This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 10, 2021
The Proposal will involve the construction and operation of a new rare earth refinery at Iluka Eneabba Mine Site, located 5 km south of Eneabba townsite and approximately 300 km north of Perth. It will produce approximately 17,500 tpa of individual rare earth oxides and carbonates. The Proposal will utilise the existing Eneabba monazite concentrate, future Iluka feedstocks and third party feedstocks. Products will be transported via road trains from Eneabba to the port of Fremantle for export.... Read more...Last updated: November 8, 2021
The proposal is for the dewatering of up to 1 gigalitre per annum from the existing underground component of the Bellevue Gold Mine, to allow safe access for exploration drilling. This will occur on mining leases M36/24 and M36/25, 40km NW of Leinster. Read more...Last updated: November 1, 2021
The City of Busselton propose to remove a layer of nutrient-rich, fine organic sediments which have accumulated throughout the lower reach of the Vasse River. The proposal is located within the City of Busselton and extends for 2.5 km from the Butter Factory Museum to the Busselton Bypass. Sediment removal will be staged and undertaken via a mobile micro-dredge, or similar unit. The dredged sediment will be pumped to a designated onshore laydown area(s), allowed to dewater with the return water... Read more...Last updated: October 25, 2021
Main Roads Western Australia (Main Roads) is proposing to build the Swan River Crossings (the Proposal) that includes the construction of new road and rail bridges, the upgrading of the existing rail bridge and the demolition of the existing Fremantle Traffic Bridge in Fremantle, Western Australia. The proposals location includes the Road and rail corridor along Queen Victoria Street, Fremantle from Tydeman Road in the north to Canning Highway south of the Swan River. And the eastern side of... Read more...Last updated: October 25, 2021
Renergi Pty Ltd propose to build and operate a trial pyrolysis plant in the Shire of Collie. The rial will run for up to 2 years. The proposal involves the treatment of municipal waste and forestry waste via pyrolysis to produce a biochar, condensed bio-oil and wood vinegar. The trial plant is small scale and will be constructed within the boundary of the Collie waste facility operated by the Shire of Collie Read more...Last updated: October 25, 2021
Kimberley Technology Solutions Pty Ltd is referring the Cockatoo Island Multi-User Supply Base to develop an upgraded airfield, a wharf and an aftermarket subsea workshop as well as other related support infrastructure. The proposal is located on Cockatoo Island in the Shire of Derby. The proposal would include a loss of 0.54 hectares (ha) of hard coral and algae of which 0.3 ha is very sparse hard coral. The proposed new wharf would run parallel to the shoreline. The impacts to terrestrial... Read more...Last updated: October 18, 2021
Lot 902 Flynn Drive Neerabup is 22.03 hectares (ha) hectares (ha) in size, and is proposed to be subdivided into two lots; one conservation lots of 8.01 ha and a balance 14.02 ha lot for future industrial development with clearing and earthworks. The proposal is within Bush Forever Site 295, and fully vegetated. Read more...Last updated: September 28, 2021
The proposal is to develop an additional small satellite nickel deposit at New Morning. The project is located within the Shire of Kondinin, approximately 80 kilometres east of Hyden. The proposal includes development of the New Morning deposit, waste dump, ROM pad, transport and infrastructure corridors. The proposal would require a maximum clearing extent of 29 hectares of native vegetation within a 64.5-hectare development envelope. The proposed life of mine is 2- 3 years. Read more...Last updated: September 28, 2021
Busselton Jetty Incorporated is proposing to construct and operate an underwater observatory, the Australian Underwater Discovery Centre (AUDC) at the existing Busselton Jetty, Busselton, south-west Australia. The proposal includes the towing of the pre-fabricated AUDC by vessel approximately 100 nautical miles, underwater debris removal, piling activities, installation of the AUDC and installation of a pre-fabricated modular building on the jetty. Piling works associated with the installation... Read more...Last updated: September 20, 2021
Pantoro South Pty Ltd propose to recommence operations of the Norseman Gold Project located adjacent to the town of Norseman, 200 kilometres (km) south of Kalgoorlie. The proposal involves extensions to existing mines and excavation of new open pits, associated mine dewatering, onsite ore processing and waste (tailings and waste rock) disposal and the construction of additional supporting infrastructure. The total disturbance footprint of the proposal is 590 hectares (ha), comprising 150 ha... Read more...Last updated: September 14, 2021
Hastings Technology Metals Ltd propose to expand the existing approved Yangibana Rare Earths Project, a Rare Earth Elements mine which includes on site processing and associated infrastructure. The expansion involves mining from two additional pits (Yangibana and Auer) and one larger amalgamated pit (Bald Hill-Simon’s Find-Fraser’s). The proposal is located approximately 270 kilometres east-north-east of Carnarvon in the Shire of Upper Gascoyne. The proposal would include total disturbance of... Read more...Last updated: September 13, 2021
Alinta Energy (subsidiary of Alinta DEWAP Pty Ltd) currently owns and operates the existing Port Hedland Power Station (PHPS) located within the Boodarie Strategic Industrial Area approximately 12 km south of the Port Hedland town centre and approximately 5 km west of South Hedland, ., The Proposal utilises new technologies providing more energy efficient and reliable power to customers in the Port Hedland area. This will include the installation of a 60 Megawatts (MW) natural gas fuelled... Read more...Last updated: August 31, 2021
Digital 4 Pty Ltd proposes to develop Lot 802 Erindale Road Hamersley for urban development. Clearing of native vegetation will also occur within the western portion of Lot 803 to establish an Asset Protection Zone to meet requirements for bushfire management. The urban development will include residential development, internal public road network, public open space, a conservation area, drainage swales/basins and sewer easements. The development envelope for the proposal is 13.55 hectares. The... Read more...Last updated: July 26, 2021
Minara Resources Pty Ltd (Minara) propose to undertake a program of grade control drilling across the southern portion of the Irwin Hills Project, located approximately 85 kilometres (km) south-east of Laverton and approximately 120 km south-east of the existing Murrin Murrin Nickel Cobalt Project, Western Australia. The proposal would consist of clearing 312 hectares (ha) of native vegetation and utilise 29 ha of existing disturbance within a proposed 935 ha development envelope. The life of... Read more...Last updated: June 28, 2021
The Water Corporation are proposing to construct a new 12.5 km pressured wastewater pipeline, primarily along Gnangara Road, from the Barrambie Way Sewerage Pumping Station in Ellenbrook to the Gnangara Branch Sewer in Wangara. The total disturbance area for the proposal is 30 ha, with a total clearing of no more than 0.3 ha of native vegetation. Read more...Last updated: May 31, 2021
The Water Corporation propose to construct a seawater desalination plant to supply potable water to the town of Onslow, WA. Seawater intake and brine wastewater release will occur in Beadon Bay, approximately 1 km seaward from the shoreline. The desalination processing facility is to be located at Lot 551, 552 and/or 553 Beadon Creek Road, Onslow. The proposal will involve the installation of permanent subtidal infrastructure in Beadon Bay (intake head, brine diffusers and transport pipes), a... Read more...Last updated: May 10, 2021
Norton Gold Fields Pty Ltd propose to develop the Binduli North Project located approximately ten kilometres west of the city of Kalgoorlie-Boulder. The proposal includes the expansion of three existing open pits, the development of a new open pit, waste rock dumps, run of mine pads, a heap leach processing facility, processing plant infrastructure and supporting mine infrastructure. The proposal has a disturbance footprint of 924.2 ha which includes 270.1 ha of previously disturbed land and a... Read more...Last updated: April 19, 2021
The, Southern Forest Irrigation Scheme, proposal involves taking water from the Donnelly River to irrigate land for horticultural and agricultural production in the southern forests region around Manjimup and Pemberton. The proposal is to construct and operate a water offtake (pump station) adjacent to the Donnelly River, a reservoir on Record Brook (a tributary of the Donnelly River), two header dams and a network of distribution water pipelines and associated infrastructure to supply water to... Read more...Last updated: April 6, 2021
Focus Minerals Ltd propose a small scale operation limited in duration for crushing and screening waste rock material from an existing waste rock dump at the Lancefield Gold Mine area. The proposal is located approximately 250 kilometres north east of Kalgoorlie. There will be approximately 1.5 hectares of clearing for a water pipeline and widening access tracks to support the mobile crushing and screening machinery. Read more...Last updated: February 15, 2021
Energy Resources Ltd proposes to undertake 3D (Romanesque) and 2D (Black Cormorant) seismic acquisition surveys to map the subsurface geology of an area within petroleum exploration permits EP 389 (R4), EP 440 (R1), and petroleum production licences L 18 and L 19. The proposal is located within the Shire of Gingin. The Romanesque 3D seismic acquisition survey comprises of 594 line kilometres of seismic lines plus 72 line kilometres of contingent lines. The Black Cormorant 2D seismic... Read more...