Project Proponent Water Authority of Western Australia Proposal description The proposal is to redevelop the existing Victoria Reservoir on Munday Brook, approximately 20 kilometres east of Perth. This is considered necessary by the Water Authority of Western Australia due to the age and condition of the existing dam, and timely in view of the current residential and rural development pressures being placed on the associated water catchments. Redevelopment of the Victoria Reservoir would involve the creation of a new larger dam to replace the existing structure to gain additional water yield. Associated with this is the development of a pumpback water supply on the existing Bickley Brook Dam, using additional capacity available in the new Victoria Reservoir to store the winter flows from the lower Bickley catchment. The land included within the Victoria catchment area proposed to be flooded by the creation of the new dam is gazetted for water catchment. Assessment Number 203 Region Perth Referred under EP Act s38 Industry sector Infrastructure Last updated July 20, 1990 Current Status Ministerial Statement published 2. Decision on whether to assess this proposal Chair's Determination Assess - Public Environmental Review Date published Friday, 11 November, 1988 3. Assessment Scoping Approved Thursday, 10 November, 1988 Environmental Review Environmental Review documentation Consultative Environmental Review (PDF, 7.55 MB) 4. EPA Report on assessment EPA Report Number 418 EPA Report Proposed Victoria-Bickley Redevelopment Scheme (PDF, 661.58 KB) Date published Thursday, 1 February, 1990 5. Decision on proposal and implementation of proposal Ministerial Statement Date of approval Friday, 20 July, 1990 Ministerial Statement Ministerial Statement 102 (PDF, 116.15 KB)