This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: February 23, 2024
The Proposal is located 210 km south of Port Hedland and 180 km north west of Newman in the Pilbara region of Western Australia. The proposal is located within a 40,653 ha Development Envelope and will require clearing of no more than 9,628 ha of native vegetation. The proposal includes, but is not limited to, the following: - The development of a series of above and below water table mine pits; - Ore processing facility; - Groundwater abstraction for water supply (for the mine and all... Read more...Last updated: February 13, 2024
The Pilbara Infrastructure Pty Ltd., a subsidiary of Fortescue Metals Group, proposes to construct and operate a railway of 106 kilometres (km) and associated infrastructure. The East Hamersley Railway Project includes communications and signalling infrastructure, an ore loading facility, groundwater abstraction and discharge, borrow pits and quarries, culverts, bridges, diversion drains, pump station, construction camp, landfills and wastewater treatment plants, and other supporting... Read more...Last updated: February 13, 2024
Chichester Metals Pty Ltd, a subsidiary of Fortescue Metals Group, proposes to develop and operate an iron ore mine approximately 80 kilometres north-west of Newman. The Nyidinghu Iron Ore Mine proposal includes mine pits above and below the water table, an on-site ore processing from various sources, waste rock and tailings storage, an aerodrome, groundwater abstraction, surplus water management including aquifer recharge and other supporting infrastructure. The proposal has a development... Read more...Last updated: February 7, 2024
The Proposal is for the development of the Rhodes Ridge Iron Ore Project (the Proposal), located approximately 40 kilometres north-west of Newman, in the Shire of East Pilbara. The Proposal requires a disturbance footprint of up to 14,850 hectares within a 61,301 hectares Development Envelope. The Proposal includes the development of new above and below water table deposits, and associated activities. The proposal includes but is not limited to: development of new deposits including above and... Read more...Last updated: December 22, 2023
Rio Tinto Winu Pty Limited (the Proponent) proposes to develop the Winu Project (the Proposal). The Proposal is a new copper-gold mine located approximately 300 km south of Broome and 320 km east of Port Hedland in the northern Pilbara region of Western Australia within both the Nyangumarta people’s and the Martu people’s Native Title Determination Areas. The Proposal conceptual footprint will require the clearing of up to 4,868 ha of native vegetation within a proposed 37,344 ha Development... Read more...Last updated: June 21, 2023
Leichhardt Industrials Pty Ltd propose to develop the Eramurra Solar Salt project approximately 55 km west-south-west of Karratha in the Pilbara region of Western Australia. The proposal includes the development of a series of concentrator and crystalliser ponds and a processing plant. Supporting infrastructure includes seawater intake, bitterns outfall, desalination plant and groundwater bores, power supply and other infrastructure. Export of product would be via a previously approved trestle... Read more...Last updated: June 7, 2023
The Ridley Magnetite Project (the Proposal) is located approximately 57 km east of Port Hedland. The proposal is located within a 14,181 ha Development Envelope with an indicative disturbance footprint of 7,406 ha. The proposal is for the mining and processing of iron ore to produce 3 Million tonnes per annum (Mtpa) of magnetite concentrate for export under Stage 1, with an increase to 16.5 Mtpa under Stage 2. The proposal includes a single pit (below water table), run-of-mine pad, concentrate... Read more...Last updated: September 14, 2021
Hastings Technology Metals Ltd propose to expand the existing approved Yangibana Rare Earths Project, a Rare Earth Elements mine which includes on site processing and associated infrastructure. The expansion involves mining from two additional pits (Yangibana and Auer) and one larger amalgamated pit (Bald Hill-Simon’s Find-Fraser’s). The proposal is located approximately 270 kilometres east-north-east of Carnarvon in the Shire of Upper Gascoyne. The proposal would include total disturbance of... Read more...Last updated: August 9, 2021
Leichhardt Industrials Pty Ltd (Leichhardt) is seeking to develop a salt production and export operation in the Cape Preston East area, approximately 55 kilometres (km) westsouth-west of Karratha in Western Australia (WA). The proposal will utilise seawater and evaporation to produce concentrated salt products for export. The proposal includes the development of a series of concentrator and crystalliser ponds, processing plant, product pipeline and offshore export facility (offshore pylon wharf... Read more...Last updated: July 1, 2019
The construction of facilities for the development of the Pluto Gas Field on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on the Burrup Peninsula. Extensive dredging will be undertaken adjacent to the export facility. Read more...Last updated: July 25, 2018
Pardoo Beef Corporation Pty Ltd proposes to develop a centre-pivot irrigated feed crop production facility. Centre-pivot irrigation is a method of crop irrigation in which equipment rotates around a pivot and crops are watered with sprinklers. The proposal is approximately 100km east-northeast of Port Hedland and 365km south west of Broome. The proposal is for stage 3 and would include a total disturbance of 368 hectares development envelope. Read more...Last updated: December 14, 2015
The Utah Point Berth Project consists of two separate stages: Stage A: Dredging and Reclamation; and Stage B: Construction and Operation. Stage A, dredging and reclamation works for the UPBP was approved by the Minister for Environment as an amendment to the existing Fortescue Metals Group (FMG) approval and managed according to the approved conditions. The works for Stage A have been successfully completed. The EPA determined that Stage B, the construction and ongoing operation of stockyard... Read more...Last updated: January 16, 2014
The proposal is for the development of an iron ore mine at deposits 'A' and 'B' and ore processing operation at West Angelas 130 kilometres west of Newman, and construction of a rail line and expansion of port facilities at Cape Lambert. Read more...Last updated: January 30, 2013
The proposal is to construct and operate a multi-user deep-water port with iron ore stockpiling, transfer and ship loading facilities and ancillary infrastructure at Anketell Point. The proposal allows for facilities required by the Proponent and future third parties to be developed. Read more...Last updated: October 12, 2005
The proposal is to construct an ammonia–urea plant on the Burrup Peninsula. The plant will have a production capacity of 2300 tonnes/day (t/d) of ammonia and 3500 t/d of urea. The plant and associated infrastructure will be composed of: a natural gas supply pipeline from the North West Shelf Liquefied Natural Gas (LNG) Plant (to be located in a multi-user service corridor); ammonia plant; urea plant; fluid bed granulation plant; seawater desalination, treatment and storage; internal power... Read more...Last updated: September 5, 1995
The proposal is to build and operate a Hot Briquetted Iron (HBI) plant of nominal capacity of 2 Mtpa, approximately 7.5 km south-west of Port Hedland. The plant will produce a nominal 2 Mtpa of iron briquettes, which can be used as a feedstock for electric arc furnaces in the steel making process. Read more...