Minara Resources Pty Ltd (Minara) propose to undertake a program of grade control drilling across the southern portion of the Irwin Hills Project, located approximately 85 kilometres (km) south-east of Laverton and approximately 120 km south-east of the existing Murrin Murrin Nickel Cobalt Project, Western Australia.
The proposal would consist of clearing 312 hectares (ha) of native vegetation and utilise 29 ha of existing disturbance within a proposed 935 ha development envelope.
The life of the proposal is estimated to be 3.5 years and would comprise clearing and access road construction, grade control drilling, and rehabilitation and closure activities.