Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Land use (7) Apply Land use filter
  • Industrial (5) Apply Industrial filter
  • Infrastructure (5) Apply Infrastructure filter
  • Nickel (2) Apply Nickel filter
  • Oil and gas (2) Apply Oil and gas filter
  • Diamonds (1) Apply Diamonds filter
  • Gold (1) Apply Gold filter
  • Iron Ore (1) Apply Iron Ore filter
  • Mineral sands (1) Apply Mineral sands filter
  • Salt (1) Apply Salt filter
  • Sand, rock, gravel and clay (1) Apply Sand, rock, gravel and clay filter
  • Waste management (1) Apply Waste management filter

Filter by current status:

  • (-) Remove Ministerial Statement published filter Ministerial Statement published

Filter by relevant environmental factors:

  • Hydrological Processes (1) Apply Hydrological Processes filter
  • Inland Waters Environmental Quality (1) Apply Inland Waters Environmental Quality filter
  • Terrestrial Fauna (1) Apply Terrestrial Fauna filter

Filter by Proponent:

  • Water Authority of Western Australia (3) Apply Water Authority of Western Australia filter
  • Dominion Mining Limited (2) Apply Dominion Mining Limited filter
  • State Energy Commission of Western Australia (2) Apply State Energy Commission of Western Australia filter
  • Alcoa of Australia Ltd (1) Apply Alcoa of Australia Ltd filter
  • Cable Sands (WA) Pty Ltd (1) Apply Cable Sands (WA) Pty Ltd filter
  • City of Wanneroo (1) Apply City of Wanneroo filter
  • D'Orsogna Bros Pty Ltd (1) Apply D'Orsogna Bros Pty Ltd filter
  • Dampier Salt (Operations) Pty Ltd (1) Apply Dampier Salt (Operations) Pty Ltd filter
  • Doral Resources NL (1) Apply Doral Resources NL filter
  • Du Pont (Australia) Pty Ltd (1) Apply Du Pont (Australia) Pty Ltd filter
  • Glen Retreat (1) Apply Glen Retreat filter
  • Health Department (1) Apply Health Department filter
  • HIsmelt Corporation Pty Ltd (1) Apply HIsmelt Corporation Pty Ltd filter
  • ICI Australia Operations Pty Ltd (1) Apply ICI Australia Operations Pty Ltd filter
  • Interstruct Pty Ltd. Naturaliste Development Pty Ltd (1) Apply Interstruct Pty Ltd. Naturaliste Development Pty Ltd filter
  • LandCorp (1) Apply LandCorp filter
  • Liquid Air Pty Ltd (1) Apply Liquid Air Pty Ltd filter
  • Magic Soil Pty Ltd (1) Apply Magic Soil Pty Ltd filter
  • Main Roads Department (1) Apply Main Roads Department filter
  • Poseidon Bow River Diamond Mine Limited (1) Apply Poseidon Bow River Diamond Mine Limited filter
  • Southern Plantations Chip Company Pty Ltd (1) Apply Southern Plantations Chip Company Pty Ltd filter
  • WA Refiners Pty Ltd (1) Apply WA Refiners Pty Ltd filter
  • Worsley Alumina Pty Ltd (1) Apply Worsley Alumina Pty Ltd filter

Filter by region:

  • Perth (17) Apply Perth filter
  • Goldfields Esperance (2) Apply Goldfields Esperance filter
  • Peel (2) Apply Peel filter
  • Pilbara (2) Apply Pilbara filter
  • South West (2) Apply South West filter
  • Great Southern (1) Apply Great Southern filter
  • Kimberley (1) Apply Kimberley filter
  • Wheatbelt (1) Apply Wheatbelt filter

Filter by last updated:

  • (-) Remove 1990 filter 1990
  1. Home
  2. Proposal search
  3. Ministerial Statement published
  4. 1990

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Yakkabindie Nickel Project - Change of Condition due to modification to Location of Factory (s46)

Last updated: December 13, 1990

Dominion Mining Limited submitted a Consultative Environmental Review for the Yakabindie Nickle Project to the Environmental Protection Authority in April 1990 (EPA Bulletin 444). Following assessement of the CER by the EPA, the Minister for the Environment issued a statement "that the proposal may be implemented" on the 29th November 1990 ( Ministerial Statement 117 ). Further studies carried out by the proponent on the location of facilities at the site have resulted in... Read more...

Yakabindie Nickel Project

Last updated: December 4, 1990

The proposed Yakabindie minesite is located within the lease area of the Yakabindie Pastoral Station approximately 5 kilometres east of the main Leinster to Wiluna road. An open cut mine is proposed to be developed at the site to produce approximately 6 million tonnes of low grade nickel sulphide ore per annum and 25 million tonnes of waste rock per annum. Mining will be carried out using conventional large-capacity diesel powered earthmoving equipment such as excavators, haul trucks and... Read more...

Dampier solar salt field enhancement

Last updated: November 23, 1990

The proposal is to expand the capacity of the existing Dampier salt field from 2.5 million tonnes per annum to 4 million tonnes per annum. Expansion is planned in four stages, depending on market demand, commencing in 1990 through to about 1997. Expansion would occur within the existing salt field lease boundary which has been operating at Dampier since the late 1960s. The proposed expansion is based on recovering waste salt from the disused bitterns holding pond then utilising this previously... Read more...

Landfill for future widening of the Mitchell Freeway at Lake Monger

Last updated: November 8, 1990

The proposal is to place sand (surcharge) to a height of 4.5 metres along a 1.9 kilometre length of the Mitchell Freeway adjacent to Lake Monger. The sand is to be piled to consolidate peat and an old sanitary landfill site for works associated with the widening of the Mitchell Freeway and the provision of a median strip for the proposed Northern Suburbs Rail Link. Because of the presence of peat and sanitary landfill, the ground is relatively spongy and would create an unsuitable base for the... Read more...

Mining diatomaceous earth at Lake Gnangara, Wanneroo

Last updated: October 25, 1990

On 9 June, 1989, the Environmental Protection Authority received a referral from the Department of Mines of a mining lease application (MLA 70/473) by Magic Soil Ply Ltd. The mining lease application is to supersede a prospecting licence application (PLA 70/807) over the same area and is for a proposal to mine diatomaceous earth from the north·western corner of the lake bed. The referral was held pending clarification of the Government's Policy on Exploration and Mining in Conservation... Read more...

Poseidon Bow River Alluvial Diamond Mine Expansion, Kimberleys

Last updated: October 17, 1990

Poseidon Bow River Diamond Mine Limited (Poseidon) operates an alluvial diamond mine on part of Lissadell Station, which is at the southern end of Lake Argyle in the Kimberleys. The original mining proposal was for an area of about 500 hectares and operations have been progressing since 1988 under mining lease conditions. The original mining proposal was not assessed under Part IV of the, Environmental Protection Act 1986, , but environmental conditions were set under several Works Approvals... Read more...

Tubridgi gas field development

Last updated: October 8, 1990

The proposal is to develop the Tubridgi Gas Field to supply natural gas to the existing Dampier to Perth pipeline. This would require the establishment of processing facilities on site near Onslow and an 85 kilometre connecting pipe to join into the main line. The gas field is about 36 square kilometres in area and lies under Urala Station pastoral lease, about 25 km south-west of the town of Onslow. It is estimated that up to 30 terajoules of gas per day could be collected over a field life of... Read more...

Next Major Public Water Supply for Perth (post 1992)

Last updated: October 3, 1990

The Water Authority has stated that following the completion of the Pinjar groundwater development, a new major water supply source will be required by 1992. This reasoning is based on current and predicted water consumption demand even in view of the Water Authority's public water conservation programme. Because of the extent, magnitude and likely environmental implications of developing a new water supply source, the EPA required the Water Authority to prepare an ERMP for this project.... Read more...

Fuel unloading, storage and dispatching facility, Kwinana

Last updated: September 19, 1990

The proposal is to develop a fuel unloading, storage and dispatching facility at the corner of Barter and Leath roads, Kwinana. The elements of the proposal are: install a 450mm (18 inch) fuel import line from the Bulk Cargo Jetty to the site construct refined oil tanks (two of 11,000 cubic metres for ULP and two of 3000 cubic metres for diesel) construct three small tanks for short term storage of each product install road tanker loading unit construct a small office and gate house Read more...

Hlsmelt Iron Ore Smelting Project at Kwinana

Last updated: September 19, 1990

The proposal is to establish a Research and Development Facility at Kwinana to prove the feasibility of a direct iron ore smelting process capable of producing commercially saleable iron product. The iron would ultimately be used as feed material for the production of steel products. Hlsmelt Corporation Pty Ltd is a joint venture between CRA Limited and the Midrex Corporation of USA, which has been formed to manage the project. The research facility will be constructed within the boundaries of... Read more...

Proposal for the export of woodchips through the Port of Bunbury: variation of McLean Consolidated Pty Ltd (1988) project

Last updated: September 17, 1990

An application by McLean Consolidated Pty Ltd to export hardwood woodchips derived from the sawmill wastes of the Denmark Sawmill through the Port of Albany was approved by the Minister for Environment in 1988. Since being granted that approval, several factors concerning the original proposal have altered, including change of ownership of both the project and the sawmill. The proponent, Southern Plantations Chip Company Pty Ltd, now wishes to export woodchips derived from sawmill wastes... Read more...

Simulated natural gas plant, Mandurah

Last updated: September 10, 1990

The proposal is to provide reticulated gas to the public in the Mandurah area using standard air/gas mixing and storage facilities at SECWA's site in Gordon Road, Mandurah. The plant will provide an initial gas reticulation system to allow a customer base to be established. Further planning is to provide a connection to the Perth-Bunbury natural gas pipeline when the customer base is large enough to warrant the capital investment. The plant is similar to one operating in Albany... Read more...

Ammonium nitrate importation through the Port of Esperance

Last updated: August 23, 1990

The proposal is to import a dense grade of ammonium nitrate (known as "NITRAM"') from the UK in quantities of 2,000 tonnes at a frequency of three times per year through the Port of Esperance. The product would be transported in 1 ton bulka bags. Two ships, each with 2,000 tonnes of NITRAM, have left their ports of loading already: one is delayed in Africa, the other is proceeding to Australia. The ammonium nitrate is needed to fill an Australia-wide shortfall. Esperance is the... Read more...

Land Use Development, Mundaring - Waste Management and Proposed Residential Development, Stoneville Road

Last updated: August 1, 1990

The land proposed for residential development comprises Pt Location 1699 owned by Glen Retreat having an area of approximately 46 ha. An area of 4 ha will be excluded and developed for the new Mundaring Primary School, while an equivalent area is to be excised from an adjoining reserve and added to the residential development. The land is located on the Darling Plateau in the catchment of Jane Brook and Bugle Tree Creek. The soils vary from sandy gravels in the lower areas to gravelly sand with... Read more...

Heavy Minerals Mine at Jangardup

Last updated: July 20, 1990

The proposal is to extract about 3.7 million tonnes of ore from about 30 hectares of land at Jangardup each year, to produce 271,000 tonnes of heavy mineral concentrate for trucking to Bunbury annually. The proposed mine life is eight years. Mining would be by a floating dredge feeding a wet separator. On average, some 56 truck trips (28 full, 28 return) per day would be required to transport the product to Bunbury. Read more...

Proposed Victoria-Bickley Redevelopment Scheme

Last updated: July 20, 1990

The proposal is to redevelop the existing Victoria Reservoir on Munday Brook, approximately 20 kilometres east of Perth. This is considered necessary by the Water Authority of Western Australia due to the age and condition of the existing dam, and timely in view of the current residential and rural development pressures being placed on the associated water catchments. Redevelopment of the Victoria Reservoir would involve the creation of a new larger dam to replace the existing structure to gain... Read more...

Proposed Beenyup wastewater ocean outlet duplication into Marmion Marine Park

Last updated: July 13, 1990

The proposal, by the Water Authority of Western Australia, consists of a preferred option of constructing a 1420 mm diameter pipeline from the Water Authority of Western Australia's property adjacent to the Ocean Reef Boat Harbour, out to sea for a distance of 1800 m. This proposal will increase the capacity to dispose of treated wastewater from the current level of 54 Megalitres per day (ML/day) to a maximum of 150 ML/day. The secondary treated effluent will be discharged into the ocean... Read more...

Boddington Gold Mine Project - Modification to processing and disposal of supergene and copper-rich basement ores (s46) [238B]

Last updated: June 8, 1990

Inquiry under s46 into amending the conditions of Ministerial Statement 85 . Worsley Alumina Pty Ltd submitted a Notice of Intent for the mining and processing of supergene and basement ores at the Boddington Gold Mine in July 1989. Following assessment of the Notice of Intent by the Environmental Protection Authority, the Minister for the Environment issued a statement "that the proposal may be implemented" on 22 November 1989 (Ministerial Statement 85). Further metallurgical... Read more...

Proposed Transmission Line Corridor Northern Terminal Substation to Pinjar Gas Turbine Power Station

Last updated: April 30, 1990

The proposal is to construct a power transmission line, with an associated corridor, between the existing Northern Terminal substation and a gas turbine power station at Pinjar which is presently under construction. Read more...

Solid Sodium Cyanide Plant Kwinana

Last updated: April 26, 1990

The proposal is to construct and operate a sodium cyanide plant at Kwinana. The plant would have the capacity to produce 45,000 tonnes of solid sodium cyanide briquettes annually. Sodium cyanide is predominantly used as a leaching agent in the gold extraction process. All solid sodium cyanide currently used in Australia is imported. Read more...

Pages

  • 1
  • 2
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.