Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • (-) Remove Infrastructure filter Infrastructure
  • Iron Ore (7) Apply Iron Ore filter
  • Oil and gas (2) Apply Oil and gas filter
  • Industrial (1) Apply Industrial filter
  • Land use (1) Apply Land use filter

Filter by current status:

  • Ministerial Statement published (26) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (5) Apply Decision on whether to assess has been published filter
  • Assessment has been terminated under s40A of the EP Act (1) Apply Assessment has been terminated under s40A of the EP Act filter

Filter by relevant environmental factors:

  • (-) Remove Marine Environmental Quality filter Marine Environmental Quality
  • Benthic Communities and Habitats (17) Apply Benthic Communities and Habitats filter
  • Flora and Vegetation (16) Apply Flora and Vegetation filter
  • Marine Fauna (14) Apply Marine Fauna filter
  • Social Surroundings (11) Apply Social Surroundings filter
  • 37 (10) Apply 37 filter
  • Terrestrial Fauna (9) Apply Terrestrial Fauna filter
  • Coastal Processes (8) Apply Coastal Processes filter
  • Hydrological Processes (6) Apply Hydrological Processes filter
  • Terrestrial Environmental Quality (6) Apply Terrestrial Environmental Quality filter
  • Inland Waters Environmental Quality (5) Apply Inland Waters Environmental Quality filter
  • 3144 (1) Apply 3144 filter
  • Inland Waters (1) Apply Inland Waters filter
  • People (1) Apply People filter
  • Subterranean Fauna (1) Apply Subterranean Fauna filter

Filter by Proponent:

  • Forge Resources Swan Pty Ltd (2) Apply Forge Resources Swan Pty Ltd filter
  • Fortescue Metals Group Limited (2) Apply Fortescue Metals Group Limited filter
  • Leichhardt Industrials Pty Ltd (2) Apply Leichhardt Industrials Pty Ltd filter
  • Port Hedland Port Authority (2) Apply Port Hedland Port Authority filter
  • Water Corporation (2) Apply Water Corporation filter
  • Apache Energy Ltd (1) Apply Apache Energy Ltd filter
  • Apache Northwest Pty Ltd (1) Apply Apache Northwest Pty Ltd filter
  • API Management Pty Limited (1) Apply API Management Pty Limited filter
  • API Management Pty Ltd (1) Apply API Management Pty Ltd filter
  • Australian United Steel Industry Pty Limited (1) Apply Australian United Steel Industry Pty Limited filter
  • BHP Billiton Iron Ore (1) Apply BHP Billiton Iron Ore filter
  • BHP Billiton Iron Ore Pty Ltd (1) Apply BHP Billiton Iron Ore Pty Ltd filter
  • Chevron Australia (1) Apply Chevron Australia filter
  • Dampier Port Authority (1) Apply Dampier Port Authority filter
  • Department of Transport (1) Apply Department of Transport filter
  • Hamersley Iron Pty Limited (1) Apply Hamersley Iron Pty Limited filter
  • Hope Downs Management Services Pty Ltd (1) Apply Hope Downs Management Services Pty Ltd filter
  • Korean Steel Pty Ltd (1) Apply Korean Steel Pty Ltd filter
  • Mermaid Marine Australia Ltd (1) Apply Mermaid Marine Australia Ltd filter
  • North West Infrastructure (1) Apply North West Infrastructure filter
  • NWIOA Ops. Pty Ltd (trading as North West Infrastructure) (1) Apply NWIOA Ops. Pty Ltd (trading as North West Infrastructure) filter
  • Onslow Infraco Pty Ltd (1) Apply Onslow Infraco Pty Ltd filter
  • Onslow Marine Support Base Pty Ltd (1) Apply Onslow Marine Support Base Pty Ltd filter
  • Roy Hill Infrastructure Pty Ltd (1) Apply Roy Hill Infrastructure Pty Ltd filter
  • Shire of Ashburton (1) Apply Shire of Ashburton filter
  • Subsea 7 Australia Contracting PTY LTD (1) Apply Subsea 7 Australia Contracting PTY LTD filter
  • Woodside Energy Ltd (1) Apply Woodside Energy Ltd filter

Filter by region:

  • (-) Remove Pilbara filter Pilbara

Filter by last updated:

  • 2025 (1) Apply 2025 filter
  • 2024 (4) Apply 2024 filter
  • 2023 (4) Apply 2023 filter
  • 2022 (2) Apply 2022 filter
  • 2021 (1) Apply 2021 filter
  • 2020 (3) Apply 2020 filter
  • 2019 (2) Apply 2019 filter
  • 2018 (3) Apply 2018 filter
  • 2014 (2) Apply 2014 filter
  • 2013 (4) Apply 2013 filter
  • 2012 (1) Apply 2012 filter
  • 2011 (1) Apply 2011 filter
  • 2008 (1) Apply 2008 filter
  • 2002 (1) Apply 2002 filter
  • 2001 (1) Apply 2001 filter
  • 1996 (1) Apply 1996 filter
  1. Home
  2. Proposal search
  3. Pilbara
  4. Marine Environmental Quality
  5. Infrastructure

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Onslow Recreational Jetty

Last updated: February 3, 2025

The proposal is for the construction and operation of a recreational jetty at Beadon Point, Onslow, Western Australia. The Proposal will provide a pedestrian jetty alongside the ruins of the historic Onslow Jetty for tourism and fishing. The jetty will not be designed to accommodate vehicles or vessels and will be for pedestrians only. Some land clearing will be required to allow an access track and a boardwalk access path to the jetty. Read more...

Ashburton Infrastructure Project

Last updated: November 25, 2024

The Proposal is located in the Pilbara region of Western Australia within a development envelope of 20,821 ha and clearing no more than 1,564 ha. Onslow Infraco Pty Ltd (herein MRL a wholly owned subsidiary of Mineral Resources Limited) is proposing to develop: • A fully sealed private haul road, approximately 125km in length • Gas pipeline and ancillary haul road infrastructure. • Storage and bulk handling of ore at the Port of Ashburton. • Dredging a dedicated berthing pocket adjacent to the... Read more...

Pluto LNG Development (Site B Option), Burrup Peninsula

Last updated: November 25, 2024

The construction of facilities for the development of the Pluto Gas Field on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on the Burrup Peninsula. Extensive dredging will be undertaken adjacent to the export facility. Read more...

Lumsden Point General Cargo Facility

Last updated: August 12, 2024

The proposal is to develop and operate a general cargo facility within the Port Hedland inner harbour, within the Town of Port Hedland. This proposal has been superseded by the Lumsden Point General Cargo Facility Read more...

Upgrade of multi-user seawater supply and introduction of wastewater to ocean outfall, Burrup Peninsula (s46)

Last updated: April 19, 2024

The Water Corporation submitted a proposal 'Burrup Peninsula Desalinated Water and Seawater Supplies Project' in May 2001 (Water Corporation, 2001a) to service the requirements of new industrial developments on the Burrup Peninsula. The proposed scheme was designed to supply seawater and desalinated water to the Syntroleum Sweetwater Corporation (Syntroleum) gas to liquids plant, with additional capacity to supply one or possibly two other process plants. The EPA released its report (... Read more...

Multi-user Iron Ore Export (Landside) Facility

Last updated: July 31, 2023

The proposal will provide additional port facilities at Port Hedland to receive and stockpile the product from emerging miners, specifically the various mines owned by the proponent’s shareholders, and load this product onto ships for export. Each of the shareholders is exploring and developing new iron ore projects in the Pilbara, with one company actively mining ore and exporting through the existing facilities in the Port of Port Hedland. The current shareholders of the proponent are Atlas... Read more...

Multi-user Iron Ore Export (Landside) Facility, Port Hedland (s. 46)

Last updated: July 31, 2023

The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. Inquiry under s46 in response to a request to change condition 3 - Time Limit for Proposal Implementation of Ministerial Statement 891 . This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...

Roy Hill 1 iron ore project port infrastructure proposal (s. 46)

Last updated: July 31, 2023

The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. Inquiry under s46 regarding amending the conditions of Ministerial Statement 858 . This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...

Dampier Seawater Desalination Plant (DSDP)

Last updated: April 11, 2023

The proponent (Hamersley Iron Pty Limited) proposes to build and develop a desalination plant at Parker Point, Dampier, located approximately 2.5km north-east of the Dampier township. This Proposal will establish a reliable potable water supply for the Proponent’s Dampier port operation (including Parker Point and East Intercourse Island), Dampier town and connection into Water Corporation’s West Pilbara Water Supply Scheme (WPWSS). The desalination plant may be delivered in stages up to a... Read more...

Balla Balla Export Facilities

Last updated: July 1, 2022

The proposal is to construct and operate an iron ore export facility at Balla Balla midway between Port Hedland and Karratha, northwest of Whim Creek in the Pilbara region of WA. Read more...

Dredging at Finucane Island, BHP Billiton RGP5 Project, Port Hedland

Last updated: January 25, 2022

Dredging of approximately 3,900,000 cubic metres of material for two new berth pockets and extensions to the existing departure channel and swing basin at Harriet Point and Stanley Point; disposal of dredged material at dredged material management areas. Read more...

Devil Creek Gas Development Project

Last updated: September 1, 2021

The proposal is for the construction and operation of a gas processing plant, onshore supply gas pipeline, onshore sales gas pipeline, and horizontal directionally drilled shore crossing. Read more...

Cape Preston East Iron Ore Export Facility (s46) [2183]

Last updated: August 6, 2020

Change to Extension of Timeframe for substantial commencement. Read more...

Pilbara Iron Ore and Infrastructure Project: Port and North - South Railway (Stage A) (s46) [2231]

Last updated: June 3, 2020

S46 change - Removal of Condition 17: Dust Management Read more...

Balla Balla Export Facilities (s46) [2220]

Last updated: January 20, 2020

The Minister for Environment has requested that the Environmental Protection Authority (EPA) inquire into and report on the matter of changing the implementation conditions in Ministerial Statement 945 relating to Forge Resources Swan Pty Ltd’s Balla Balla Export Facilities proposal. Read more...

Learmonth Bundle Site

Last updated: May 15, 2019

Subsea 7 proposes to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35km south of the Exmouth Townsite. A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields. The proposal consists of an onshore pipeline bundle fabrication site and associated infrastructure, two bundle tracks (approximately 10km in length) along which the... Read more...

Onslow Marine Support Base Stage 2 Capital Dredging

Last updated: March 6, 2019

Onslow Marine Support Base Pty Ltd is proposing to modify and extend the Beadon Creek harbour approach channel, turning basin and berth pocket as part of Stage 2 of the Onslow Marine Support Base (OMSB) proposal. The proposed capital dredging will enable offshore supply vessels to access the newly constructed OMSB land-backed wharf facility (Stage 1) within the Beadon Creek Maritime Facility. 930,000 cubic metres of dredge material will be disposed of onshore to a 44 hectare Dredge material... Read more...

Cape Preston East – Multi-Commodity Export Facility

Last updated: November 12, 2018

The proposal is to construct and operate an iron ore export facility at Cape Preston East in the Pilbara region of WA. Read more...

Anketell Point Port Development (s46) [2162]

Last updated: May 14, 2018

Section 46 extension to the Time Limit for Authorisation for substantial commencement. Read more...

Johns Creek Boat Harbour Maintenance Dredging

Last updated: April 16, 2018

Johns Creek Boat Harbour is a small facility located at Point Samson, 40 km east of Karratha.  Dredging of the Boat Harbour and Entrance Channel is required to restore navigable depths, and is planned for autumn 2018. Maintenance dredging is proposed to occur within the Boat Harbour and Entrance Channel, with disposal to a sandbank about 1 km south of the Boat Harbour (Western Disposal area). Read more...

Pages

  • 1
  • 2
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.