This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: April 11, 2024
Tellus Holdings Ltd are proposing to increase the tonnage of waste accepted at the Sandy Ridge Facility from the current approved (Ministerial Statement 1078) 100,000 tonnes per annum to up to 280,000 tonnes per annum for permanent isolation in the Site’s waste disposal cells. The Proposal will occur within the existing and approved development envelope as outlined in Ministerial Statement 1078 Read more...Last updated: April 10, 2024
Simcoa Operations Pty Ltd is proposing to establish a new quartzite mine approximately 15 km north of Moora, in the Wheatbelt region of Western Australia, and 2 km north of the existing mine. The proposal will include the establishment of an above groundwater mine pit, waste rock landform, infrastructure corridor and associated infrastructure. Quartzite would be trucked to Simcoa’s existing smelter in the Kemerton Strategic Industrial Area 17 km north-east of Bunbury. It is anticipated the... Read more...Last updated: July 16, 2023
VRX Silica Ltd propose to develop a silica sand mine in the Geraldton Sandplain bioregion of Western Australia, approximately 270 km north of Perth. The proposal would include a total disturbance of 412.2 hectares of native vegetation and will involve sequential mining of sand 8 – 15 metres below the soil surface. Vegetation and topsoil will be relocated to rehabilitation areas using the Vegetation Direct Transfer method. Mining will be undertaken in sections by removing blocks (typically 150m... Read more...Last updated: June 14, 2023
Perpetual Resources Limited propose to develop a silica sand mine in the Geraldton Sandplain bioregion of Western Australia, approximately 300 km north of Perth. The proposal would include a total disturbance of 590 hectares of native vegetation and will involve sequential mining of sand above the water table. 100 ha will be cleared within the first two years followed by annual clearing of 20 ha cells and progressive rehabilitation of mined cells. Vegetation and topsoil will be stockpiled for... Read more...Last updated: May 15, 2023
The proposal is for extractive industry on Bussell Highway, Kudardup, in the Shire of Augusta Margaret River. The proposal is based on the Application for Development Approval, June 2020 (ADA) appended to the Shire of Augusta Margaret River’s Planning Approval / Consent No. P220293. The proponent has identified a reduced scope to only include extraction of sand from Cells 7, 8 and 9 (gravel extraction for cells 1,2,3,4,5 and 6 is excluded). All other activities within the ADA, including... Read more...Last updated: September 6, 2022
Questdale Holdings Pty. Ltd. (the proponent) are proposing to clear vegetation for bushfire fuel reduction and to extend an existing sand quarry extraction operation within Lots 2 and 10 Rowley Road, Mandogalup. The proposal area consists of 43.67 hectares (ha) and is located on freehold land. The proponent proposes to extract sand at a rate of 195,000 tonnes per annum for a period of 10 years. Excavated material will be screened prior to loading. The proponent proposes to clear approximately... Read more...Last updated: August 1, 2022
Resource Group (WA) Pty Ltd proposes to construct and operate a hard rock quarry at the location of Grass Valley, 17 kilometres east of Northam WA. The project will process blasted rock from the quarry into smaller sized proportions suitable for use in concrete, roadworks and other civil works. The operation will produce no more than 70,000 tonnes of saleable product per annum. Products will be transported from the quarry by road using truck and semi-trailers, both locally and to various sites... Read more...Last updated: July 11, 2022
The Proposal is located in the east Pilbara region of Western Australia within a development envelope of 718 ha and clearing no more than 270 ha. The Beatons Creek Gold Project is currently operating under relevant approvals and permits of the Environmental Protection Act (Part V) and Mining Act 1978 (Mining Act). The Fresh Rock Expansion proposes to mine deeper into the fresh rock resource including below the water table, enabling mining to continue at Beatons Creek. The proposal includes: •... Read more...Last updated: June 20, 2022
The proponent (VRX Silica Ltd) proposes to develop a high-grade silica sand mine in the Geraldton Sandplain bioregion of WA, approximately 260 km north of Perth and 20km North-West of Eneabba. The proposal would include a total disturbance of 334 hectares of native vegetation. Vegetation and topsoil would be relocated to rehabilitation areas using a Vegetation Direct Transfer method (VDT). Mining is proposed to occur in blocks (150m x 150m), with up to five blocks being mined each year. The... Read more...Last updated: May 30, 2022
The requested change relates to condition 3 of Statement 1035 (as relevant to Statement 861) for an extension to the Time Limit for Proposal Implementation. Read more...Last updated: April 5, 2022
Doyles Lime Service Pty Ltd proposes limestone and sand excavation approximately 4.5 km north of the Preston Beach townsite, Shire of Waroona. Read more...Last updated: March 28, 2022
The City of Fremantle and Fremantle Ports propose to undertake up to 150,000 cubic metres of maintenance and capital dredging from a portion of Fremantle Ports deep water entrance channel and nourish Port Beach with the dredged material. The proposal footprint is 60.27 hectares, located 1.6 kilometres from the Cottesloe Reef Fish Habitat Protection Area. The proposal could impact on the environmental factors of benthic communities and habitats, marine environmental quality, coastal processes... Read more...Last updated: February 2, 2022
Change to Condition 9 (Rehabilitation) to remove reference to northern portion of Lot 2 Read more...Last updated: January 31, 2022
APH Contractors proposes to extract approximately 2.2 million bank cubic metres of sand from 22.87 hectares over a period of 20 years at an annual extraction rate of 100,000 – 120,000 tonnes per year. Sand will be extracted to a maximum depth of 20m Australian Height Datum (AHD). It is proposed that sand extraction will continue from east of Gelorup Hill and move progressively southwards in 18 sand extraction blocks, each between one and two hectares. Embankments will be restored to 1:4 (14o)... Read more...Last updated: September 28, 2021
Ietto Farms proposes to extract sand and limestone from Lots 1498 and 1504 Finn Road, Myalup in the Shire of Harvey. The original extractive industry licence for this proposal expired in July 2014. The proposal would extract sand and limestone from the site, to facilitate road construction projects throughout the southwest of Western Australia. The proposal is located adjacent to Lake Preston, a conservation category wetland and RAMSAR listed wetland. The proposal would require the clearing of... Read more...Last updated: July 28, 2021
Hanson Australia Pty Ltd (formerly Rocla Pty Ltd) proposes to extract sand within Bush Forever Site 390, on mining tenements M70/1142 and M70/1088 approximately 20km South of Perth at Lot 467 Jandakot Road, Banjup (City of Cockburn). The proposal would include: - a development envelope of 9.56 hectares (ha), including 5.63 ha that has been historically cleared; - clearing of 3.93 ha of native vegetation; - sand extraction of 300,000 tonnes over a period of approximately three years; - dry... Read more...Last updated: April 6, 2021
Focus Minerals Ltd propose a small scale operation limited in duration for crushing and screening waste rock material from an existing waste rock dump at the Lancefield Gold Mine area. The proposal is located approximately 250 kilometres north east of Kalgoorlie. There will be approximately 1.5 hectares of clearing for a water pipeline and widening access tracks to support the mobile crushing and screening machinery. Read more...Last updated: September 24, 2020
Change to implementation conditions relating to financial assurance requirements. Read more...Last updated: August 24, 2020
King Street Trust is applying for Planning Consent and an Extractive Industries Licence for sand extraction on Lot 226, Paterson Road, Nambeelup, for a period of 10 years. Lot 226 Paterson Road is approximately 155 hectares (ha) in size. The proposal will require a total of 24.5 ha of proposed disturbance (excavation) including 12.7 ha of native vegetation clearing. The depth of excavation will be between 1 to 5 metres below natural land surface, with the rate of excavation between 50 000 and... Read more...Last updated: September 2, 2019
Brikmakers (BGC Australia Pty Ltd) propose to extract clay and sand at Lots 5 and 6 (1728) Great Northern Highway, Bullsbrook. The site was historically used for the grazing of cattle. Therefore, the majority of the site has been previously cleared of vegetation. Several stands of native trees are located mostly to the west of Lot 5 and to the north of Lot 6. The proposal would include the clearing of 7 hectares of native vegetation and excavation of up to 26 metres in depth. Read more...