This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: May 5, 2025
Chichester Metals Pty Ltd, a subsidiary of Fortescue Metals Group, proposes to develop and operate an iron ore mine approximately 80 kilometres north-west of Newman. The Nyidinghu Iron Ore Mine proposal includes mine pits above and below the water table, an on-site ore processing from various sources, waste rock and tailings storage, an aerodrome, groundwater abstraction, surplus water management including aquifer recharge and other supporting infrastructure. The proposal has a development... Read more...Last updated: April 7, 2025
Robe River Mining Co. Pty. Ltd is seeking to extend the life of operations at Robe Valley, located 146 km southwest of Karratha, in the Pilbara region of Western Australia. The proposal is a significant amendment to the Approved Proposals (MS 776, MS 1112 and MS 1141) and includes the development of new above and below water table iron ore deposits and associated activities to extend the life of the existing operations at Robe Valley. The proposal includes, but is not limited to: development of... Read more...Last updated: March 27, 2025
The Pilbara Infrastructure Pty Ltd., a subsidiary of Fortescue Metals Group, proposes to construct and operate a railway of 106 kilometres (km) and associated infrastructure. The East Hamersley Railway Project includes communications and signalling infrastructure, an ore loading facility, groundwater abstraction and discharge, borrow pits and quarries, culverts, bridges, diversion drains, pump station, construction camp, landfills and wastewater treatment plants, and other supporting... Read more...Last updated: March 7, 2025
Chichester Metals Pty Ltd is proposing to construct and operate an iron ore mine approximately 55 km north-west of Newman, and 30 km south of Fortescue’s existing Nyidinghu project in the Pilbara region. The proposal would require a disturbance footprint of 12,487 ha and is located within a 42,331 ha mine development envelope. The proposal is located within the Nyiyaparli and Nyiyaparli #3 Native Title determination area (WCD 2018/008) The proposal includes both above and below water table open... Read more...Last updated: November 4, 2024
The Proposal is for the development of the Rhodes Ridge Iron Ore Project (the Proposal), located approximately 40 kilometres north-west of Newman, in the Shire of East Pilbara. The Proposal requires a disturbance footprint of up to 14,850 hectares within a 61,301 hectares Development Envelope. The Proposal includes the development of new above and below water table deposits, and associated activities. The proposal includes but is not limited to: development of new deposits including above and... Read more...Last updated: December 22, 2023
Rio Tinto Winu Pty Limited (the Proponent) proposes to develop the Winu Project (the Proposal). The Proposal is a new copper-gold mine located approximately 300 km south of Broome and 320 km east of Port Hedland in the northern Pilbara region of Western Australia within both the Nyangumarta people’s and the Martu people’s Native Title Determination Areas. The Proposal conceptual footprint will require the clearing of up to 4,868 ha of native vegetation within a proposed 37,344 ha Development... Read more...Last updated: October 31, 2022
The requested change relates to condition 3 of Statement 1055 for an extension to the time limit for proposal implementation. Read more...Last updated: September 16, 2020
This proposal involves the recommencement and expansion of mining at the Telfer Gold Mine to include the mining and processing of 400 million tonnes of gold ore at a rate of up to 23 million tonnes per annum, and the transport of copper concentrate to Port Hedland by road. Key components of the expansion include: expansion of existing underground mining areas and deepening of the existing open pits; extensions to the existing southern waste rock dump and several other dumps; construction of a... Read more...Last updated: May 27, 2020
Changes to conditions 3-1 and 3-2, time limit of authorisation of Ministerial Statement 985 in order to extend the Time Limit of Authorisation. Read more...Last updated: May 4, 2016
Life-of-mine proposal to mine iron ore within Mining Leases 270SA and 47/292 at a rate of approximately 45 million tonnes per annum, and subsequent rehabilitation and decommissioning of the site. Read more...Last updated: August 7, 2015
The Minister for Environment requested the EPA inquire into the matter of changing the implementation conditions relating to the Orebody 18 Iron Ore Mine proposal, particularly the matter of setting a condition on the proposal that would require environmental offsets for the clearing of native vegetation. Inquiry under s46 relating to Ministerial Statement 439 and EPA Report 840 . Read more...Last updated: March 27, 2013
Proposal by Robe River Mining Company Pty Ltd to mine iron ore at Mesa A/Warramboo. This report has been prepared in response to a request from the Minister under section 43(1) of the, Environmental Protection Act 1986, (EP Act) that the EPA re-assess the proposal in the light of additional information provided by the proponent. Read more...Last updated: December 17, 2008
The proposal is to develop a new iron ore mine approximately 60 kilometres west-north-west of Tom Price and 25 kilometres south-west of the existing Brockman 2 mine. The major components of the project include: Three new mine pits- with approximately 20% of the orebody occurring below the water table; Dry processing plant- including crushers, overland conveyor and screens; this will be located to the north of the pits running east/west to the rail loop; Associated mine infrastructure- this... Read more...Last updated: December 20, 2002
Methanex proposes to develop a methanol complex on the Burrup Peninsula, approximately 1300 kilometres north of Perth. The selected project site is located in the King Bay – Hearson Cove Industrial Area, approximately 6 and 10 kilometres from the towns of Dampier and Karratha respectively. Approximately 84 hectares of the 100 hectare site will be cleared to accommodate the methanol complex. Read more...Last updated: December 20, 2002
The proposal is for construction and operation of a methanol plant of 1.05 million tonnes per annum (Mt/a) nominal capacity, at Withnell East industrial area on the Burrup Peninsula The proposal includes the installation of a gas supply pipeline, product pipeline, seawater supply pipeline and wastewater discharge pipeline to be situated in infrastructure corridors for which the Department of Mineral and Petroleum Resources (MPR) will be proponent. The plant footprint will occupy approximately... Read more...Last updated: November 28, 2000
The proposal is to develop two iron ore deposits (Nammuldi and Silvergrass) near Hamersley Iron Pty Limited’s current Brockman No. 2 iron ore mine, 65 kilometres north-west of Tom Price. Read more...Last updated: August 13, 1997
Proposed expansion of the Jimblebar iron ore mine (formerly known as McCamey’s Monster). The proposal by BHP Iron Ore (Jimblebar) Pty Ltd (the proponent) involves an increase in the mining rate from five to eight million tonnes per annum, and the expansion of both the scree and bedrock mining areas. Read more...Last updated: July 14, 1997
The proposal is to construct a pipeline fabrication site within the exrstmg Mardie Station Pastoral lease and existing Vacant Crown Land Reserve, approximately 45km south west of Dampier and 15km east of Cape Preston is detailed in the CER. Read more...