Last updated: May 8, 2025
Main Roads is proposing to upgrade and widen Anketell Road to an Expressway Standard for approximately 7.5 km between Leath Road and Kwinana Freeway in the City of Kwinana, WA. The Proposal will include grade separated interchanges at six locations, grade separation of road over rail at two locations and other supporting road infrastructure . Read more...Last updated: May 5, 2025
Chichester Metals Pty Ltd, a subsidiary of Fortescue Metals Group, proposes to develop and operate an iron ore mine approximately 80 kilometres north-west of Newman. The Nyidinghu Iron Ore Mine proposal includes mine pits above and below the water table, an on-site ore processing from various sources, waste rock and tailings storage, an aerodrome, groundwater abstraction, surplus water management including aquifer recharge and other supporting infrastructure. The proposal has a development... Read more...Last updated: March 27, 2025
The Pilbara Infrastructure Pty Ltd., a subsidiary of Fortescue Metals Group, proposes to construct and operate a railway of 106 kilometres (km) and associated infrastructure. The East Hamersley Railway Project includes communications and signalling infrastructure, an ore loading facility, groundwater abstraction and discharge, borrow pits and quarries, culverts, bridges, diversion drains, pump station, construction camp, landfills and wastewater treatment plants, and other supporting... Read more...Last updated: February 4, 2025
The Proposal is to construct and operate a new multimodal port in the Kwinana Industrial Area (KIA), approximately 30 km south of Perth. The Proposal includes: A port facility. Adjacent areas of landside development. An offshore breakwater. Dredging for a second main channel. Dredging for access channels, turning basins and berthing areas. Use of dredge material for beneficial re-use and, where required, placement in approved marine placement areas. Removal of the disused Kwinana Bulk Berth 1 (... Read more...Last updated: November 25, 2024
The Proposal is located in the Pilbara region of Western Australia within a development envelope of 20,821 ha and clearing no more than 1,564 ha. Onslow Infraco Pty Ltd (herein MRL a wholly owned subsidiary of Mineral Resources Limited) is proposing to develop: • A fully sealed private haul road, approximately 125km in length • Gas pipeline and ancillary haul road infrastructure. • Storage and bulk handling of ore at the Port of Ashburton. • Dredging a dedicated berthing pocket adjacent to the... Read more...Last updated: October 14, 2024
The City of Gosnells (the Proponent) proposes to extend Garden Street between Harpenden Street and Holmes Street in Southern River, which will involve the construction of an 840 m section of a dual carriageway (two lanes each direction). The Proposal is located predominantly within the suburb of Southern River, approximately 17 km south-east of Perth Central Business District (CBD) and intersects within Bush forever site 125 (Holmes Street Bushland). The construction and implementation of the... Read more...Last updated: August 26, 2024
The Commissioner of Main Roads Western Australia (Main Roads) is proposing to widen Tonkin Highway from south of Roe Highway to approximately one kilometre north of Kelvin Road to a six-lane dual carriageway. The proposal includes construction of a half diamond interchange with north facing ramps at the Hale Road intersection in Forrestfield, and a grade-separated interchange at the intersection of Tonkin Highway and Welshpool Road in Wattle Grove. The proposal includes construction of a... Read more...Last updated: July 22, 2024
The Northern Terminal (NT) to Neerabup Terminal (NBT) 330kV Transmission Line proposal (the Proposal) is located approximately 13 km north of Perth in the City of Swan and City of Wanneroo. The Proposal is for the construction of a new 330kV dual circuit transmission line between NT in Malaga and NBT in Pinjar, a length of approximately 29 km. The purpose of the proposal is to reinforce the North Region transmission network to remove constraints on existing connected generation and provide... Read more...Last updated: February 28, 2024
The, Southern Forest Irrigation Scheme, proposal involves taking water from the Donnelly River to irrigate land for horticultural and agricultural production in the southern forests region around Manjimup and Pemberton. The proposal is to construct and operate a water offtake (pump station) adjacent to the Donnelly River, a reservoir on Record Brook (a tributary of the Donnelly River), two header dams and a network of distribution water pipelines and associated infrastructure to supply water to... Read more...Last updated: December 22, 2023
The Mulga Downs Hub and Rail Spur (the Proposal) is located approximately 210 km south of Port Hedland and 180 km northwest of Newman in the Pilbara region of Western Australia. The Proposal is for the development of a hub and rail spur to connect into the existing Roy Hill Railway for the transport of iron ore to Port Hedland. The Proposal includes truck unloading and train loading facilities, product rehandling facilities, stockyards, a laboratory, a rail loop and rail service tracks, lateral... Read more...Last updated: December 15, 2023
Z1Z Resorts Pty Ltd proposes to redevelop the Ningaloo Lighthouse Holiday Park, located along Yardie Creek Road, North West Cape. The Proposal comprises the construction of new visitor accommodation; the construction of associated ancillary facilities (i.e., staff accommodation, power supply infrastructure, water supply and treatment, wastewater treatment and reuse, and replacement service station (vehicle refuelling) etc.); refurbishment of the Vlamingh Head Lighthouse Quarters (a part of... Read more...Last updated: December 15, 2023
The Public Transport Authority (PTA) proposes to construct and operate an extension of the existing Joondalup railway line from a point north of the proposed future Eglinton Station. The proposal will extend the Joondalup railway line through to Yanchep in the City of Wanneroo and includes a new intermodal transit station within the Yanchep City Centre area. The development envelope is up to 73 hectares (ha) and the proposal will result in potential impacts to native vegetation that includes... Read more...Last updated: June 14, 2023
Remove Condition 2 (Proponent Commitments) if the proponent commitments in schedule 2 have been completed, are no longer relevant to the proposal or can be managed under Part V of the Environmental Protection Act 1986 (EP Act)., The EPA, in response to a request by the Water Corporation and pursuant to s40A of the EP Act, has terminated the inquiry under s46 of the EP Act into changing the implementation conditions of Ministerial Statement 568 Read more...Last updated: February 28, 2023
Changes to condition 13-1 and 13-3 of Ministerial Statement 1114 (as amended) following a change to proposal after assessment. Read more...Last updated: February 15, 2023
Main Roads Western Australia is proposing to construct and operate the southern section of the Bunbury Outer Ring Road (BORR). The proposal includes 10.5 km of freeway-standard dual carriageway, 3 km of rural distributor roads and other associated road-infrastructure. The BORR southern section will connect to the proposed northern and central sections of BORR near South West Highway, which together will complete a bypass around Bunbury City from Forest Highway to Bussell Highway. The BORR... Read more...Last updated: April 13, 2022
Main Roads proposes to upgrade and widen a 2 km section of Tonkin Highway from four lanes to six lanes from approximately 1 km north of Kelvin Road extending south to Maddington Road. The Proposal will include construction of a grade separated interchange at Tonkin Highway and Kelvin Road and associated works such as PSP upgrade, installation of noise and retaining walls, drainage improvements and landscaping. Read more...Last updated: February 28, 2022
Change to conditions 1-1 (Implementation) and 2-1 (Proponent Commitments) Read more...Last updated: January 22, 2021
Changes to condition 13 Offsets following a change to proposal after assessment. Read more...Last updated: July 23, 2020
Changes to Condition 3 in order to extend the Time Limit of Authorisation for commencement of the proposal. Read more...Last updated: June 29, 2020
Subsea 7 proposes to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35km south of the Exmouth Townsite. A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields. The onshore pipeline fabrication site and associated infrastructure includes two Bundle tracks (approximately 10 km in length) along which the Bundles will be constructed... Read more...