Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • (-) Remove Industrial filter Industrial
  • Infrastructure (8) Apply Infrastructure filter
  • Iron Ore (3) Apply Iron Ore filter
  • Bauxite (1) Apply Bauxite filter

Filter by current status:

  • Ministerial Statement published (29) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (6) Apply Decision on whether to assess has been published filter
  • Assessment has been terminated under s40A of the EP Act (2) Apply Assessment has been terminated under s40A of the EP Act filter
  • Environmental Scoping Document approved (2) Apply Environmental Scoping Document approved filter
  • Ministerial Statement withdrawn under s.47A (2) Apply Ministerial Statement withdrawn under s.47A filter
  • Assessment on Proponent Information – public submission period closed (1) Apply Assessment on Proponent Information – public submission period closed filter
  • EPA Report and Recommendations released - not appealable (1) Apply EPA Report and Recommendations released - not appealable filter
  • Minister determined that the proposal should not be implemented (1) Apply Minister determined that the proposal should not be implemented filter
  • Public Environmental Review document in preparation (1) Apply Public Environmental Review document in preparation filter

Filter by relevant environmental factors:

  • (-) Remove Social Surroundings filter Social Surroundings
  • 37 (25) Apply 37 filter
  • Flora and Vegetation (25) Apply Flora and Vegetation filter
  • Terrestrial Fauna (19) Apply Terrestrial Fauna filter
  • Terrestrial Environmental Quality (13) Apply Terrestrial Environmental Quality filter
  • Marine Environmental Quality (12) Apply Marine Environmental Quality filter
  • Inland Waters Environmental Quality (9) Apply Inland Waters Environmental Quality filter
  • Inland Waters (7) Apply Inland Waters filter
  • Benthic Communities and Habitats (6) Apply Benthic Communities and Habitats filter
  • Hydrological Processes (6) Apply Hydrological Processes filter
  • Marine Fauna (6) Apply Marine Fauna filter
  • Coastal Processes (5) Apply Coastal Processes filter
  • Landforms (4) Apply Landforms filter
  • Human Health (3) Apply Human Health filter
  • Subterranean Fauna (2) Apply Subterranean Fauna filter
  • 3144 (1) Apply 3144 filter
  • People (1) Apply People filter

Filter by Proponent:

  • Alcoa of Australia Limited (2) Apply Alcoa of Australia Limited filter
  • NW Interconnected Power Pty Ltd (2) Apply NW Interconnected Power Pty Ltd filter
  • Wesfarmers CSBP Ltd (2) Apply Wesfarmers CSBP Ltd filter
  • Albemarle Lithium Pty Ltd (1) Apply Albemarle Lithium Pty Ltd filter
  • Alcoa World Alumina Australia (1) Apply Alcoa World Alumina Australia filter
  • Austral Bricks (WA) Pty Ltd (1) Apply Austral Bricks (WA) Pty Ltd filter
  • Australian Gold Reagents Pty Ltd (1) Apply Australian Gold Reagents Pty Ltd filter
  • Australian Methanol Company Pty Ltd (1) Apply Australian Methanol Company Pty Ltd filter
  • Australian United Steel Industry Pty Limited (1) Apply Australian United Steel Industry Pty Limited filter
  • Benale Pty Ltd (1) Apply Benale Pty Ltd filter
  • Burrup Fertilisers Pty Ltd (1) Apply Burrup Fertilisers Pty Ltd filter
  • Burrup Nitrates Pty Ltd (1) Apply Burrup Nitrates Pty Ltd filter
  • Chichester Metals Pty Ltd (1) Apply Chichester Metals Pty Ltd filter
  • CSBP Limited (1) Apply CSBP Limited filter
  • Dampier Nitrogen Pty Ltd (1) Apply Dampier Nitrogen Pty Ltd filter
  • Department of Commerce and Trade (1) Apply Department of Commerce and Trade filter
  • Eastern Metropolitan Regional Council (1) Apply Eastern Metropolitan Regional Council filter
  • Esperance Port Authority (1) Apply Esperance Port Authority filter
  • FutureEnergy Australia Pty Ltd (1) Apply FutureEnergy Australia Pty Ltd filter
  • Grange Resources Ltd (1) Apply Grange Resources Ltd filter
  • HIsmelt (Operations) Pty. Limited (1) Apply HIsmelt (Operations) Pty. Limited filter
  • Keppel Holdings Pty Ltd (1) Apply Keppel Holdings Pty Ltd filter
  • Kingstream Resources NL (1) Apply Kingstream Resources NL filter
  • Methanex Corporation (1) Apply Methanex Corporation filter
  • Moora Pulp and Paper Company Pty. Ltd (1) Apply Moora Pulp and Paper Company Pty. Ltd filter
  • MRC Graphite Pty Ltd (1) Apply MRC Graphite Pty Ltd filter
  • Perdaman Chemicals and Fertilisers Pty Ltd (1) Apply Perdaman Chemicals and Fertilisers Pty Ltd filter
  • Port Hedland Port Authority (1) Apply Port Hedland Port Authority filter
  • Primary Energy Pty Limited (1) Apply Primary Energy Pty Limited filter
  • Saracen Properties Pty Ltd (1) Apply Saracen Properties Pty Ltd filter
  • Simcoa Operations Pty Ltd (1) Apply Simcoa Operations Pty Ltd filter
  • Specialized Container Transport (1) Apply Specialized Container Transport filter
  • State Energy Commission of Western Australia (1) Apply State Energy Commission of Western Australia filter
  • SubSea International Australia Inc (1) Apply SubSea International Australia Inc filter
  • Wasterock Pty Ltd; Hazelland Pty Ltd (1) Apply Wasterock Pty Ltd; Hazelland Pty Ltd filter
  • Water Corporation (1) Apply Water Corporation filter
  • Wesfarmers Chemicals Energy & Fertilisers Limited (1) Apply Wesfarmers Chemicals Energy & Fertilisers Limited filter
  • Wespine Industries Pty Ltd (1) Apply Wespine Industries Pty Ltd filter
  • Western Australian Land Authority (trading as DevelopmentWA) (1) Apply Western Australian Land Authority (trading as DevelopmentWA) filter
  • Worsley Alumina Pty Ltd (1) Apply Worsley Alumina Pty Ltd filter
  • Yara Pilbara Fertilisers Pty Ltd (1) Apply Yara Pilbara Fertilisers Pty Ltd filter
  • Yara Pilbara Nitrates Pty Ltd (1) Apply Yara Pilbara Nitrates Pty Ltd filter

Filter by region:

  • Pilbara (15) Apply Pilbara filter
  • Perth (14) Apply Perth filter
  • South West (6) Apply South West filter
  • Great Southern (3) Apply Great Southern filter
  • Peel (3) Apply Peel filter
  • Wheatbelt (2) Apply Wheatbelt filter
  • Goldfields Esperance (1) Apply Goldfields Esperance filter
  • Mid West (1) Apply Mid West filter

Filter by last updated:

  • 2025 (3) Apply 2025 filter
  • 2024 (6) Apply 2024 filter
  • 2023 (1) Apply 2023 filter
  • 2022 (2) Apply 2022 filter
  • 2021 (3) Apply 2021 filter
  • 2020 (4) Apply 2020 filter
  • 2019 (1) Apply 2019 filter
  • 2018 (2) Apply 2018 filter
  • 2016 (2) Apply 2016 filter
  • 2015 (2) Apply 2015 filter
  • 2010 (1) Apply 2010 filter
  • 2007 (1) Apply 2007 filter
  • 2005 (2) Apply 2005 filter
  • 2003 (1) Apply 2003 filter
  • 2002 (3) Apply 2002 filter
  • 2001 (1) Apply 2001 filter
  • 1999 (1) Apply 1999 filter
  • 1998 (2) Apply 1998 filter
  • 1997 (2) Apply 1997 filter
  • 1996 (3) Apply 1996 filter
  • 1994 (1) Apply 1994 filter
  • 1991 (1) Apply 1991 filter
  1. Home
  2. Proposal search
  3. Industrial
  4. Social Surroundings

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Nyidinghu Iron Ore Mine

Last updated: May 5, 2025

Chichester Metals Pty Ltd, a subsidiary of Fortescue Metals Group, proposes to develop and operate an iron ore mine approximately 80 kilometres north-west of Newman. The Nyidinghu Iron Ore Mine proposal includes mine pits above and below the water table, an on-site ore processing from various sources, waste rock and tailings storage, an aerodrome, groundwater abstraction, surplus water management including aquifer recharge and other supporting infrastructure. The proposal has a development... Read more...

Narrogin FutureEnergy Park

Last updated: March 4, 2025

FutureEnergy Australia is proposing to construct and operate a biorefinery processing plant to produce a renewable biodiesel. The proposed proposal is located on Lot 31 on Plan 404104, Narrogin, within the shire of Narrogin, Western Australia. The proposal includes a biorefinery plant, a feedstock receival area, woodchip drying beds, and supporting infrastructures. The biorefinery plant will utilize waste lignocellulose biomass as feedstock which will undergo pyrolysis followed by non-catalytic... Read more...

Perdaman Urea Project

Last updated: January 21, 2025

Perdaman Chemicals and Fertilisers Pty Ltd intends to construct and operate a urea plant with a production capacity of approximately 2 million tonnes per annum (Mtpa) on Sites C and F within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula. Both sites are located adjacent to the Murujuga National Park. The EPA considered the Study of the Cumulative Impacts of Air Emissions in the Murujuga Airshed in its assessment of the Perdaman Urea Project. Read more...

Albemarle Kemerton Plant

Last updated: November 25, 2024

Albemarle Lithium Pty Ltd (Albemarle) is proposing to stablish the Albemarle Kemerton Plant, a Lithium hydroxide Product manufacturing plant and associated infrastructure, within the Kemerton Strategic Industrial Area (KSIA), approximately 17 kilometres north-east of Bunbury. The Albemarle Kemerton Plant will produce up to 100,000 tonne per annum (tpa) of lithium hydroxide monohydrate (Lithium Hydroxide Product) from five 20,000 tpa process trains and produce up to 1,100,000 tpa of tailings.... Read more...

Utah Point Berth Project (Stage B)

Last updated: September 27, 2024

The Utah Point Berth Project consists of two separate stages: Stage A: Dredging and Reclamation; and Stage B: Construction and Operation. Stage A, dredging and reclamation works for the UPBP was approved by the Minister for Environment as an amendment to the existing Fortescue Metals Group (FMG) approval and managed according to the approved conditions. The works for Stage A have been successfully completed. The EPA determined that Stage B, the construction and ongoing operation of stockyard... Read more...

Cape Riche Seawater Desalination Plant (S46) [2383]

Last updated: July 4, 2024

Time limit for substantial commencement, review of the adequacy of existing implementation conditions to ensure consistency with the EPA’s current objectives for each environmental factor. Read more...

Major (staged) expansion of pine log sawmill, Moore Road, Dardanup

Last updated: May 21, 2024

The proposal is for a major staged expansion to Wespine's operations at the pine log sawmill, Moore Road, Dardanup. By making adjustments, replacements and additions to the existing plant and equipment and methods of operation, Wespine proposes to progressively increase the throughput of the sawmill, via a series of stages, from the current annual log input capacity of 70,000 m 3 to 400,000 m 3 over a ten year period. Major changes involved in the upgrade of the Dardanup pine log sawmill... Read more...

Asian Renewable Energy Hub

Last updated: April 11, 2024

NW Interconnected Power Pty Ltd is seeking to develop the Asian Renewable Energy Hub. The proposal is to construct and operate a large-scale wind and solar hybrid renewable energy project, approximately 220 km east of Port Hedland, WA. The renewable energy will be exported via a subsea power cable to Indonesia and Singapore. Onshore components comprise a series of linear arrays of wind turbines (up to 1,743 turbines) and solar panels distributed across a 644,600 ha development envelope, with a... Read more...

Kemerton Strategic Industrial Area (KSIA)

Last updated: April 2, 2024

DevelopmentWA is seeking to develop the Kemerton Strategic Industrial Area (KSIA) for the purpose of industrial and infrastructure development as a strategic proposal. The KSIA is located within the Shire of Harvey, 17 kilometres north of Bunbury. The KSIA key characteristics are: Development of the Kemerton Strategic industry Zone (Industry Core) which is approximately 2,024 hectares (ha). There is an approximate 50-year time period for development. Ultimate land use proposed is to be heavy... Read more...

Pinjarra Alumina Refinery Revised Proposal

Last updated: November 27, 2023

Alcoa of Australia Limited is proposing to increase production at the Pinjarra Alumina Refinery (the refinery) and increase the rate of bauxite mining at the existing Huntly Mine within Mineral Lease 1SA (ML1SA) to supply 2.5 million tonnes per annum (Mtpa) bauxite, for export to third party customers. The Proposal comprises the following components: an increase in alumina production at the refinery by 5 percent, from 5.0 Mtpa to 5.25 Mtpa; A transition of the Huntly mine into the Myara North... Read more...

Remediation of Lot 20 Adelaide Street Hazelmere

Last updated: December 19, 2022

Wasterock Pty Ltd and Hazelland Pty Ltd propose to remediate a historical inert landfill located at Lot 20 Adelaide Street Hazelmere for future commercial use. The proposal would involve recontouring the existing site and capping it with clean fill. Read more...

Ammonia Plant, Murujuga (Burrup Peninsula), Renewable Hydrogen Project

Last updated: August 4, 2022

Yara Pilbara Fertilisers Pty Ltd propose to modify the existing Pilbara Fertiliser project to include the development of a Renewable Hydrogen Plant and associated infrastructure. The proposal is located approximately 11 km north-west of Karratha in the Pilbara region of Western Australia. The proposal is adjacent to the National Heritage listed area and the Murujuga National Park. The proposal would include a total disturbance of 24.78 hectares. The proposal will result in reduction of... Read more...

Silicon Project, Kemerton and Mine at Moora - Revised Proposal

Last updated: August 9, 2021

The original proposal is for mining of silica (quartzite) rock approximately 15 kilometres north of Moora on Mining Lease M70/191, and smelting to produce silicon, employing wood, charcoal, coal and the silica mined at Moora, in the Kemerton Industrial Area approximately 20 kilometres north of Bunbury in the Shire of Harvey. This revised proposal is for an increase from the approved three submerged electric arc furnaces to four submerged electric arc furnaces at the Kemerton site, and the... Read more...

Industrial Infrastructure and Harbour Development, Jervoise Bay

Last updated: May 25, 2021

The proposal is to construct industrial infrastructure and a Southern Harbour in Jervoise Bay south of the Northern Harbour precinct and including the Marine support facility. Read more...

Munglinup Graphite Project

Last updated: May 10, 2021

The Munglinup Graphite Project is located in the South Coast region of Western Australia, approximately 105km west of Esperance, 85km east of Ravensthorpe and 4km north on Munglinup. MRC Graphite Pty Ltd propose to extract graphite from up to six open pits. The proposal will also include a processing plant, tailings storage facility, waste rock landforms, and associated infrastructure. The proposal would include a total disturbance of 350 hectares. Read more...

Cardup Brickworks Redevelopment

Last updated: November 30, 2020

Austral Bricks is proposing the redevelopment of the Cardup Brickworks, which includes the expansion of the existing factory, increasing the design capacity from 200,000 to 250,000 tonnes per annum. The site is located in the southern extremity of Byford. Additional ancillary improvements include the installation of a new baghouse scrubber and a new primary crusher located in the floor of the pit. The proposal would include: Expanding the capacity from 200,000 to 250,000 tonnes per annum; New... Read more...

Asian Renewable Energy Hub Revised Proposal

Last updated: November 9, 2020

NW Interconnected Power Pty Ltd (the Proponent) is seeking to revise its approved proposal to develop the Asian Renewable Energy Hub.  The proposal was previously referred under section 38 of the Environmental Protection Act 1986 (EP Act), assessed by the Environmental Protection Authority (EPA) at the level of Public Environmental Review (PER) (NW Interconnected Power 2019), and subsequently approved by the Western Australian Minister for Environment in October 2020.   This referral is for ... Read more...

Sodium Cyanide Plants (Liquid and Solid) at Kwinana and Transport of Sodium Cyanide by Road and Rail from Kwinana (S46) [2247]

Last updated: May 18, 2020

Changes to condition 2 (Proponent Commitments), condition 4 (Compliance Audit and Performance Review), condition 5 (Decommissioning Plan), condition 6, (Review of Options for the Transport of Solid Sodium Cyanide), condition 7 (Transport of Solid Sodium Cyanide), condition 8 (Transport of Liquid Sodium Cyanide), condition 9 (Noise Management), condition 10 (Emissions Verification) and condition 11 (Cyanide Monitoring). Read more...

Hazelmere Resource Recovery Park Community Recycling Centre and Waste Transfer Station

Last updated: April 14, 2020

Eastern Metropolitan Regional Council propose to construct and operate a Community Recycling Centre (CRC) and Waste Transfer Station (WTS) within the existing Hazelmere Resource Recovery Park, at Lots 814, 100 and 301 Lakes Road Hazelmere, in the City of Swan. The CRC would be accepting a range of materials for reuse, recycling and disposal from community members, while the WTS would provide for the short-term storage capacity for consolidation of various waste streams including refuse and food... Read more...

Technical Ammonium Nitrate Production Facility, Burrup Peninsula, Shire of Roebourne, Ministerial Statement 870 (s. 46) [2166]

Last updated: September 18, 2019

Inquire into and report on the matter of changing implementation condition 5-1: Air Quality in Ministerial Statement 870 for the above proposal to protect rock art. Read more...

Pages

  • 1
  • 2
  • 3
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.