ProjectProponent: State Energy Commission of Western AustraliaProposal description: The proposal is to construct a power transmission line, with an associated corridor, between the existing Northern Terminal substation and a gas turbine power station at Pinjar which is presently under construction. Assessment Number: 214Region: PerthReferred under EP Act: s38Industry sector: InfrastructureLast updated: April 30, 1990Current Status: Ministerial Statement published 2. Decision on whether to assess this proposalChair's Determination: Assess - Public Environmental ReviewDate published: Friday, 3 February, 1989 3. AssessmentScopingApproved: Sunday, 5 February, 1989 Environmental ReviewPublic submissions: Friday, 3 March, 1989 to Friday, 28 April, 1989Environmental Review documentation: PER document (PDF, 1.73 MB) Appendices to the PER (PDF, 15.96 MB) 4. EPA Report on assessmentEPA Report Number: 420EPA Report: Proposed Transmission Line Corridor Northern Terminal Substation to Pinjar Gas Turbine Power Station (PDF, 1.21 MB)Date published: Monday, 18 December, 1989 5. Decision on proposal and implementation of proposalMinisterial StatementDate of approval: Monday, 30 April, 1990Ministerial Statement: Ministerial Statement 98 (PDF, 163.05 KB)