Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Infrastructure (13) Apply Infrastructure filter
  • Industrial (4) Apply Industrial filter
  • Utilities (3) Apply Utilities filter
  • Aquaculture (2) Apply Aquaculture filter
  • Oil and gas (2) Apply Oil and gas filter
  • Power generation (2) Apply Power generation filter
  • Iron Ore (1) Apply Iron Ore filter
  • Land use (1) Apply Land use filter
  • Salt (1) Apply Salt filter

Filter by current status:

  • (-) Remove Decision on whether to assess has been published filter Decision on whether to assess has been published

Filter by relevant environmental factors:

  • (-) Remove Marine Environmental Quality filter Marine Environmental Quality
  • Marine Fauna (23) Apply Marine Fauna filter
  • Benthic Communities and Habitats (22) Apply Benthic Communities and Habitats filter
  • Social Surroundings (15) Apply Social Surroundings filter
  • Flora and Vegetation (13) Apply Flora and Vegetation filter
  • Terrestrial Fauna (11) Apply Terrestrial Fauna filter
  • Coastal Processes (8) Apply Coastal Processes filter
  • Inland Waters (6) Apply Inland Waters filter
  • 37 (5) Apply 37 filter
  • 3144 (3) Apply 3144 filter
  • Terrestrial Environmental Quality (3) Apply Terrestrial Environmental Quality filter
  • Subterranean Fauna (2) Apply Subterranean Fauna filter
  • Hydrological Processes (1) Apply Hydrological Processes filter
  • Inland Waters Environmental Quality (1) Apply Inland Waters Environmental Quality filter

Filter by Proponent:

  • Department of Transport (5) Apply Department of Transport filter
  • Department of Defence (2) Apply Department of Defence filter
  • API Management Pty Ltd (1) Apply API Management Pty Ltd filter
  • Australian Gold Reagents Pty Ltd (1) Apply Australian Gold Reagents Pty Ltd filter
  • Carnegie Wave Energy Ltd (1) Apply Carnegie Wave Energy Ltd filter
  • Chevron Australia Pty Ltd (1) Apply Chevron Australia Pty Ltd filter
  • Colonial Marine Consultants Pty Ltd (1) Apply Colonial Marine Consultants Pty Ltd filter
  • Grange Resources Limited (1) Apply Grange Resources Limited filter
  • Hamersley Iron Pty Limited (1) Apply Hamersley Iron Pty Limited filter
  • Harvest Road Export Pty Ltd (1) Apply Harvest Road Export Pty Ltd filter
  • Kimberley Marine Support Base Pty Ltd (1) Apply Kimberley Marine Support Base Pty Ltd filter
  • Kimberley Ports Authority (1) Apply Kimberley Ports Authority filter
  • Main Roads Western Australia (1) Apply Main Roads Western Australia filter
  • Mardie Minerals Pty Ltd (1) Apply Mardie Minerals Pty Ltd filter
  • Minister for State Development (1) Apply Minister for State Development filter
  • NW Interconnected Power Pty Ltd (1) Apply NW Interconnected Power Pty Ltd filter
  • Point Grey Development Company Pty Ltd (1) Apply Point Grey Development Company Pty Ltd filter
  • Province Resources Limited (1) Apply Province Resources Limited filter
  • Rottnest Island Authority (1) Apply Rottnest Island Authority filter
  • Shire of Ashburton (1) Apply Shire of Ashburton filter
  • Sino Iron Pty Ltd and Korean Steel Pty Ltd (1) Apply Sino Iron Pty Ltd and Korean Steel Pty Ltd filter
  • Water Corporation (1) Apply Water Corporation filter
  • Wesfarmers Chemicals Energy & Fertilisers Limited (1) Apply Wesfarmers Chemicals Energy & Fertilisers Limited filter
  • Woodside Energy Technologies Pty Ltd (1) Apply Woodside Energy Technologies Pty Ltd filter

Filter by region:

  • Pilbara (11) Apply Pilbara filter
  • Perth (9) Apply Perth filter
  • Gascoyne (3) Apply Gascoyne filter
  • Kimberley (3) Apply Kimberley filter
  • South West (2) Apply South West filter
  • Mid West (1) Apply Mid West filter
  • Peel (1) Apply Peel filter

Filter by last updated:

  • 2025 (4) Apply 2025 filter
  • 2024 (2) Apply 2024 filter
  • 2023 (4) Apply 2023 filter
  • 2022 (1) Apply 2022 filter
  • 2021 (1) Apply 2021 filter
  • 2020 (6) Apply 2020 filter
  • 2019 (1) Apply 2019 filter
  • 2018 (5) Apply 2018 filter
  • 2017 (3) Apply 2017 filter
  • 2016 (1) Apply 2016 filter
  • 2014 (1) Apply 2014 filter
  • 2012 (1) Apply 2012 filter
  1. Home
  2. Proposal search
  3. Decision on whether to assess has been published
  4. Marine Environmental Quality

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Tantabiddi Boating Facility

Last updated: June 30, 2025

The Department of Transport is proposing to build a new boating facility about 300 metres south of Tantabiddi Creek, located in the Ningaloo Marine Park, the Jurabi Coastal Park and the Ningaloo Coast National and World Heritage Areas, near Exmouth. The proposed new facility would replace the existing boat ramp at Tantabiddi Creek, and involves: dredging of the harbour basin and entrance channel land reclamation and vegetation clearing construction of breakwaters, revetments, boat ramps,... Read more...

Optimised Mardie Project - Revised Proposal

Last updated: June 9, 2025

Mardie Minerals Pty Ltd has approval to develop a greenfields high quality salt and SoP project and associated export facility at Mardie, approximately 80 km south-west of Karratha, in the Pilbara region of WA. The project will produce a high purity salt product, Sulphate of Potash (SoP) and other products that can be derived from sea water. The revised proposal includes the offshore disposal of dredge spoil within a dredge material placement area (DMPA), upgrading the existing airstrip and... Read more...

Rottnest Island Worker Accommodation

Last updated: May 19, 2025

The Rottnest Island Authority (RIA) propose to develop workers accommodation to support island businesses, enhance visitor experience and meet growing tourism needs for Wadjemup / Rottnest Island. The proposal is for 149 accommodation units for up to 336 people. The worker accommodation will be available specific workers who are required to reside on Rottnest Island for the purpose of delivering essential services to visitors and ensuring continued operations of the island. The proposal area is... Read more...

Onslow Recreational Jetty

Last updated: February 3, 2025

The proposal is for the construction and operation of a recreational jetty at Beadon Point, Onslow, Western Australia. The Proposal will provide a pedestrian jetty alongside the ruins of the historic Onslow Jetty for tourism and fishing. The jetty will not be designed to accommodate vehicles or vessels and will be for pedestrians only. Some land clearing will be required to allow an access track and a boardwalk access path to the jetty. Read more...

Casuarina Boat Harbour

Last updated: July 23, 2024

This document has been prepared for the first future derived proposal of the Koombana Bay Marine Structures Strategic Proposal (Assessment Number 2049 and Ministerial Statement 1226), namely the Casuarina Boat Harbour (Figure 1 Proposal Content Document). This document supports the Department of Transport’s (DoT’s) request to the Environmental Protection Authority (EPA) under section 38E of the Environmental Protection Act 1986 (EP Act) that the referred Casuarina Boat Harbour (CBH) future... Read more...

HyEnergy® Green Hydrogen and Ammonia Project

Last updated: February 5, 2024

Province Resources Ltd propose to use combined onshore wind and solar energy to produce green hydrogen and ammonia for export to the green energy market. The proposal is distributed across 3 distinct locations within the Shire of Carnarvon, Western Australia. The proposal will comprise the following major elements: • up to 945 ha (6.8 GW) of wind turbines and up to 10,000 ha of solar arrays (5.2 GW) • a new multiuser port facility with a material offloading facility and export terminal •... Read more...

Gorgon Gas Development Revised and Expanded Proposal: Barrow Island Nature Reserve (S46) [2368]

Last updated: June 26, 2023

Inquiry into implementation Condition 10 (Terrestrial and Marine Quarantine Management System), Condition 16 (Long-term Marine Turtle Management Plan) and Condition 25 (Coastal Stability Management and Monitoring Plan) to ensure that they are effective and reflect a contemporary outcome-based condition setting. It is noted a preceding Section 46 inquiry into Ministerial 800 (dated 11-03-2023) has been requested by the Minister for Environment in relation to Conditions 9, and 15 (Inquiry 1).... Read more...

H2Perth

Last updated: June 19, 2023

Woodside Energy Technologies Pty Ltd propose to construct and operate H2Perth, a domestic and export scale hydrogen and ammonia production facility, located approximately 40 km south of Perth. The proposal is to be located primarily within the Rockingham Industrial Zone (RIZ) in the City of Rockingham, with elements also located within the City of Kwinana and on the multi-user Kwinana Bulk Jetty. The proposal would produce approximately 3250 megawatts of gaseous hydrogen and approximately 3.25... Read more...

Oakajee Deepwater Port, Oakajee, Shire of Chapman Valley (S46) [2364]

Last updated: May 29, 2023

Time limit for substantial commencement, review of the adequacy of existing implementation conditions to ensure consistency with the EPA’s current objectives for each environmental factor. Read more...

Dampier Seawater Desalination Plant (DSDP)

Last updated: April 11, 2023

The proponent (Hamersley Iron Pty Limited) proposes to build and develop a desalination plant at Parker Point, Dampier, located approximately 2.5km north-east of the Dampier township. This Proposal will establish a reliable potable water supply for the Proponent’s Dampier port operation (including Parker Point and East Intercourse Island), Dampier town and connection into Water Corporation’s West Pilbara Water Supply Scheme (WPWSS). The desalination plant may be delivered in stages up to a... Read more...

Sino Iron Mine Continuation

Last updated: March 21, 2022

The Proposal is located in the Pilbara region of Western Australia. CITIC Pacific Mining Pty Ltd on behalf of Sino Iron Pty Ltd and Korean Steel Pty Ltd is proposing to increase the rate of groundwater abstraction from the mine pits and discharge to the lower Fortescue River and estuary from 12 to 21 GLpa, which is an increase of 9 GLpa. The proposal is located within an area of existing pastoral, mining, and recreational use. The maximum rate of discharge will remain the same (667L/sec). The... Read more...

Swan River Crossings

Last updated: October 25, 2021

Main Roads Western Australia (Main Roads) is proposing to build the Swan River Crossings (the Proposal) that includes the construction of new road and rail bridges, the upgrading of the existing rail bridge and the demolition of the existing Fremantle Traffic Bridge in Fremantle, Western Australia. The proposals location includes the Road and rail corridor along Queen Victoria Street, Fremantle from Tydeman Road in the north to Canning Highway south of the Swan River. And the eastern side of... Read more...

Asian Renewable Energy Hub Revised Proposal

Last updated: November 9, 2020

NW Interconnected Power Pty Ltd (the Proponent) is seeking to revise its approved proposal to develop the Asian Renewable Energy Hub.  The proposal was previously referred under section 38 of the Environmental Protection Act 1986 (EP Act), assessed by the Environmental Protection Authority (EPA) at the level of Public Environmental Review (PER) (NW Interconnected Power 2019), and subsequently approved by the Western Australian Minister for Environment in October 2020.   This referral is for ... Read more...

Derby Barge Facility

Last updated: October 5, 2020

CMC proposes to construct and operate a barge loading/unloading facility (Derby barge facility) within the Port of Derby, immediately to the north of the existing Derby jetty.   The proposal would require a total disturbance of 3.5 hectares(ha), which includes 1.66 ha of land reclamation and 1.84 ha harbour basin and dredging to a depth of -1.0 metre Australian Height Datum (AHD).  The proposed facility would include a purpose-built barge loading/unloading facility, associated servicing (... Read more...

Kimberley Marine Offloading Facility

Last updated: July 24, 2020

Kimberley Marine Support Base Pty Ltd (KMSB) are proposing to develop the Kimberley Marine Offloading Facility at the Port of Broome, approximately 200 metres south of the existing Broome Wharf. The proposal includes construction and operation of a deep-water floating wharf, along with associated onshore hardstand and terminal facilities suitable for container and general cargo stevedoring for coastal trading vessels, berthing and mooring for Cruise vessels and Roll on/Roll off ships.... Read more...

Underwater Training Range

Last updated: July 13, 2020

The Commonwealth Department of Defence proposes to establish two underwater training ranges (UTR) to facilitate ongoing training of Defence personnel in underwater demolition operations. The key activity during training is the detonation of small volumes (up to 5 kilograms) of explosives. The location of the two proposed UTRs are in Western Australian State waters, currently used as military training exercise areas. One proposed UTR is adjacent to Campbell Barracks, approximately 10km west of... Read more...

Sodium Cyanide Plants (Liquid and Solid) at Kwinana and Transport of Sodium Cyanide by Road and Rail from Kwinana (S46) [2247]

Last updated: May 18, 2020

Changes to condition 2 (Proponent Commitments), condition 4 (Compliance Audit and Performance Review), condition 5 (Decommissioning Plan), condition 6, (Review of Options for the Transport of Solid Sodium Cyanide), condition 7 (Transport of Solid Sodium Cyanide), condition 8 (Transport of Liquid Sodium Cyanide), condition 9 (Noise Management), condition 10 (Emissions Verification) and condition 11 (Cyanide Monitoring). Read more...

Port Hedland Spoilbank Marina

Last updated: April 20, 2020

The Department of Transport is proposing to construct and operate the Port Hedland Spoilbank Marina Proposal, including marine and land-based components within the Town of Port Hedland, Pilbara, WA. The Proposal includes: marina basin, mooring facilities (up to 80 pens), boat launching area, sand trap and entrance channel capital dredging works resulting in up to 900,000 cubic metres (m3) of dredge spoil and dredged to a maximum depth of -2m chart datum (-6m AHD). Dredge spoil will be used... Read more...

Perth Seawater Desalination Plant 2

Last updated: November 25, 2019

The Western Australian Water Corporation is proposing to construct the Perth Seawater Desalination Plant 2 (PSDP 2) as part of Perth’s Integrated Water Supply Scheme which aims to provide additional sources of drinking water to supplement the existing metropolitan water supply. The PSDP2 Proposal will be located within the Kwinana Industrial Area, approximately 38 km south of the Perth Metropolitan Area, on Lot 1864, Riseley Road in Naval Base. PSDP2 will be developed in two stages (each with a... Read more...

Downstream Processing Chemical Production Facility

Last updated: December 3, 2018

Wesfarmers Chemicals, Energy & Fertilisers Limited  proposes  to construct and operate a methanol plant with a production capacity of approximately 5,000 tonnes per day ( tpd ) on Site E within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula.     The proposal is adjacent to the  Murujuga  National Park.      The proposal would  result in the  disturbance of  approximately  75 hectares within Site E.     Read more...

Pages

  • 1
  • 2
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.