Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Iron Ore (17) Apply Iron Ore filter
  • Infrastructure (15) Apply Infrastructure filter
  • Oil and gas (9) Apply Oil and gas filter
  • Industrial (4) Apply Industrial filter
  • Gold (3) Apply Gold filter
  • Utilities (3) Apply Utilities filter
  • Power generation (2) Apply Power generation filter
  • Salt (2) Apply Salt filter
  • Manganese (1) Apply Manganese filter

Filter by current status:

  • Ministerial Statement published (20) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (15) Apply Decision on whether to assess has been published filter
  • EPA Report and Recommendations released - appeals open (6) Apply EPA Report and Recommendations released - appeals open filter
  • Ministerial Statement withdrawn under s.47A (2) Apply Ministerial Statement withdrawn under s.47A filter
  • Assessment has been terminated under s40A of the EP Act (1) Apply Assessment has been terminated under s40A of the EP Act filter
  • Assessment on Proponent Information – public submission period closed (1) Apply Assessment on Proponent Information – public submission period closed filter
  • EPA Report and Recommendations released - not appealable (1) Apply EPA Report and Recommendations released - not appealable filter
  • Proposal withdrawn (1) Apply Proposal withdrawn filter
  • Response to submission published (1) Apply Response to submission published filter
  • Seven-day public comment period closed (1) Apply Seven-day public comment period closed filter

Filter by relevant environmental factors:

  • Flora and Vegetation (26) Apply Flora and Vegetation filter
  • Terrestrial Fauna (25) Apply Terrestrial Fauna filter
  • Social Surroundings (19) Apply Social Surroundings filter
  • 3144 (15) Apply 3144 filter
  • Subterranean Fauna (12) Apply Subterranean Fauna filter
  • Inland Waters (11) Apply Inland Waters filter
  • 37 (7) Apply 37 filter
  • Benthic Communities and Habitats (6) Apply Benthic Communities and Habitats filter
  • Hydrological Processes (6) Apply Hydrological Processes filter
  • Marine Environmental Quality (6) Apply Marine Environmental Quality filter
  • Marine Fauna (6) Apply Marine Fauna filter
  • Terrestrial Environmental Quality (6) Apply Terrestrial Environmental Quality filter
  • Inland Waters Environmental Quality (5) Apply Inland Waters Environmental Quality filter
  • Coastal Processes (2) Apply Coastal Processes filter
  • Landforms (1) Apply Landforms filter

Filter by Proponent:

  • Chevron Australia Pty Ltd (5) Apply Chevron Australia Pty Ltd filter
  • Fortescue Metals Group Limited (2) Apply Fortescue Metals Group Limited filter
  • Hamersley Iron Pty Limited (2) Apply Hamersley Iron Pty Limited filter
  • Onslow Infraco Pty Ltd (2) Apply Onslow Infraco Pty Ltd filter
  • Pilbara Energy (Generation) Pty Ltd (2) Apply Pilbara Energy (Generation) Pty Ltd filter
  • Port Hedland Port Authority (2) Apply Port Hedland Port Authority filter
  • Tropicana Joint Venture (2) Apply Tropicana Joint Venture filter
  • Water Corporation (2) Apply Water Corporation filter
  • Woodside Energy Ltd (2) Apply Woodside Energy Ltd filter
  • Agrimin Limited (1) Apply Agrimin Limited filter
  • Alinta DEWAP Pty Ltd (1) Apply Alinta DEWAP Pty Ltd filter
  • API Management Pty Limited (1) Apply API Management Pty Limited filter
  • Atlas Iron (1) Apply Atlas Iron filter
  • Atlas Iron Pty Ltd (1) Apply Atlas Iron Pty Ltd filter
  • BHP Billiton Iron Ore Pty Ltd (1) Apply BHP Billiton Iron Ore Pty Ltd filter
  • BHP Iron Ore Pty Ltd (1) Apply BHP Iron Ore Pty Ltd filter
  • Buru Energy Limited (1) Apply Buru Energy Limited filter
  • Consolidated Minerals Pty Ltd (1) Apply Consolidated Minerals Pty Ltd filter
  • DBNGP (WA) Nominees Pty Ltd (1) Apply DBNGP (WA) Nominees Pty Ltd filter
  • FMG Iron Bridge (Aust) Pty Ltd (1) Apply FMG Iron Bridge (Aust) Pty Ltd filter
  • Greatland Pty Ltd (1) Apply Greatland Pty Ltd filter
  • Hamersley HMS Pty Limited (1) Apply Hamersley HMS Pty Limited filter
  • Hamersley Iron Pty Limited (a wholly owned subsidiary of Rio Tinto) (1) Apply Hamersley Iron Pty Limited (a wholly owned subsidiary of Rio Tinto) filter
  • Leichhardt Port Pty Ltd (1) Apply Leichhardt Port Pty Ltd filter
  • Mount Bruce Mining Pty Ltd (1) Apply Mount Bruce Mining Pty Ltd filter
  • NW Interconnected Power Pty Ltd (1) Apply NW Interconnected Power Pty Ltd filter
  • NWIOA Ops. Pty Ltd trading as North West Infrastructure (1) Apply NWIOA Ops. Pty Ltd trading as North West Infrastructure filter
  • Onslow Iron Pty Ltd and API Management Pty Limited (1) Apply Onslow Iron Pty Ltd and API Management Pty Limited filter
  • Perdaman Chemicals and Fertilisers Pty Ltd (1) Apply Perdaman Chemicals and Fertilisers Pty Ltd filter
  • Pilbara Ports (1) Apply Pilbara Ports filter
  • Pilbara Ports Authority (1) Apply Pilbara Ports Authority filter
  • Reward Minerals (1) Apply Reward Minerals filter
  • Rhodes Ridge Management Services Pty Ltd (1) Apply Rhodes Ridge Management Services Pty Ltd filter
  • Robe River Mining Co. Pty Ltd. (1) Apply Robe River Mining Co. Pty Ltd. filter
  • Roy Hill Infrastructure Pty Ltd (1) Apply Roy Hill Infrastructure Pty Ltd filter
  • Roy Hill Iron Ore Pty Ltd (1) Apply Roy Hill Iron Ore Pty Ltd filter
  • Woodside Energy Ltd (1) Apply Woodside Energy Ltd filter

Filter by region:

  • (-) Remove Pilbara filter Pilbara
  • Kimberley (1) Apply Kimberley filter

Filter by last updated:

  • (-) Remove 2024 filter 2024
  1. Home
  2. Proposal search
  3. Pilbara
  4. 2024

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

West Angelas Revised Proposal

Last updated: December 19, 2024

Robe River Mining Co. Pty Ltd. (the proponent) propose to develop new above and below water table iron ore mine pits and associated infrastructure to sustain existing West Angelas operations. The proposal is located approximately 130 kilometres northwest of Newman in the Pilbara region of Western Australia. The proposal will involve clearing of an additional 7,200 hectares (ha) of native vegetation (in addition to the 12,205 ha currently authorised under Ministerial Statement 1113) within a... Read more...

Lake Disappointment Potash Project

Last updated: December 18, 2024

Reward Minerals propose to develop the Lake Disappointment Potash Project (located approximately 320 km east of Newman). The proposal is to abstract brine from sediments and use solar evaporation ponds on the surface of the lake to create the potash product. The proposal would disturb 7,250 ha of land which includes 437 ha of vegetation, with the remainder of disturbance to the surface of Lake Disappointment. Read more...

Mackay Sulphate of Potash Project

Last updated: December 10, 2024

The Proposal involves the development of a greenfields Sulphate of Potash fertiliser operation which is currently designed to operate for a 20-year period. The Proposal involves the on-lake development of trenches and solar evaporation ponds for brine extraction and Sulphate of Potash production. The off-lake development includes a processing plant, associated site infrastructure and access roads for trucking Sulphate of Potash product to Wyndham Port. A northern linear access corridor will... Read more...

Telfer - Havieron Gold Mining Project

Last updated: December 5, 2024

Newcrest Operations Limited proposes to construct and operate the Telfer – Havieron Gold Mining Project (the Project). The Telfer Gold Mine is located about 55 km to the west of the Havieron Gold Mine and 400 km south-east of Port Hedland in the Great Sandy Desert region of Western Australia. The project includes: The open pit and underground mining and subsequent processing of gold-copper ore at the Telfer Gold with associated infrastructure including a 160 MW natural gas-fired power station,... Read more...

Woodie Continued Operations Project

Last updated: December 2, 2024

Consolidated Minerals Pty Ltd the proponent) propose to develop the Woodie Continued Operations Project. The proposal is an expansion of the existing Woodie Woodie Manganese Mine operations (Pilbara Manganese Pty Ltd, a wholly owned subsidiary of Consolidated Minerals Pty Ltd) which is not subject to a Ministerial Statement issued under Part IV of the Environmental Protection Act 1986 (EP Act). The proposal is located approximately 100 km east of Marble Bar and Nullagine and 400 km south east... Read more...

Yarnima Power Station Stage 4 (Gas Reciprocating Engines)

Last updated: November 29, 2024

The proponent, BHP Iron Ore Pty, proposes to increase power generation capacity at the existing Yarnima Power Station, approximately 2 kilometres north-west of Newman in the Pilbara. The proposal comprises an increase in installed firm power generation capacity from 154 megawatts up to 239 megawatts via installation of gas reciprocating engines and associated infrastructure. The gas reciprocating engines are proposed to be installed in stages up to a maximum of 120 megawatts (nominal).... Read more...

Brockman Syncline Proposal

Last updated: November 27, 2024

The Brockman Syncline proposal is located approximately 60 km west-north west of Tom Price, in the central Pilbara region of Western Australia. The proposal includes up to 9,977 ha of native vegetation clearing to support the development of new and above and below water table mining areas in order to sustain mining at three existing operations; Nammuldi-Silvergrass Brockman 2 Brockman 4 The proposal includes, but is not limited to the following: Dewatering and surplus water management,... Read more...

Hope Downs 2

Last updated: November 27, 2024

Hamersley HMS Pty Limited (the proponent) proposes to develop two new above water table (AWT) iron ore mine pits at the Hope Downs 2 proposal, located approximately 80 km north-west of the township of Newman in the Pilbara Region of Western Australia. The proposal includes a conceptual footprint of approximately 4,700 hectares (ha) to support the development, operation and closure of two new AWT iron ore deposits within a proposed Development Envelope of approximately 14,085 ha. The key... Read more...

McPhee Creek Iron Ore Project (s46) [2490]

Last updated: November 25, 2024

Change the implementation conditions relating to greenhouse gas emissions Read more...

Wheatstone Development – Gas Processing, Export Facilities and Infrastructure (s46) [2490]

Last updated: November 25, 2024

Change the implementation conditions relating to greenhouse gas emissions Read more...

West Pilbara Iron Ore Project – Stage 1 (s46) [2490]

Last updated: November 25, 2024

Change the implementation conditions relating to greenhouse gas emissions Read more...

Ashburton Infrastructure Project (s46) [2490]

Last updated: November 25, 2024

Change the implementation conditions relating to greenhouse gas emissions Read more...

Pluto Liquified Natural Gas Development (Site B Option) Burrup Peninsula (s46) [2490]

Last updated: November 25, 2024

Change the implementation conditions relating to greenhouse gas emissions Read more...

Revised Proposal for the Roy Hill Iron Ore Mine (s46) [2490]

Last updated: November 25, 2024

Change the implementation conditions relating to greenhouse gas emissions Read more...

Greater Paraburdoo Iron Ore Hub (s46) [2490]

Last updated: November 25, 2024

Change the implementation conditions relating to greenhouse gas emissions Read more...

Gorgon Gas Development Revised and Expanded Proposal: Barrow Island Nature Reserve (s46) [2490]

Last updated: November 25, 2024

Change the implementation conditions relating to greenhouse gas emissions Read more...

Tropicana Gold Project (s46) [2490]

Last updated: November 25, 2024

Change the implementation conditions relating to greenhouse gas emissions. Read more...

Pilbara Energy Generation Power Station (s46) [2490]

Last updated: November 25, 2024

Change the implementation conditions relating to greenhouse gas emissions Read more...

Tropicana Gold Project

Last updated: November 25, 2024

The proposal is the construction and operation of an open cut gold mine and associated infrastructure, located approximately 330 km east-north-east of Kalgoorlie and 200 km east of Laverton. Read more...

Pilbara Energy Generation Power Station

Last updated: November 25, 2024

PEG proposes to construct and operate 14 new gas-fired reciprocating engines with a combined maximum installed capacity of 165 MW. It is expected the average annual throughput of the facility will be approximately 150 MW. The 165 MW power station is expected to result in 609,696 tCO2-e. The proposed PEG power station is located next to the existing Solomon power station and replaces the need for 221 MW power at Iron Bridge, which would have resulted in 1,196,423 tCO2-e. FMG have submitted a... Read more...

Pages

  • 1
  • 2
  • 3
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.