ProjectProponent: Tectonic Resources NLProposal description: The proposal is for the developing of mining operations at the areas of Trilogy and Kundip, construction of a haul road, construction and operation of a processing plant, and disposal of tailings at the RAV 8 site. Assessment Number: 1618Region: Goldfields EsperanceReferred under EP Act: s38Industry sector: GoldLast updated: March 28, 2006Current Status: Ministerial Statement published 1. ReferralReferral documentation: Environmental Protection Statement (December 2005) (PDF, 26.05 MB) Appendix A Letters from Shire and Landowners (ZIP, 1.94 MB) Appendix B GCA - Geochemical Characterisation- Kundip and Trilogy (PDF, 4.76 MB) Appendix C OES - Topsoil Characterisation at Kundip and Trilogy (PDF, 1.4 MB) Appendix D Hydrology and surface water quality (PDF, 3.05 MB) Appendix E Hydrology and groundwater (PDF, 4.13 MB) Appendix F Vegetation and Flora (PDF, 14.72 MB) Appendix G OES - Trilogy Baseline Flora survey (PDF, 1.7 MB) Appendix H Fauna studies and decision on MNES (PDF, 3.05 MB) Appendix I Brad Goode Aboriginal Heritage Survey (PDF, 8.81 MB) Appendix J Tamora - Aboriginal Heritage Survey (PDF, 5.11 MB) Appendix K Department of Indigenous Affairs correspondence (ZIP, 3.51 MB) Appendix L Correspondence to and from the Heritage Council of WA (PDF, 1.56 MB) Appendix M Process Facility (PDF, 133.7 KB) Appendix N SRE Tailings Storage Facility NOI (PDF, 435.28 KB) Appendix O Preliminary Geotechnical Assessment (slope design parameters) (PDF, 327.3 KB) Appendix P Adjustments to wall design parameters (PDF, 347 KB) Appendix Q Geochemical Characteristics Process Tailings Slurry (PDF, 1.64 MB) Appendix R SRE Trilogy Water Storage Facility NOI (PDF, 339.96 KB) Appendix S Draft Trilogy Rehabilitation and Preliminary Closure Management Plan (PDF, 1.23 MB) Appendix T Kundip Water Storage Facility NOI (PDF, 246.47 KB) Appendix U Draft Kundip Rehabilitation and Preliminary Closure Management Plan (PDF, 732.65 KB) Appendix V Modelling Effects of Tailings Emplacement (PDF, 1.72 MB) Appendix W RAV 8 Site Water Balance (PDF, 45.78 KB) Appendix X Impact of pit seepage (PDF, 126.55 KB) Appendix Y Baseline Dust Monitoring - Kundip (PDF, 631.27 KB) 2. Decision on whether to assess this proposalChair's Determination: Environmental Protection Statement (EPS)Preliminary Environmental Factors: Flora and VegetationTerrestrial FaunaHydrological ProcessesInland Waters Environmental QualityDate published: Thursday, 5 January, 2006 4. EPA Report on assessmentEPA Report Number: 1213EPA Report: Phillips River Gold Project, Ravensthorpe (PDF, 8.22 MB)Date published: Thursday, 5 January, 2006Appeals close: Thursday, 19 January, 2006 5. Decision on proposal and implementation of proposalMinisterial StatementDate of approval: Wednesday, 22 March, 2006Ministerial Statement: Ministerial Statement 716 (PDF, 1.22 MB)