This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: June 26, 2013
Chevron Australia Pty Ltd, as operator for the Gorgon Joint Venturers, proposes to extract, pipe, liquefy and export 10 million tonnes per annum of natural gas from the Greater Gorgon and Jansz gas fields using facilities offshore and on Barrow Island, Western Australia. Read more...Last updated: June 13, 2013
The proposal is to develop a residential subdivision on Lots 3000 (formerly Lot 1512) and 1523 Emu Point Drive, Albany and provide associated infrastructure. Inquiry under s46 into a requested change of conditions of Ministerial Statement 894 . Read more...Last updated: June 12, 2013
Inquiry under s46 - request to to amend Ministerial Statement 830 to contemporise and rationalise existing conditions. Read more...Last updated: June 4, 2013
This report provides the Environmental Protection Authority’s (EPA’s) advice and recommendations to the Minister for Environment on the proposal by the Shire of Manjimup to construct, operate and maintain a 6.5 kilometre (km) long all-weather, year-round access track from Windy Harbour Road to Nelson Location 7965, located entirely within the Doggerup Road reserve. Read more...Last updated: April 29, 2013
The development and operation of a quarry. Inquiry under s46 to delete conditions 11, 12 and 17 of Ministerial Statement 706 and condition 6 of Ministerial Statement 872 . Read more...Last updated: April 22, 2013
Minjar Gold Pty Ltd project involves varying the current status of the mine from Care and Maintenance to Operating, expanding a series of existing pits, developing new deposits and making a small addition to the accommodation facilities. The project has an established Carbon in Leach processing facility and tailings storage facility and existing approvals to operate (Works Approval and approved Mining Proposals). Minjar Gold plans to produce gold from a chain of open pits extending over a 50 km... Read more...Last updated: March 28, 2013
The revised proposal includes: a resort complex to accommodate approximately 370 tourists; expanded airstrip facilities, involving two sealed runways (05/23 and 09/27) and one grassed runway for use by single and twin engine propeller driven aircraft. lt is expected that both experienced and trainee pilots will utilise the site; and a nine hole golf course . The location of the primary runway (05/23) has been relocated 30 metres to the east of the previously identified location to increase the... Read more...Last updated: March 27, 2013
The proposal is to mine iron ore at Mesa A / Warramboo in the Robe Valley, Pilbara. The proposal involves the development of mine pits at Mesa A and Warramboo; a primary sizer processing plant; associated mine infrastructure; and the construction of a rail line to link into existing Mesa J mining operations., Note:, Also see Mesa A / Warramboo Iron Ore Project (s43) Read more...Last updated: March 27, 2013
Proposal by Robe River Mining Company Pty Ltd to mine iron ore at Mesa A/Warramboo. This report has been prepared in response to a request from the Minister under section 43(1) of the, Environmental Protection Act 1986, (EP Act) that the EPA re-assess the proposal in the light of additional information provided by the proponent. Read more...Last updated: March 18, 2013
The Environmental Protection Authority (EPA) has received a referral on the proposal to maintain a permanent water body in Lake Jualbup. The proposal is to convert Lake Jualbup into a constructed lake by lining the lake bed with a polymer additive and constructing sloped banks and concrete walls to reduce water loss to the surrounding environment. The EPA considers that the potential environmental issues associated with the proposal are: • Water quality impacts on aquatic fauna, • Impacts on... Read more...Last updated: March 18, 2013
Apache Northwest Pty Ltd propose to extend their infrastructure on Varanus Island. This project involves the installation of two Solar Mars 100 gas turbine compressors, Centaur 40 power generator, pipe rack, equipment room, as well as supporting infrastructure and services including accommodation camp upgrade, wharf upgrades, construction of a kitchen/mess cyclone refuge, upgrade of concrete batching plant and bulk earthworks. Read more...Last updated: March 13, 2013
Burswood Nominees Ltd intends to develop a 25 storey hotel addition at their integrated Crown Perth complex in Perth. The development will comprise two distinct areas: the Towers, which will accommodate a total of 500 rooms; and the low-rise Podium, which will contain a large convention and meeting complex, restaurants, retail and public spaces. Read more...Last updated: February 26, 2013
Proposal by Mermaid Marine Australia Ltd to upgrade the marine services facilities at the marine supply base in King Bay, Dampier. Proposal involves upgrading of existing facilities to service marine vessels and provide a protected anchorage to allow safe berthing, cargo handling, maintenance and shelter from extreme weather events. Read more...Last updated: February 25, 2013
To undertake mining of up to 12 – 13 Mt of remnant iron ore in the previously mined Mesa K deposit to meet the shortfall of dry ore produced from Mesa J. The proposal will utilise the existing Mesa J equipment fleet, personnel and infrastructure. Read more...Last updated: February 25, 2013
Main Roads Western Australia proposes to construct the Bunbury Outer Ring Road Southern Section (South Western Highway to Bussell Highway) at Bunbury. The project will provide improved access from Bussell Highway in the south, to the Bunbury Port and developing industrial area to the east of Bunbury. Read more...Last updated: February 12, 2013
Inquiry under s46 regarding proposed amendments to the Onslow Solar Salt Project, the subject of Ministerial Statement 401 . The changes to the project are to allow the start-up production to increase from 1.5 Mtpa to 2.5 Mtpa. Modifications proposed include: expansion of condenser pond area from 70 km 2 to 80 km 2 ; expansion of the crystalliser pond area from 7.2 km 2 to 8.2 km 2 ; area for storage of bitterns; extension of the jetty structure by 300 m; extension of the dredged approach... Read more...Last updated: February 11, 2013
BHP Billiton Iron Ore is proposing to develop the Cundaline and Callawa Iron Ore deposits located near the existing Goldsworthy operations, 200km east of Port Hedland in the Pilbara Region. New and existing Goldsworthy infrastructure would be utilised. Read more...Last updated: January 30, 2013
The proposal is to construct and operate a multi-user deep-water port with iron ore stockpiling, transfer and ship loading facilities and ancillary infrastructure at Anketell Point. The proposal allows for facilities required by the Proponent and future third parties to be developed. Read more...Last updated: January 30, 2013
The proposal is to construct and operate an iron ore mining area and associated infrastructure at the Hope Downs 4 Iron Ore Mine located approximately 30 kilometres north-west of Newman within the Shire of East Pilbara. Inquiry under s46 - request to change conditions 5-1, 8-2, 8-3, 9 and 10-2 of Ministerial Statement 854 . Read more...