 MB)Date Published (Environmental Review documentation): May 12, 2020 4. EPA Report on assessmentEPA Report Number: 1681EPA Report: EPA Report 1681 - Warrawoona Gold Project - Assessment report.pdf (PDF, 2.51 MB)Key Environmental Factors: Flora and VegetationSubterranean FaunaTerrestrial FaunaInland WatersDate published: Wednesday, 24 June, 2020Appeals close: Wednesday, 8 July, 2020 5. Decision on proposal and implementation of proposalMinisterial StatementDate of approval: Thursday, 20 August, 2020Ministerial Statement: Ministerial Statement 1150 (PDF, 510.17 KB)