Last updated: May 12, 2025
Woodside Energy Ltd has provided a combined document that relates to both its Commonwealth referral (Environment Protection and Biodiversity Act 1999) and State referral (Environmental Protection Act 1986). The component within State Waters includes drilling and completion, installation, commissioning, operation, well repair and workover and decommissioning of subsea wells and associated infrastructure located in Western Australian State waters, to extract hydrocarbons from the Torosa reservoir... Read more...Last updated: May 2, 2025
The Proposal is to extend and redevelop the existing Army Groyne into a barge operations facility in South Thomson Bay at Wadjemup / Rottnest Island. The Proposal includes: Dredging for the purpose of construction for a breakwater/laydown area and for a barge turning circle. Use of dredge spoil for re-use as reclamation to create a laydown area. Extension of the existing Army Groyne to create a breakwater. Barge landing ramp. Ferry berth. Small craft landing facility. Fuel storage and... Read more...Last updated: April 9, 2025
Tassal propose to expand its barramundi farm operations to 7 sites spread across the Buccaneer Archipelago, in the Kimberley region. The proposed expansion will be staged over a 10-year period. Read more...Last updated: March 13, 2025
The Western Australian Water Corporation is proposing to construct the Alkimos Seawater Desalination Plant (ASDP) as part of Perth’s Integrated Water Supply Scheme which aims to provide additional sources of drinking water to supplement the existing metropolitan water supply. The ASDP Proposal will be located within the Alkimos Water Precinct (Lot 1050 Marmion Avenue), approximately 40 km north of the Perth, within the northwest corridor, north of Quinns Rock beach and south of Yanchep beach.... Read more...Last updated: February 17, 2025
Gascoyne Gateway Ltd proposes to build, own and operate a multipurpose marine complex in Exmouth that will service a variety of vessels including but not limited to cruise liners and associated ecotourism activities, Defence and marine supply vessels. The project will not be utilised for livestock or iron ore. The Proposal site is located 10 kilometres south of the Exmouth township and immediately south of the Ingram Street light industrial area; opposite the Exmouth landfill site and to the... Read more...Last updated: February 4, 2025
The Proposal is to construct and operate a new multimodal port in the Kwinana Industrial Area (KIA), approximately 30 km south of Perth. The Proposal includes: A port facility. Adjacent areas of landside development. An offshore breakwater. Dredging for a second main channel. Dredging for access channels, turning basins and berthing areas. Use of dredge material for beneficial re-use and, where required, placement in approved marine placement areas. Removal of the disused Kwinana Bulk Berth 1 (... Read more...Last updated: February 3, 2025
The proposal is for the construction and operation of a recreational jetty at Beadon Point, Onslow, Western Australia. The Proposal will provide a pedestrian jetty alongside the ruins of the historic Onslow Jetty for tourism and fishing. The jetty will not be designed to accommodate vehicles or vessels and will be for pedestrians only. Some land clearing will be required to allow an access track and a boardwalk access path to the jetty. Read more...Last updated: January 24, 2025
The Ridley Magnetite Project (the Proposal) is located approximately 57 km east of Port Hedland. The Proposal is located within a 19,102 ha Development Envelope (DE) with an indicative disturbance footprint (IF) of 8,484 ha. The Proposal is for the mining and processing of iron ore to produce up to 16.5 million tonnes per annum (Mtpa) of magnetite concentrate. The Proposal includes a single pit (below water table), run-of-mine pad, concentrate stockpiles, laydown areas, waste dumps,... Read more...Last updated: December 19, 2024
WA Offshore Windfarm Pty Ltd is proposing the construction, operation and decommissioning of the Western Australian Offshore Windfarm project. The project will be located approximately 5.5 km off the coast between Preston Beach and Myalup and will have a generation capacity of up to 300 MW. The Project will comprise up to 37 offshore wind turbine generators (WTGs) with supporting offshore and onshore electrical assets to transfer energy generated by the windfarm to the existing electricity... Read more...Last updated: November 25, 2024
The Western Green Energy Hub is a proposal to design, construct and operate a large-scale wind and solar power project to produce value added products, with the base case assuming green ammonia production. The proposal is situated on WA Mirning Native Title determined land in the far southeast of Western Australia in the Shire of Dundas and City of Kalgoorlie-Boulder, to the northwest of Eucla in the South Coast Region. The proposal will be located on Unallocated Crown Land and pastoral leases... Read more...Last updated: November 25, 2024
The Proposal is located in the Pilbara region of Western Australia within a development envelope of 20,821 ha and clearing no more than 1,564 ha. Onslow Infraco Pty Ltd (herein MRL a wholly owned subsidiary of Mineral Resources Limited) is proposing to develop: • A fully sealed private haul road, approximately 125km in length • Gas pipeline and ancillary haul road infrastructure. • Storage and bulk handling of ore at the Port of Ashburton. • Dredging a dedicated berthing pocket adjacent to the... Read more...Last updated: October 14, 2024
The Mid West Ports Authority is proposing marine infrastructure upgrades at the Port of Geraldton. The Proposal has a disturbance footprint of up to 38 hectares (ha), of which 17 ha is a new footprint and 21 ha the existing port, within a 75 ha development envelope. The Proposal is a significant amendment to the Geraldton Port Enhancement Project and Preparatory Works for the Town Beach Foreshore Redevelopment (Original Proposal) (Ministerial statement 600), and consists of: dredging and land... Read more...Last updated: August 12, 2024
The proposal is to develop and operate a general cargo facility within the Port Hedland inner harbour, within the Town of Port Hedland. This proposal has been superseded by the Lumsden Point General Cargo Facility Read more...Last updated: July 31, 2024
The South West Development Commission is proposing an upgrade to the marine structures that are intended to meet existing demand and future requirements for small craft maritime infrastructure and include new mooring facilities for commercial and recreational vessels, floating jetties, a boat servicing facility, improved public ablution facilities and up upgraded boat launching and storage facilities. Read more...Last updated: July 23, 2024
This document has been prepared for the first future derived proposal of the Koombana Bay Marine Structures Strategic Proposal (Assessment Number 2049 and Ministerial Statement 1226), namely the Casuarina Boat Harbour (Figure 1 Proposal Content Document). This document supports the Department of Transport’s (DoT’s) request to the Environmental Protection Authority (EPA) under section 38E of the Environmental Protection Act 1986 (EP Act) that the referred Casuarina Boat Harbour (CBH) future... Read more...Last updated: July 4, 2024
Time limit for substantial commencement, review of the adequacy of existing implementation conditions to ensure consistency with the EPA’s current objectives for each environmental factor. Read more...Last updated: April 22, 2024
The proposal is to operate the Beenyup Wastewater Ocean Outlets into Marmion Marine Park that are associated with the Beenyup Wastewater Treatment Plant and Advanced Water Recycling Plant. Read more...Last updated: April 16, 2024
Inquire into implementation Condition 9 (Quarantine Expert Panel) and Condition 15 (Marine Turtle Expert Panel) to ensure that they are effective and act as an independent advisory group for the Minister for Environment and the proponent on matters relating to terrestrial and marine quarantine and marine turtle monitoring and management. It is noted that a second Section 46 inquiry into Ministerial 800 (dated 11-04-2023) has also been requested by the Minister for Environment in relation to... Read more...Last updated: April 11, 2024
NW Interconnected Power Pty Ltd is seeking to develop the Asian Renewable Energy Hub. The proposal is to construct and operate a large-scale wind and solar hybrid renewable energy project, approximately 220 km east of Port Hedland, WA. The renewable energy will be exported via a subsea power cable to Indonesia and Singapore. Onshore components comprise a series of linear arrays of wind turbines (up to 1,743 turbines) and solar panels distributed across a 644,600 ha development envelope, with a... Read more...Last updated: February 5, 2024
Province Resources Ltd propose to use combined onshore wind and solar energy to produce green hydrogen and ammonia for export to the green energy market. The proposal is distributed across 3 distinct locations within the Shire of Carnarvon, Western Australia. The proposal will comprise the following major elements: • up to 945 ha (6.8 GW) of wind turbines and up to 10,000 ha of solar arrays (5.2 GW) • a new multiuser port facility with a material offloading facility and export terminal •... Read more...