This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: September 8, 2023
BHP propose to expand existing mining operations at the Newman Hub in the Pilbara, approximately 2 kilometres (km) southwest of Newman. The Proposal is a derived proposal for mining operations at Newman (Western Ridge) authorised by the Pilbara Expansion Strategic Proposal, Ministerial Statement 1105. The proposal is to develop four iron ore deposits to expand BHP’s Newman Hub and includes: overburden storage areas ore and topsoil stockpiles haul and access roads overland conveyor 30 million... Read more...Last updated: September 8, 2023
The proposal is a derived proposal to expand existing mining operations at the Newman Hub in the Pilbara, previously authorised by Ministerial Statement (MS) 1105 Pilbara Expansion Strategic Proposal. This proponent proposes to expand the existing Orebody 32 above water table iron ore mine (currently authorised by MS 1037 Eastern Ridge Revised Proposal) in BHP’s Newman Hub to below the water table. The proposal is located 3.6 km northeast of Newman, and includes activities permitted to be... Read more...Last updated: September 4, 2023
K plus S Salt Australia Pty Ltd is seeking approval to construct and operate a 3.5 million tonnes per annum (Mtpa) Solar Salt Project located approximately 40 km south-west of the township of Onslow, within the Shire of Ashburton. Read more...Last updated: July 16, 2023
VRX Silica Ltd propose to develop a silica sand mine in the Geraldton Sandplain bioregion of Western Australia, approximately 270 km north of Perth. The proposal would include a total disturbance of 412.2 hectares of native vegetation and will involve sequential mining of sand 8 – 15 metres below the soil surface. Vegetation and topsoil will be relocated to rehabilitation areas using the Vegetation Direct Transfer method. Mining will be undertaken in sections by removing blocks (typically 150m... Read more...Last updated: July 4, 2023
In 1998 Main Roads Western Australia (Main Roads) referred Stages 2, 3 and 4 of the Karratha – Tom Price Road, now called the Manuwarra Red Dog Highway (the Original Proposal), to the Environmental Protection Authority (EPA). The EPA assessed the Original Proposal and published EPA Report 1159. Ministerial Statement (MS) 677 was published in 2005. Construction of Stage 2 was completed in 2008. Stage 3 of the Original Proposal is currently under construction and is expected to be completed in... Read more...Last updated: July 3, 2023
The Proposal is located in the Pilbara region of Western Australia within a development envelope of 20,821 ha and clearing no more than 1,564 ha. Onslow Infraco Pty Ltd (herein MRL a wholly owned subsidiary of Mineral Resources Limited) is proposing to develop: • A fully sealed private haul road, approximately 125km in length • Gas pipeline and ancillary haul road infrastructure. • Storage and bulk handling of ore at the Port of Ashburton. • Dredging a dedicated berthing pocket adjacent to the... Read more...Last updated: June 26, 2023
Karara Mining Limited is seeking to revise its existing Karara Iron Ore Mine, located 320 km north-northeast of Perth in the Midwest Region of Western Australia. The revised proposal includes additional ground disturbance to support the revised Life of Mine strategy, including a revised development envelope, extension of the tailings storage facility and waste rock landform, incorporation of the areas previously approved under the Mungada Iron Ore Project (MIOP) (MS 806) and areas required for... Read more...Last updated: June 26, 2023
The proposal is to construct and operate a new 48 km section of the Great Northern Highway within the Shire of Chittering. The proposal would bypass the town of Bindoon located approximately 70 km north east of Perth, Western Australia. The Proposal would consist of a combination of four lane dual carriageway, four lane single carriageway and two lane single carriageway and would divert from the existing GNH at the Chittering Roadhouse running west of Bindoon and re-joining the GNH between Hay... Read more...Last updated: June 22, 2023
The Public Transport Authority (PTA) proposes to construct and operate a new 14.5 kilometre (km) dual railway track to extend the existing Thornlie passenger line to Cockburn Central Station on the Mandurah line and duplicate the existing 3 km of single track between Beckenham Junction and Thornlie Station. The proposal requires the relocation of 11 km of freight line within the existing rail reserve. The proposal requires the construction and operation of two new stations at Ranford and... Read more...Last updated: June 21, 2023
Leichhardt Industrials Pty Ltd propose to develop the Eramurra Solar Salt project approximately 55 km west-south-west of Karratha in the Pilbara region of Western Australia. The proposal includes the development of a series of concentrator and crystalliser ponds and a processing plant. Supporting infrastructure includes seawater intake, bitterns outfall, desalination plant and groundwater bores, power supply and other infrastructure. Export of product would be via a previously approved trestle... Read more...Last updated: June 19, 2023
Woodside Energy Technologies Pty Ltd propose to construct and operate H2Perth, a domestic and export scale hydrogen and ammonia production facility, located approximately 40 km south of Perth. The proposal is to be located primarily within the Rockingham Industrial Zone (RIZ) in the City of Rockingham, with elements also located within the City of Kwinana and on the multi-user Kwinana Bulk Jetty. The proposal would produce approximately 3250 megawatts of gaseous hydrogen and approximately 3.25... Read more...Last updated: June 16, 2023
The requested change relates to condition 3 of Statement 1027 for an extension to the time limit for proposal implementation. Read more...Last updated: June 14, 2023
Remove Condition 2 (Proponent Commitments) if the proponent commitments in schedule 2 have been completed, are no longer relevant to the proposal or can be managed under Part V of the Environmental Protection Act 1986 (EP Act)., The EPA, in response to a request by the Water Corporation and pursuant to s40A of the EP Act, has terminated the inquiry under s46 of the EP Act into changing the implementation conditions of Ministerial Statement 568 Read more...Last updated: June 7, 2023
The Ridley Magnetite Project (the Proposal) is located approximately 57 km east of Port Hedland. The proposal is located within a 14,181 ha Development Envelope with an indicative disturbance footprint of 7,406 ha. The proposal is for the mining and processing of iron ore to produce 3 Million tonnes per annum (Mtpa) of magnetite concentrate for export under Stage 1, with an increase to 16.5 Mtpa under Stage 2. The proposal includes a single pit (below water table), run-of-mine pad, concentrate... Read more...Last updated: June 2, 2023
The proposal is to undertake an onshore three-dimensional (3D) seismic survey in the northern Perth Basin. The survey area is about 300 kilometres (km) north of Perth, and its nearest boundary is about 4.5 km north of the town of Eneabba and about 25 km southeast of the town of Dongara. The survey area is situated within four local shires: Shire of Irwin, Shire of Three Springs, Shire of Mingenew and Shire of Carnamah. The intent of the Zemira 3D Seismic Survey is to collect a high-quality 3D... Read more...Last updated: May 29, 2023
Time limit for substantial commencement, review of the adequacy of existing implementation conditions to ensure consistency with the EPA’s current objectives for each environmental factor. Read more...Last updated: May 22, 2023
The proposal involves the construction and use of a landfill and associated infrastructure for receiving Class II and III waste of 150,000 to 250,000 tonnes per annum (tpa) over a period of 20 years. The proposal is located at Allawuna Farm, St Ronans, within the Shire of York. Read more...Last updated: May 10, 2023
The Commissioner of Main Roads Western Australia is proposing to construct and operate the northern section and upgrade the central section of the Bunbury Outer Ring Road (BORR). The proposal includes 19km of freeway-standard dual carriageway and associated interchanges between Forrest Highway and Boyanup-Picton Road (northern section) and between Boyanup-Picton Road and South West Highway (central section). The proposal would require the clearing of up to 73 hectares of native vegetation and... Read more...Last updated: February 15, 2023
Main Roads Western Australia is proposing to construct and operate the southern section of the Bunbury Outer Ring Road (BORR). The proposal includes 10.5 km of freeway-standard dual carriageway, 3 km of rural distributor roads and other associated road-infrastructure. The BORR southern section will connect to the proposed northern and central sections of BORR near South West Highway, which together will complete a bypass around Bunbury City from Forest Highway to Bussell Highway. The BORR... Read more...Last updated: February 10, 2023
Saracen Properties Pty Ltd (representing 5 Star Margaret River Pty Ltd and The Beach Village Pty Ltd) proposes to develop various lots along Wallcliffe Road Gnarabup for a 121 room five star resort, and beach village comprising of short-stay accommodation, residential dwellings and commercial premises. The proposal development envelope is 8.11 hectares. The proposal is located on the western side of Wallcliffe Road, Gnarabup Beach. Following the seven day public comment period and consideration... Read more...