This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: April 26, 2024
The proposal is to continue to operate the existing Newmont Boddington Goldmine and associated infrastructure, and to expand the existing operations through widening and deepening of existing pits, and through construction of new waste dumps, residue disposal areas and associated infrastructure. Read more...Last updated: April 17, 2024
The proposal includes the expansion of a mineral sands mine including mine pits with dewatering to facilitate dry mining techniques. Existing processing facilities, services and support infrastructure will be utilised. Mine voids will be progressively backfilled with sand and clay tailings and rehabilitated to pre-disturbance landuse (i.e. pasture). Read more...Last updated: April 2, 2024
DevelopmentWA is seeking to develop the Kemerton Strategic Industrial Area (KSIA) for the purpose of industrial and infrastructure development as a strategic proposal. The KSIA is located within the Shire of Harvey, 17 kilometres north of Bunbury. The KSIA key characteristics are: Development of the Kemerton Strategic industry Zone (Industry Core) which is approximately 2,024 hectares (ha). There is an approximate 50-year time period for development. Ultimate land use proposed is to be heavy... Read more...Last updated: March 25, 2024
The South West Development Commission is proposing an upgrade to the marine structures that are intended to meet existing demand and future requirements for small craft maritime infrastructure and include new mooring facilities for commercial and recreational vessels, floating jetties, a boat servicing facility, improved public ablution facilities and up upgraded boat launching and storage facilities. Read more...Last updated: February 28, 2024
The, Southern Forest Irrigation Scheme, proposal involves taking water from the Donnelly River to irrigate land for horticultural and agricultural production in the southern forests region around Manjimup and Pemberton. The proposal is to construct and operate a water offtake (pump station) adjacent to the Donnelly River, a reservoir on Record Brook (a tributary of the Donnelly River), two header dams and a network of distribution water pipelines and associated infrastructure to supply water to... Read more...Last updated: January 29, 2024
Catalano Green Energy Pty Ltd (the proponent) is proposing to construct a portable 101 single person workers accommodation unit on Lot 28 Tredrea Place, Myalup, within the Shire of Harvey. The Development Envelope (approximately 40 hectares) includes Tuart Woodlands and Forest of the Swan Coastal Plain and Black cockatoo foraging habitat. The proposal includes groundwater abstraction, onsite PVC solar and battery storage for electricity generation and a wastewater treatment plant. The proposal... Read more...Last updated: December 18, 2023
The proposal is for Alcoa’s bauxite mining activities on the Darling Range in the southwest of Western Australia spanning the years 2022 to 2026. These activities occur within Alcoa’s Mineral Lease 1SA (ML1SA) and are documented in annual rolling five-year Mining and Management Programs (MMPs) required under a State Agreement Act framework. The 2022-26 MMP was approved, subject to exclusions, through the State Agreement Act framework in September 2022, and the proposal is currently being... Read more...Last updated: December 18, 2023
The proposal is for Alcoa’s bauxite mining activities on the Darling Range in the southwest of Western Australia spanning the years 2023 to 2027. These activities occur within Alcoa’s Mineral Lease 1SA (ML1SA) and are documented in annual rolling five-year Mining and Management Programs (MMPs) required under a State Agreement Act framework. A 2023-27 MMP has not yet been approved through the State Agreement Act framework but activities are still proposed to be undertaken during this time, and... Read more...Last updated: November 30, 2023
The Forest Management Plan 2024-2033 (FMP 2024-2033) is a statutory plan for the management of approximately 2,522,000 hectares of land and waters vested in the Conservation and Parks Commission in the south-west of Western Australia, in accordance with the, Conservation and Land Management Act 1984, (CALM Act) to fulfil the statutory purposes for which that land is reserved. The proposal is to undertake a range of management activities, the most significant being conservation reserve creation... Read more...Last updated: November 30, 2023
Smiths 2014 Pty Ltd proposes to develop Lot 4131 Smiths Beach Road, Yallingup (City of Busselton) into a coastal tourism village, including: Hotel accommodation and wellness centre Campground 61 holiday homes Community hub and café Surf Lifesaving Club facilities and beach ramp The proposal is located at the southern end of Smiths Beach, adjacent to the Leeuwin Naturaliste National Park. The total proposed development envelope is 40.53 hectares (ha). The major elements of the proposal include:... Read more...Last updated: November 21, 2023
The Banksia Road Landfill is located in the Shire of Dardanup approximately 10 kilometres (km) from the City of Bunbury and 3.8 km south-east of the town of Dardanup. The Landfill is currently operating under a Licence issued through Part V of the Environmental Protection Act (Licence - L8904/2015/1) which allows for the acceptance of Liquid Waste; and Class II and Class III putrescible waste. The proposal would be a continuation of the current operations and including the establishment of... Read more...Last updated: November 7, 2023
Colchester Pty Ltd propose to construct a large format hardware and retail development at Lot 100 and 256 Clarke Road within the Station Road commercial precinct located 900 metres south of the Margaret River town site. The proposal includes buildings internal roads, hardstand areas and landscaping. The proposal site is 2.86 hectares (ha) and is bounded by existing commercial business to the north and south, the South Regional TAFE Margaret River Campus to the east and remnant vegetation within... Read more...Last updated: June 14, 2023
Remove Condition 2 (Proponent Commitments) if the proponent commitments in schedule 2 have been completed, are no longer relevant to the proposal or can be managed under Part V of the Environmental Protection Act 1986 (EP Act)., The EPA, in response to a request by the Water Corporation and pursuant to s40A of the EP Act, has terminated the inquiry under s46 of the EP Act into changing the implementation conditions of Ministerial Statement 568 Read more...Last updated: May 16, 2023
Worsley Alumina Pty Ltd (Worsley) proposes to upgrade the Worsley refinery in order to increase production to 4.4 million tonnes per annum (Mtpa). Worsley has approval under Part IV of the, Environmental Protection Act, 1986, for production of 3.7Mtpa, and the refinery currently operates at 3.25Mtpa. Read more...Last updated: May 15, 2023
The proposal is for extractive industry on Bussell Highway, Kudardup, in the Shire of Augusta Margaret River. The proposal is based on the Application for Development Approval, June 2020 (ADA) appended to the Shire of Augusta Margaret River’s Planning Approval / Consent No. P220293. The proponent has identified a reduced scope to only include extraction of sand from Cells 7, 8 and 9 (gravel extraction for cells 1,2,3,4,5 and 6 is excluded). All other activities within the ADA, including... Read more...Last updated: May 15, 2023
Talison Lithium Australia Pty Ltd (Talison) is proposing to expand the existing Greenbushes Lithium Mine that has been operated for over 30 years, to increase the production of spodumene ore and lithium mineral concentrate from the operation. This proposal is an expansion of the existing mining operation and has not previously been assessed by the EPA. The mine is located in the South West of Western Australia, immediately south of the town of Greenbushes, approximately 250 km south east of... Read more...Last updated: May 10, 2023
The Commissioner of Main Roads Western Australia is proposing to construct and operate the northern section and upgrade the central section of the Bunbury Outer Ring Road (BORR). The proposal includes 19km of freeway-standard dual carriageway and associated interchanges between Forrest Highway and Boyanup-Picton Road (northern section) and between Boyanup-Picton Road and South West Highway (central section). The proposal would require the clearing of up to 73 hectares of native vegetation and... Read more...Last updated: March 27, 2023
Red Moon Property Holdings Pty Ltd and property lessee Altera Ltd propose to construct and operate Carpenter’s dam taking water from 4-mile brook. The proposal is to construct a dam not exceeding 3,400,000 cubic metres in capacity which includes an automatic bypass system that allows at least 8, 000 kilolitres of water to bypass the dam with excess water returned to the original watercourse. The proposal is in Beedelup, WA, approximately 20 kilometres Southwest of Manjimup, adjacent to the... Read more...Last updated: February 15, 2023
Main Roads Western Australia is proposing to construct and operate the southern section of the Bunbury Outer Ring Road (BORR). The proposal includes 10.5 km of freeway-standard dual carriageway, 3 km of rural distributor roads and other associated road-infrastructure. The BORR southern section will connect to the proposed northern and central sections of BORR near South West Highway, which together will complete a bypass around Bunbury City from Forest Highway to Bussell Highway. The BORR... Read more...Last updated: February 10, 2023
Saracen Properties Pty Ltd (representing 5 Star Margaret River Pty Ltd and The Beach Village Pty Ltd) proposes to develop various lots along Wallcliffe Road Gnarabup for a 121 room five star resort, and beach village comprising of short-stay accommodation, residential dwellings and commercial premises. The proposal development envelope is 8.11 hectares. The proposal is located on the western side of Wallcliffe Road, Gnarabup Beach. Following the seven day public comment period and consideration... Read more...