This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: June 20, 2022
The proposal is to develop a silver, lead and zinc mine, associated infrastructure and processing facilities approximately 50 kilometres north of Kununurra, with the concentrate produced transported by road and shipped through Wyndham Port. Read more...Last updated: June 14, 2022
The Proposal would include the following activities: shore crossing site preparation including installation of temporary facilities along the shoreline at the Pluto LNG Facility to facilitate the installation of the trunkline in shallower depths preparation works associated with the installation of the trunkline including dredging and associated spoil disposal at existing spoil grounds trunkline installation (about 32.7 kilometres long within State waters) shore crossing site reinstatement rock... Read more...Last updated: June 14, 2022
APA Northern Goldfields Interconnect Pty Ltd proposes to construct and operate the Northern Goldfields Interconnect Pipeline. The 300 mm diameter buried gas pipeline will extend for approximately 580 km, starting from Ambania (50 km east of Geraldton) to 40 km south of Leinster where it will connect into the existing Goldfields Gas Pipeline. The project will connect existing gas assets in the Mid West region with existing gas assets in the Northern Goldfields region. The proposal includes... Read more...Last updated: June 7, 2022
Alinta Energy Development Pty Ltd proposes to develop a 90 Mega Watts (MW) AC solar facility situated on Unallocated Crown Land near Alinta Energy’s existing Port Hedland Power Station located within the Boodarie Strategic Industrial Area. The proposal is located approximately 5 km south-west of South Hedland, adjacent to Great Northern Highway, within the Town of Port Hedland. The proposal consists of a 90 MW AC solar farm and a short (~2 km) transmission connection to the existing Port... Read more...Last updated: June 7, 2022
DevelopmentWA proposes to subdivide Lot 40 (No. 217) Devlin Road, Wellesley (Shire of Harvey) into approximately 34 lots to facilitate future industrial development. Areas of the Marriott Road reserve (Lots 41 & 42) are also proposed to be cleared to facilitate the safe movement of vehicles to and from the site and for upgrading of electrical services. The proposal would include a total development envelope of 119 hectares, including proposed clearing of up to 27.1 hectares of native... Read more...Last updated: May 31, 2022
Gascoyne Gateway Ltd proposes to construct and operate a multi-use single jetty and associated shore-based activities approximately 10 kilometres south of Exmouth on the western and eastern sides of Minilya-Exmouth Road. The development envelope is approximately 3.8 km 2 in size and includes a single access jetty, onshore strategic port land, renewables precinct, desalination infrastructure and fuel storage. Read more...Last updated: May 30, 2022
The requested change relates to condition 3 of Statement 1035 (as relevant to Statement 861) for an extension to the Time Limit for Proposal Implementation. Read more...Last updated: May 30, 2022
The Bellevue Gold Project is a historic gold mining operation located approximately 40 kilometres north of Leinster in the Northern Goldfields region. The proposal is for the recommencement of operations at the Bellevue Gold Project and involves extensions to existing mines and excavation of new open pits, associated mine dewatering, onsite processing and waste disposal. The proposal requires a disturbance of 363.2 hectares (ha) within a development envelope of 1,030 ha. The proposed life of... Read more...Last updated: May 30, 2022
The Proposal involves the development of a greenfields Sulphate of Potash fertiliser operation which is currently designed to operate for a 20-year period. The Proposal involves the on-lake development of trenches and solar evaporation ponds for brine extraction and Sulphate of Potash production. The off-lake development includes a processing plant, associated site infrastructure and access roads for trucking Sulphate of Potash product to Wyndham Port. A northern linear access corridor will... Read more...Last updated: May 26, 2022
FQM Australia Nickel Pty Ltd proposes to change and expand its Ravensthorpe Nickel Operations near Bandalup Hill currently approved under Ministerial Statement 633 as follows: Expand Hale-Bopp mining operations by approximately 29 hectares into the, Kunzea similis, ssp., mediterranea, Community Conservation Area. Revise the alignment of the infrastructure corridor between the Shoemaker-Levy ore body and the processing area. Incorporate neutralised tailings to the reject rocks used to backfill... Read more...Last updated: May 25, 2022
Harvey Water propose to construct and operate a pipeline and ocean outfall to dispose brine wastewater. The pipeline will be located between the Kemerton Strategic Industrial Area and the Indian Ocean south of Binningup in the Shire of Harvey. The pipeline will convey brine to a single outlet diffuser outfall. The outfall will be located approximately 400 m from the shoreline and will be installed under the seabed by horizontal directional drilling from the coast. The outlet pipe will protrude... Read more...Last updated: May 18, 2022
The proposal is to excavate and process gypsum ore and overburden from mining lease 70/1161. Inquiry under s46 to change the conditions of Ministerial Statement 730. Read more...Last updated: May 16, 2022
The Proposal will use combined onshore wind and solar energy of approximately 5.2 gigawatt (GW) capacity to produce green hydrogen which will be converted to an estimated 2 Million tonnes per annum (Mtpa) of green ammonia for export to emerging green energy markets. The Proposal is located within the Shire of Northampton, Western Australia (WA), approximately 20 km north of Kalbarri. The Proposal comprises the following major components: a wind and solar farm with a combined installed capacity... Read more...Last updated: May 16, 2022
Iluka proposes to develop the Tutunup Mineral Sands Project, located approximately 195 km south of Perth, and 17 km east of Busselton. The proposal involves mineral sands mining, including the development of mine pits, processing plant, dams for water and clay fines management, material stockpiles and associated supporting infrastructure. Up to 4.02 gigalitres of water would be required to support the proposal. Heay mineral concentrate would be transported for further processing at the Capel... Read more...Last updated: May 6, 2022
Bennett Resources is proposing to undertake an unconventional exploration drilling and hydraulic fracture stimulation program within Petroleum Exploration Permit EP 371 (EP 371) within the Shire of Derby, West Kimberley. The proposal area is located approximately 123 kilometres south east of the town of Derby. The proposal comprises the construction of up to twenty wells in a region of the Canning Basin that has been previously surveyed and explored for petroleum purposes. The proposal is... Read more...Last updated: April 13, 2022
Main Roads proposes to upgrade and widen a 2 km section of Tonkin Highway from four lanes to six lanes from approximately 1 km north of Kelvin Road extending south to Maddington Road. The Proposal will include construction of a grade separated interchange at Tonkin Highway and Kelvin Road and associated works such as PSP upgrade, installation of noise and retaining walls, drainage improvements and landscaping. Read more...Last updated: April 11, 2022
Change existing Condition 7 of Ministerial Statement 586 so that it is adequate with respect to avoiding, reducing, and offsetting greenhouse gas emissions. Read more...Last updated: April 5, 2022
Doyles Lime Service Pty Ltd proposes limestone and sand excavation approximately 4.5 km north of the Preston Beach townsite, Shire of Waroona. Read more...Last updated: March 28, 2022
The City of Fremantle and Fremantle Ports propose to undertake up to 150,000 cubic metres of maintenance and capital dredging from a portion of Fremantle Ports deep water entrance channel and nourish Port Beach with the dredged material. The proposal footprint is 60.27 hectares, located 1.6 kilometres from the Cottesloe Reef Fish Habitat Protection Area. The proposal could impact on the environmental factors of benthic communities and habitats, marine environmental quality, coastal processes... Read more...Last updated: March 21, 2022
The Proposal is located in the Pilbara region of Western Australia. CITIC Pacific Mining Pty Ltd on behalf of Sino Iron Pty Ltd and Korean Steel Pty Ltd is proposing to increase the rate of groundwater abstraction from the mine pits and discharge to the lower Fortescue River and estuary from 12 to 21 GLpa, which is an increase of 9 GLpa. The proposal is located within an area of existing pastoral, mining, and recreational use. The maximum rate of discharge will remain the same (667L/sec). The... Read more...