This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 24, 2011
The proposal is for the construction and operation of a mineral sands mine at Gwindinup, approximately 25 kilometres south-south-east of Bunbury and between two and ten kilometres south of the town of Boyanup. Read more...Last updated: November 22, 2011
The proposal involves the construction and operation of an open pit magnetite mine located approximately 90 kilometres east-north-east of Albany, and pipelines for ore slurry transport and return water, connecting the mine site and new port loading facilities in the Port of Albany. Read more...Last updated: November 16, 2011
Inquiry under s46 of the EP Act to replace condition 4-4 of Ministerial Statement 399 . Read more...Last updated: November 1, 2011
Proposal under section 46 of the, Environmental Protection Act 1986, to change condition 8-1 of Ministerial Statement 840. Read more...Last updated: October 24, 2011
The proposal is to develop and operate an open pit nickel mine and associated infrastructure on Mining Lease 77/00583 and haulage road on Mining Lease 77/00545 within the Shire of Kondinin. Read more...Last updated: October 12, 2011
Channar Mining Pty Ltd has submitted a proposal to mine iron ore in the Channar Mining Area Hamersley Ranges of Western Australia. The proposal involves the establishment of primary and secondary crushers adjacent to the mine site to crush the ore. The crushed ore will then be transported by conveyor to Paraburdoo for further treatment. The initial output will be 3 million tonnes per annum (Mt/a) increasing to 10 Mt/a by the ninth year. The expected lifetime of the mine is 22 years and the... Read more...Last updated: September 28, 2011
Proposal by BGC Contracting Pty Ltd and the Dampier Port Authority to develop a quarry and industrial site and set aside land for a heritage and conservation area within the King Bay Eastern Lease Area, Burrup Peninsula. Read more...Last updated: September 13, 2011
Koolyanobbing Iron Ore Expansion - proposal under s46 to remove condition 7 of Ministerial Statement 627. Read more...Last updated: August 8, 2011
The proposal is for the development and operation of a quarry incorporating excavation of approximately 60 million tonnes of hard rock, approximately 2 million tonnes of gravel and approximately 12 million tonnes of clay from the quarry footprint. Inquiry under s46 in regard to proposed changes to the environmental conditions of Ministerial Statement 706 . Read more...Last updated: August 5, 2011
The proposal is to construct and operate a number of looping sections adjacent (and connected) to the existing underground gas transmission pipeline within the DBNGP corridor. There are eleven separate looping sections proposed from south of Dampier to Wagerup West. Read more...Last updated: August 1, 2011
The proposal is to increase the mine dewatering rate up to 50 Gigalitres per annum and to inject surplus water into two brackish and one saline injection zones at the Christmas Creek Mine. Read more...Last updated: July 11, 2011
Inquiry under s46 regarding amendments to the conditions of Ministerial Statement 749 to remove the speed limit restrictions applied to mulgara habitat areas in this project. Read more...Last updated: June 30, 2011
The proposal is to expand existing wharf facilities to increase storage capacity and improve the efficiency of Dampier's port in general. The expansion involves the construction of a land-backed wharf, 300m jetty, lay down areas, access road and associated infrastructure. The wharf and lay down area would be constructed using reclaimed material from the dredging required to improve the approach and berthing channels. Read more...Last updated: June 10, 2011
The proposal encompasses an open pit iron ore mine at Cloud Break, approximately 100 kilometres north-north-west of Newman, and an accommodation village. Read more...Last updated: June 8, 2011
Ministerial Statement 800 - Gorgon Gas Development Revised and Expanded Proposal - Inquiry under s46 into a request for changes to conditions 18, 20 and 21. Read more...Last updated: June 2, 2011
Inquiry under s46 to amend condition 5-1 of Ministerial Statement 847 . Read more...Last updated: May 30, 2011
The proposal is to subdivide lots 1000, 2240, 2275, 2657 and 3045 Preston Beach Road, Lake Clifton. The proposal was withdrawn from the WAPC during the appeals process, thus no Ministerial decision was required. Read more...Last updated: May 23, 2011
The Environmental Protection Authority (EPA) has completed its assessment of the application to amend the Environmental Protection (Pinjar Gas Turbine Station Noise Emissions) Approval 2004 made by Verve Energy to the Minister for Environment on 8 February 2011, and which was referred to the EPA for assessment on 11 April 2011. Read more...Last updated: May 9, 2011
The proposal is to extend the transport depot at Lot 14 Great Northern Highway, Upper Swan. The extension involves the construction and use of a hardstand area for the parking of cars, trucks, trailers, and heavy machinery and the construction and use of a caretaker’s residence. Read more...Last updated: April 21, 2011
The proposal is to develop a granite quarry in Gidgegannup, which is expected to yield up to 500,000 tonnes of rock per annum. Read more...