This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: June 7, 2023
The Ridley Magnetite Project (the Proposal) is located approximately 57 km east of Port Hedland. The proposal is located within a 14,181 ha Development Envelope with an indicative disturbance footprint of 7,406 ha. The proposal is for the mining and processing of iron ore to produce 3 Million tonnes per annum (Mtpa) of magnetite concentrate for export under Stage 1, with an increase to 16.5 Mtpa under Stage 2. The proposal includes a single pit (below water table), run-of-mine pad, concentrate... Read more...Last updated: May 29, 2023
FutureEnergy Australia is proposing to construct and operate a biorefinery processing plant to produce a renewable biodiesel. The proposed proposal is located on Lot 31 on Plan 404104, Narrogin, within the shire of Narrogin, Western Australia. The proposal includes a biorefinery plant, a feedstock receival area, woodchip drying beds, and supporting infrastructures. The biorefinery plant will utilize waste lignocellulose biomass as feedstock which will undergo pyrolysis followed by non-catalytic... Read more...Last updated: May 29, 2023
Time limit for substantial commencement, review of the adequacy of existing implementation conditions to ensure consistency with the EPA’s current objectives for each environmental factor. Read more...Last updated: May 15, 2023
The proposal is for extractive industry on Bussell Highway, Kudardup, in the Shire of Augusta Margaret River. The proposal is based on the Application for Development Approval, June 2020 (ADA) appended to the Shire of Augusta Margaret River’s Planning Approval / Consent No. P220293. The proponent has identified a reduced scope to only include extraction of sand from Cells 7, 8 and 9 (gravel extraction for cells 1,2,3,4,5 and 6 is excluded). All other activities within the ADA, including... Read more...Last updated: April 11, 2023
The proponent (Hamersley Iron Pty Limited) proposes to build and develop a desalination plant at Parker Point, Dampier, located approximately 2.5km north-east of the Dampier township. This Proposal will establish a reliable potable water supply for the Proponent’s Dampier port operation (including Parker Point and East Intercourse Island), Dampier town and connection into Water Corporation’s West Pilbara Water Supply Scheme (WPWSS). The desalination plant may be delivered in stages up to a... Read more...Last updated: March 27, 2023
Red Moon Property Holdings Pty Ltd and property lessee Altera Ltd propose to construct and operate Carpenter’s dam taking water from 4-mile brook. The proposal is to construct a dam not exceeding 3,400,000 cubic metres in capacity which includes an automatic bypass system that allows at least 8, 000 kilolitres of water to bypass the dam with excess water returned to the original watercourse. The proposal is in Beedelup, WA, approximately 20 kilometres Southwest of Manjimup, adjacent to the... Read more...Last updated: March 7, 2023
PSP Properties Pty Ltd propose to develop and operate a surf park at Lots 800 and Lot 9001 Prinsep Road, and Lot 801 Knock Way, Jandakot (City of Cockburn). The proposal includes development of an open water surfing lagoon, accommodation, food and beverage venues, function centre and events space, skating facilities, and health and wellness facilities. The proposal site is 5.78 hectares (ha) and is bound by industrial use areas to the north and south, the Kwinana Freeway to the west and remnant... Read more...Last updated: February 23, 2023
Buru Energy Ltd propose to undertake a 2D an d 3D geological survey at one site (Rafael patch) in the west Kimberley district, approximately 80 kilometres south of Derby. The proposal would include total disturbance of up to 438 hectares by raised blade clearing of 1147 km of seismic lines and construction of a temporary workers camp within an existing cleared well site. Read more...Last updated: February 20, 2023
Project Haber Pty Ltd proposes to construct and operate a 1.4 million tonnes per annum (Mtpa) urea plant in East Arrowsmith (South Erregulla). The proposal is located approximately 280 km north of Perth and 45 km south east of Dongara, in the Shire of Three Springs. The urea plant comprises of an Air Separation Unit (ASU) producing nitrogen, oxygen and hydrogen for various processes; an ammonia synthesis unit; and a granulation and urea production unit. Supporting infrastructure includes gas... Read more...Last updated: January 9, 2023
The proposal is for the installation and operation of a Heated Overland Thermal Treatment (‘Hottpad’) system at t he Karratha liquid waste treatment plant and waste transfer station located approximately 6 kilometres south-west of Karratha. The Hottpad is intended to treat hydrocarbon-impacted ‘sludge’ from oil and gas operations in the region, that are currently transported interstate for thermal treatment. The proposal has a project life of 10 years and involves a self-sustaining smouldering... Read more...Last updated: November 16, 2022
The Order of the Servants of Mary Incorporated proposes to develop Lot 9000 Wanneroo Road Sinagra for urban development. The urban development will include residential and commercial development, internal public road network, public open space, and drainage infrastructure. The development envelope for the proposal is 29.33 hectares, which includes 2.02 hectares conservation public open space. Read more...Last updated: October 31, 2022
The requested change relates to condition 3 of Statement 1055 for an extension to the time limit for proposal implementation. Read more...Last updated: August 29, 2022
Amendments to conditions regarding the implementation of approved management plans and time limit authorisation. Read more...Last updated: August 29, 2022
TRECAP Pty Ltd proposes to amalgamate, clear and provide servicing of Lots 802, 804 and 4640 on Mandurah Road, East Rockingham to facilitate future industrial development, forming 4.0157 hectares (ha) in area. These lots are adjacent to the proponent’s Lot 850 (31.0840 ha) which is already used for industrial purposes. The site is within the Rockingham Industrial Zone strategic proposal area. The proponent has requested the EPA declare the proposal to be ‘derived proposal’; a proposal derived... Read more...Last updated: August 22, 2022
Synergy Renewable Energy Developments Pty Ltd proposes to develop a wind farm approximately 35 kilometres north-east of Hyden townsite in the Western Australian Wheatbelt. The proposal consists of up to 30 wind turbines generating up to 150 MW, electrical substations and switchyards. The turbines will be installed on towers up to 150 m tall with blades up to 90 m long for a total height of up to 240 m. All turbines are proposed to be located at least 100 m from remnant vegetation. The proposal... Read more...Last updated: August 1, 2022
Australian Vanadium Limited (AVL) propose to construct and operate a vanadium processing facility in the Midwest region, approximately 80 km east of Geraldton and 27 km west of Mullewa on the Geraldton-Mount Magnet Road in the City of Greater Geraldton. The proposal will include a processing facility which includes a processing plant, evaporation ponds, support facilities, heavy and light vehicle access roads, water production bores, reverse osmosis plant and ancillary office. The processing... Read more...Last updated: August 1, 2022
Westralian Iron Pty Ltd (the Proponent) is proposing to undertake an exploration drilling program at the Koolanooka Hills, located in the Shire of Morawa, approximately 20 km east-south-east of the township of Morawa. The purpose of the Proposal is mineral exploration drilling for iron ore and would include the clearing of no more than 2.95 hectares of native vegetation within a 3.80 ha disturbance footprint. The proposal would involve earthworks to establish (25) drill pads and access tracks,... Read more...Last updated: August 1, 2022
Resource Group (WA) Pty Ltd proposes to construct and operate a hard rock quarry at the location of Grass Valley, 17 kilometres east of Northam WA. The project will process blasted rock from the quarry into smaller sized proportions suitable for use in concrete, roadworks and other civil works. The operation will produce no more than 70,000 tonnes of saleable product per annum. Products will be transported from the quarry by road using truck and semi-trailers, both locally and to various sites... Read more...Last updated: July 18, 2022
Infinite Green Energy propose to construct and operate a green energy wind and solar powered hydrogen production facility within freehold lots 3, 4, 100 and 6110 located in Arrowsmith 30km south of Dongara, within the Shire of Irwin, Western Australia (WA). Infinite Blue Energy purchased the 1929.68 ha property due to the site’s abundance of wind and solar power combined with abundant quantity of quality fresh water. The previous property use involved sheep, cattle and goats grazing. The... Read more...Last updated: July 15, 2022
The proposal is for above and below water table mining and beneficiation of vanadium ore to produce an enriched vanadium-iron concentrate. The proposal is located 40 km south-southeast of Meekatharra and includes the development of open mine pits and associated infrastructure including but not limited to access roads, accommodation camp, a crushing, milling, flotation, and magnetic separation (beneficiation) plant, waste rock and tailings storage, and support infrastructure. Read more...