Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Infrastructure (4) Apply Infrastructure filter
  • Oil and gas (3) Apply Oil and gas filter
  • Utilities (3) Apply Utilities filter
  • Iron Ore (2) Apply Iron Ore filter
  • Power generation (2) Apply Power generation filter
  • Sand, rock, gravel and clay (2) Apply Sand, rock, gravel and clay filter
  • Clearing (1) Apply Clearing filter
  • Industrial (1) Apply Industrial filter
  • Land use (1) Apply Land use filter
  • Nickel (1) Apply Nickel filter
  • Waste management (1) Apply Waste management filter

Filter by current status:

  • (-) Remove Decision on whether to assess has been published filter Decision on whether to assess has been published

Filter by preliminary environmental factors:

  • Social Surroundings (6) Apply Social Surroundings filter
  • Terrestrial Fauna (5) Apply Terrestrial Fauna filter
  • Flora and Vegetation (4) Apply Flora and Vegetation filter
  • Marine Fauna (4) Apply Marine Fauna filter
  • Marine Environmental Quality (3) Apply Marine Environmental Quality filter
  • Benthic Communities and Habitats (2) Apply Benthic Communities and Habitats filter
  • Inland Waters (2) Apply Inland Waters filter
  • Inland Waters Environmental Quality (2) Apply Inland Waters Environmental Quality filter
  • Coastal Processes (1) Apply Coastal Processes filter
  • Terrestrial Environmental Quality (1) Apply Terrestrial Environmental Quality filter

Filter by Proponent:

  • Shire of Broome (3) Apply Shire of Broome filter
  • Buru Energy Limited (2) Apply Buru Energy Limited filter
  • Kimberley Ports Authority (2) Apply Kimberley Ports Authority filter
  • Pluton Resources Ltd (2) Apply Pluton Resources Ltd filter
  • Regional Power Corporation T/A Horizon Power (2) Apply Regional Power Corporation T/A Horizon Power filter
  • Boskalis Australia Pty Limited (1) Apply Boskalis Australia Pty Limited filter
  • Broome Port Authority (1) Apply Broome Port Authority filter
  • Colonial Marine Consultants Pty Ltd (1) Apply Colonial Marine Consultants Pty Ltd filter
  • JAB Industries (1) Apply JAB Industries filter
  • Kimberley Marine Support Base Pty Ltd (1) Apply Kimberley Marine Support Base Pty Ltd filter
  • Mungalalu Truscott Airbase Pty Ltd (1) Apply Mungalalu Truscott Airbase Pty Ltd filter
  • Napier Corporation Pty Ltd (1) Apply Napier Corporation Pty Ltd filter
  • Panoramic Resources Limited (1) Apply Panoramic Resources Limited filter
  • Woodside Energy (1) Apply Woodside Energy filter

Filter by region:

  • (-) Remove Kimberley filter Kimberley

Filter by last updated:

  • 2025 (3) Apply 2025 filter
  • 2024 (2) Apply 2024 filter
  • 2023 (2) Apply 2023 filter
  • 2020 (3) Apply 2020 filter
  • 2019 (1) Apply 2019 filter
  • 2018 (2) Apply 2018 filter
  • 2016 (1) Apply 2016 filter
  • 2015 (2) Apply 2015 filter
  • 2014 (1) Apply 2014 filter
  • 2012 (1) Apply 2012 filter
  • 2008 (1) Apply 2008 filter
  • 2007 (1) Apply 2007 filter
  1. Home
  2. Proposal search
  3. Decision on whether to assess has been published
  4. Kimberley

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Derby Future Energy System

Last updated: July 7, 2025

Horizon Power proposes to construct and operate the Derby Future Energy System (FES) for energy supply to the town of Derby within the Kimberley region of Western Australia. The proposal comprises ground-mounted solar photovoltaic (PV) system up to 21 megawatts (MW), battery energy storage systems (BESS) up to 10 MW, a new thermal power station up to 8 MW, and a transmission network connection route. The thermal power station will be installed adjacent to the existing power station on Broome... Read more...

Broome Future Energy System

Last updated: June 3, 2025

Horizon Power proposes to construct and operate the Broome Future Energy System (FES) for energy supply to the town of Broome within the Kimberley region of Western Australia. The proposal comprises ground-mounted solar photovoltaic (PV) system up to 90 megawatts (MW), battery energy storage systems (BESS) and a network connection route. The solar PV and BESS will be installed at a site approximately 10 km north of Broome. A network connection route will connect the solar PV and BESS to the... Read more...

Cambridge Gulf Marine Sand Proposal

Last updated: April 14, 2025

The proposal is to source marine sands from Cambridge Gulf, north of Wyndham in northeast Western Australia, for export to overseas construction projects. The proposal is a vessel-based marine operation with a lifespan of up to 15 years. It does not involve the construction and operation of any shore-based facilities. The operation will involve a Sand Production Vessel (SPV) based generally on the design of a large Trailer Suction Hopper Dredger (TSHD). The proposed operational area (POA) is... Read more...

Wharf Extension

Last updated: April 22, 2024

Kimberly Ports Authority (KPA) is proposing to undertake several improvements and modifications (works) to the wharf at the Port of Broome (the Port) to maximise wharf space and facilities while assisting with safe and efficient operations. The works include the construction of a new wharf laydown and new offices and amenities. The Port is located near Entrance Point at the tip of the Broome Peninsula, north-west of Roebuck Bay and approximately 5 kilometres (km) south-west of the town of... Read more...

Broome Regional Resource Recovery Park – Landfill Development

Last updated: January 29, 2024

The Shire of Broome propose to develop a Class III landfill, leachate management system and asbestos monocell at the Regional Resource Recovery Park (RRRP). The RRRP is located at Lot 550 on the Broome-Cape Leveque Rd, 12km northeast of the Broome town centre. Read more...

Napier Downs Irrigation Project

Last updated: November 6, 2023

Napier Corporation Pty Ltd (the proponent) is proposing to develop a pivot irrigation project to supply fodder crops for pastoral use. The proposal is situated within Napier Downs Pastoral lease (LPL N049855), located in the West Kimberley region, 240 km east northeast of Broome, Western Australia. The purpose of the proposal is the pivots will grow cattle fodder crops (Rhodes grass) for pastoral purposes use on Napier Downs Station, Mount-House Station and other Napier Corporation managed... Read more...

Rafael Seismic Survey

Last updated: February 23, 2023

Buru Energy Ltd propose to undertake a 2D an d 3D geological survey at one site (Rafael patch) in the west Kimberley district, approximately 80 kilometres south of Derby. The proposal would include total disturbance of up to 438 hectares by raised blade clearing of 1147 km of seismic lines and construction of a temporary workers camp within an existing cleared well site. Read more...

Derby Barge Facility

Last updated: October 5, 2020

CMC proposes to construct and operate a barge loading/unloading facility (Derby barge facility) within the Port of Derby, immediately to the north of the existing Derby jetty.   The proposal would require a total disturbance of 3.5 hectares(ha), which includes 1.66 ha of land reclamation and 1.84 ha harbour basin and dredging to a depth of -1.0 metre Australian Height Datum (AHD).  The proposed facility would include a purpose-built barge loading/unloading facility, associated servicing (... Read more...

West Bay Barge Landing Maintenance Dredging

Last updated: August 31, 2020

The West Bay Barge Landing has been in operation since 1944 and is located approximately 7 km east of the Mungalalu Truscott Airbase, in the Kimberley Region. The site is approximately 520 km west southwest of Darwin and 617 km northeast of Broome and is located on the Anjo Peninsula on the northern tip of Western Australia. The proponent, Mungalalu Truscott Airbase Pty Ltd, is proposing to dredge 22,000m 3 of the barge landing to restore safe navigable depths. Disposal of dredged material is... Read more...

Kimberley Marine Offloading Facility

Last updated: July 24, 2020

Kimberley Marine Support Base Pty Ltd (KMSB) are proposing to develop the Kimberley Marine Offloading Facility at the Port of Broome, approximately 200 metres south of the existing Broome Wharf. The proposal includes construction and operation of a deep-water floating wharf, along with associated onshore hardstand and terminal facilities suitable for container and general cargo stevedoring for coastal trading vessels, berthing and mooring for Cruise vessels and Roll on/Roll off ships.... Read more...

Broome Town Beach Groyne and Jetty Upgrade Project

Last updated: September 16, 2019

The Shire of Broome is proposing to undertake an upgrade of the Town Beach Jetty as part of a set of upgrades to Broome’s Town Beach, in the Kimberley region of Western Australia. The Broome Town Beach Groyne Upgrade and Jetty Project includes upgrades to the existing groyne and the construction of a new concrete jetty extending offshore from the groyne. Piling works associated with the construction for the new concrete jetty and fishing platform would be undertaken during daylight hours for 2... Read more...

Broome Town Beach Seawall

Last updated: May 28, 2018

The Shire of Broome is proposing to construct a revetment wall at Broome Town Beach to mitigate the extreme level erosion risk identified for the east side of the Town Beach foreshore reserve, Pioneer Cemetery and the Museum. The revetment wall extends along approximately 400 m of shoreline and includes associated footpaths, drainage and lighting. Read more...

Port of Broome Channel Optimisation Project

Last updated: May 14, 2018

Kimberley Ports Authority (KPA) is seeking to improve accessibility to the Port of Broome, situated in West Roebuck Bay, approximately 5 kilometres south west of the township of Broome. Larger vessels entering the Port, such as cruise ships, have limited access windows due to the large tidal range (10m), presence of channel rock and high spots (shoals) in the access channel. In recognition of the access constraints and the growing tourism industry in Broome, the Department of Primary Industries... Read more...

Various Commercial Purposes Developments - Lot 616, Lot 1221 and Port Drive Road Reserve, within Port of Broome

Last updated: December 8, 2016

The Broome Port Authority proposes to clear approximately 24.55 hectares (ha) of native vegetation within Lot 616, Lot 1221 and Port Drive road reserve, Broome, in order to establish a wash-down facility, supply bases to support exploration of the Browse Basin (drilling fluid facility) and ancillary small businesses. Read more...

Pivot Hill Mining Proposal 29311 (Revised) to recommence quarrying

Last updated: May 25, 2015

The proposal is to recommence quarrying at Pivot Hill (M80/618(P) & L80/63(P)). It involves the extraction of up to 45,000 tonnes per year of basalt for use as aggregates in civil works. This would require 4.4 hectares (ha) of clearing of native vegetation in addition to the existing 2.45 hectares of previously disturbed land, within a Mining Lease covering 45 ha. Crushing and screening of aggregates would be undertaken at the site. The proponent has proposed a duration of 10 years... Read more...

Torosa Subsea Development Proposal

Last updated: February 16, 2015

Woodside Energy Limited proposes to develop approximately 17 wells from three drill centres on the sea bed near Scott Reef. The proposal includes supporting subsea infrastructure, including wellheads, manifolds, flowlines and umbilicals. The drill centres and associated infrastructure are proposed to be located in water greater than 350 metres deep, with two of the drill centres between North and South Scott Reef and one north east of North Scott Reef. Scott Reef is located approximately 425... Read more...

Laurel Formation Tight Gas Pilot Exploration Program

Last updated: January 13, 2014

The Environmental Protection Authority has received a referral from Buru Energy Ltd for a proposal to carry out tight gas stimulation using hydraulic fracturing of four existing exploration wells in the Canning Basin area of Western Australia. The four wells to undergo hydraulic fracturing are Yulleroo 3, Yulleroo 4, Valhalla North 1 and Asgard 1. The proposal does not involve any clearing of vegetation as it is utilising existing wells approved by the Department of Mines and Petroleum. The... Read more...

Savannah Project Stage 2 - Tailings Storage Facility Amendment

Last updated: July 9, 2012

An embankment lift of a tailings storage facility and leaving the facility in situ. Read more...

Irvine Island Iron Ore Exploration Program - Phase Il

Last updated: December 3, 2008

Pluton proposes to undertake Phase II of a mineral exploration program on Irvine Island to refine the definition of the iron ore resource in the south-east part of the island and to undertake drilling for the purpose of environmental investigations. The Phase II exploration program will include: drilling 29 sites along the Hardstaff Peninsula using a diamond core rig drilling an additional 10 holes in the Isthmus region at existing Phase 1 work sites drilling for the purpose of environmental... Read more...

Irvine Island Iron Ore Exploration Program

Last updated: December 19, 2007

Pluton proposes to undertake a mineral exploration program on Irvine Island to determine the extent of iron mineralisation across the eastern edge of the island. Irvine Island is located within the Buccaneer Archipelago in the Kimberley region of Western Australia. The island is located approximately 140 km north of Derby and approximately 11 km from the mainland. The proposal comprises: Collecting (by hand or using hand-based machinery) approximately 800 surface samples across eastern Irvine... Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.