This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: October 28, 2010
The proposal is to develop an iron ore mine at the Koolyanobbing Iron Ore Project-Mt Jackson J1 Deposit (Mt Jackson J1 Deposit), located approximately 110 kilometres (km) north-north-east of Southern Cross in the Shire of Yilgarn. The proposal includes two mine pits to extract approximately 33 million tonnes of iron ore and associated mining infrastructure. The proposed mine required disturbance of approximately 605 hectares (ha) of native vegetation for pits, associated mine infrastructure,... Read more...Last updated: September 17, 2010
The proposal is to construct and operate the Coolimba Power Station on a site located approximately 15 kilometres (km) south-south-west of Eneabba, and to establish an approximately 20 km long and 100 metre (m) wide infrastructure corridor that will accommodate the construction and operation of: a natural gas pipeline lateral to connect the power station to either the Dampier to Bunbury Natural Gas Pipeline (DBNGP) or the Parmelia Gas Pipeline; and a 330 kV electricity transmission line to... Read more...Last updated: July 8, 2010
BHP Billiton Iron Ore is proposing to develop the Orebody 24 (OB24) deposit located north of Orebody 25 (OB25) Mine, and approximately 10 km north-east of the town of Newman in the Pilbara Region. New and existing OB25 infrastructure would be utilised. Read more...Last updated: June 30, 2010
The proposal is to construct and operate a minimum 50 GL/annum and up to 100 GL/annum desalination plant on Lots 32 and 33, and Part Lot 8 Taranto Road, Binningup; marine inlet/outlet pipes; and a water supply pipeline to transport potable water to the Integrated Water Supply Scheme via a storage facility near Harvey. Read more...Last updated: June 15, 2010
The strategic proposal is to: extend the Leeuwin Naturaliste National Park into the western part of Sussex Location 413; and develop the eastern part of Sussex Location 413 for tourism and residential purposes with associated public open space and foreshore reserves as generally depicted on the Development Guide Plan. Read more...Last updated: February 9, 2010
Straits Salt proposes to construct and operate a 4.2 million tonne per annum solar salt farm on the east coast of Exmouth Gulf. Read more...Last updated: January 22, 2010
The Shire of Busselton proposes to build a road, known as Ford Road, across the Vasse Estuary. The road is currently an unsealed road (track). The Environmental Protection Authority (EPA) has previously reported on the environmental acceptability of constructing the road ( EPA Bulletin 940 ). In Bulletin 940, the EPA recommended that the proposal not be implemented as the proposal would not meet the EPA's objective in relation to waterbirds. The Shire of Busselton, as proponent, appealed... Read more...Last updated: December 23, 2009
Proposal to develop and operate an open-cut iron ore mine with infrastructure and utilities located in the Cape Preston region, 80 km south-west of Karratha by Mineralogy Pty Ltd. Read more...Last updated: December 15, 2009
The Red October Gold Project is located on the western shore of Lake Carey, 80km south of Laverton. The proposal is to mine approximately 16 million tonnes of ore and associated waste material over a two year period involves development of an open cut gold mine and waste rock dumps on the lake bed and construction of mine infrastructure and borrow pits on Anglefish Island adjacent to the mining pit. Read more...Last updated: December 1, 2009
The proposal is to construct a deepwater port to service fully loaded Panamax sized vessels (65 000 DWT) at Oakajee, approximately 23 kilometres north of Geraldton. Three site locations (north, south and central) and two different design options (inshore and off-shore) were considered in developing the proposal. The design option favoured by the proponent is an in-shore port design at the northern sector. The port study area is approximately 23 kilometres north of Geraldton. The port will... Read more...Last updated: October 11, 2009
The proposal is to extend Roe Highway from South Street in Canning Vale to connect to Kwinana Freeway in Leeming over a distance of approximately 4.5 km. The highway is planned as a four-lane dual carriageway (two lanes in each direction), with provision for future upgrading to three lanes in each direction. The land required for any future upgrading will be provided in the median strip. The total footprint of the project area represents 62 hectares (ha). Approximately 53.9 ha of this area will... Read more...Last updated: April 28, 2009
The proponent proposes to mine up to 10.1 Mtpa of magnetite ore to produce 6 Mtpa of ore concentrate over a 15 year mine life. The magnetite concentrate would be conveyed to Port Hedland from the mine via a 110 km slurry pipeline located alongside the existing Pilbara Energy Pipeline (PEPL). The concentrate would be dewatered at a purpose-built facility located at Utah Point in the Port Hedland Port area, prior to shipping overseas, where it would be used predominantly in steel manufacture. Read more...Last updated: February 12, 2009
The proposal is to develop an iron ore (haematite) mine at Jack Hills approximately 100 km west of Meekatharra. The project will have a lifespan of approximately seven years (five years of mining, two years of closure activities) and will be a contract mining operation. The project will consist of an open cut mine with one pit up to 140 metres deep (approximately 41.2 MT of ore and waste rock). The floor of the pit will be above the watertable and the pit will not be backfilled. Product will be... Read more...Last updated: December 17, 2008
The proposal is to develop a new iron ore mine approximately 60 kilometres west-north-west of Tom Price and 25 kilometres south-west of the existing Brockman 2 mine. The major components of the project include: Three new mine pits- with approximately 20% of the orebody occurring below the water table; Dry processing plant- including crushers, overland conveyor and screens; this will be located to the north of the pits running east/west to the rail loop; Associated mine infrastructure- this... Read more...Last updated: February 7, 2008
Proposal to carry out an onshore 3D seismic survey, 20 kilometres west of Brand Highway, northwest of Cataby in the Shire of Dandaragan, by Empire Oil Company (WA) Limited Read more...Last updated: November 29, 2006
This proposal is for the Development of Industrial Land on the Burrup Peninsula. The proposed site is designated Industrial Lease Area A (Site A). Approval would allow Woodside Energy Ltd to undertake limited site preparation activities for the future installation of infrastructure, such as LNG and condensate storage tanks, which would be needed should the proposed Pluto LNG Development be allowed to proceed. Read more...Last updated: November 17, 2006
The proposal is for the remaining life of the mine (50+ years), located west of Jimblebar Creek on Mining Lease 266SA. It entails increasing the iron ore production rate at the mine from 8 million tonnes per annum (Mtpa) to approximately 12Mtpa, and the mining of the currently undeveloped deposits on either side of the existing operation, including both in-situ hard rock and detrital ores. Approximately 600 million tonnes of Marra Mamba iron ore have been identified within the mining envelope.... Read more...Last updated: June 29, 2006
The proponent proposes to construct and operate a number of looping sections adjacent (and connected) to the existing underground gas transmission pipeline within the DBNGP corridor. There are nine separate looping sections proposed from CS 1 south of Karratha, to CS 9, north of Gingin. Looping is a process of duplicating an existing pipeline between compressor stations for a certain distance. Once the specified distance is reached, it then ties back to the parallel pipeline. This design... Read more...Last updated: June 23, 2006
Proposal to develop the Wallaby Gold Mine. Located on the shore of Lake Carey, a naturally occurring saline wetland approximately 27 km south-west of Laverton. The Wallaby Gold Mine Project includes development of an open cut gold mine, waste rock dumps and infrastructure to support mining on the northern shoreline of the lake. Gold ore produced at the mine will be transported via overland conveyor to an existing processing plant with tailings placed in both an extended and a new tailings... Read more...Last updated: March 28, 2006
The proposal is for the developing of mining operations at the areas of Trilogy and Kundip, construction of a haul road, construction and operation of a processing plant, and disposal of tailings at the RAV 8 site. Read more...