Last updated: November 25, 2024
PEG proposes to construct and operate 14 new gas-fired reciprocating engines with a combined maximum installed capacity of 165 MW. It is expected the average annual throughput of the facility will be approximately 150 MW. The 165 MW power station is expected to result in 609,696 tCO2-e. The proposed PEG power station is located next to the existing Solomon power station and replaces the need for 221 MW power at Iron Bridge, which would have resulted in 1,196,423 tCO2-e. FMG have submitted a... Read more...Last updated: November 25, 2024
The construction of facilities for the development of the Greater Gorgon Gas Fields on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on Barrow Island. Read more...Last updated: November 25, 2024
The construction of facilities for the development of the Pluto Gas Field on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on the Burrup Peninsula. Extensive dredging will be undertaken adjacent to the export facility. Read more...Last updated: September 27, 2024
The Utah Point Berth Project consists of two separate stages: Stage A: Dredging and Reclamation; and Stage B: Construction and Operation. Stage A, dredging and reclamation works for the UPBP was approved by the Minister for Environment as an amendment to the existing Fortescue Metals Group (FMG) approval and managed according to the approved conditions. The works for Stage A have been successfully completed. The EPA determined that Stage B, the construction and ongoing operation of stockyard... Read more...Last updated: February 19, 2024
The requested change relates to condition 3 of Ministerial Statement 1056 (as relevant to Ministerial Statement 891) for an extension to the Time Limit for Proposal Implementation for the proposal approved under MS 891. With the agreement of the proponent, the Environmental Protection Authority will take no further action in relation to the s.46 inquiry into the proposed changes to condition 3 of Ministerial Statement 1056 (as relevant to Ministerial Statement 891) Read more...Last updated: February 9, 2024
The proposal includes the existing Cloudbreak iron ore mine and proposed expansion. The existing mine includes open pit strip mining, backfilling of pits, progressive rehabilitation and ore processing. The expansion includes increasing ore production, development of new pits and permanent waste landforms, the development of new infrastructure, additional dewatering and water disposal activities, an upgrade of the ore processing facility. Read more...Last updated: February 5, 2024
BHP Billiton Iron Ore has prepared a Strategic Proposal of its future operations in the Pilbara for the next 50 to 100 years. The Strategic Proposal will facilitate a more holistic and longer term view of mining activities in the Pilbara region by identifying and assessing how impacts to the environment at a landscape scale will be managed. Read more...Last updated: December 22, 2023
Rio Tinto Winu Pty Limited (the Proponent) proposes to develop the Winu Project (the Proposal). The Proposal is a new copper-gold mine located approximately 300 km south of Broome and 320 km east of Port Hedland in the northern Pilbara region of Western Australia within both the Nyangumarta people’s and the Martu people’s Native Title Determination Areas. The Proposal conceptual footprint will require the clearing of up to 4,868 ha of native vegetation within a proposed 37,344 ha Development... Read more...Last updated: November 6, 2023
Fortescue Metals Group Ltd proposes to develop the Eliwana Mine Project in the Pilbara region of Western Australia. The Eliwana Mine Project Area is located approximately 90 km west-northwest of Tom Price. Over the life of the mine, the average annual production rate is estimated at 30 Mtpa but infrastructure will be constructed to reflect peaks in the annual production rate up to 50 Mtpa. The estimated mine life is 24 years. The proposal involves the clearing of up to 8,560 ha of native... Read more...Last updated: September 8, 2023
BHP propose to expand existing mining operations at the Newman Hub in the Pilbara, approximately 2 kilometres (km) southwest of Newman. The Proposal is a derived proposal for mining operations at Newman (Western Ridge) authorised by the Pilbara Expansion Strategic Proposal, Ministerial Statement 1105. The proposal is to develop four iron ore deposits to expand BHP’s Newman Hub and includes: overburden storage areas ore and topsoil stockpiles haul and access roads overland conveyor 30 million... Read more...Last updated: July 31, 2023
The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. Inquiry under s46 in response to a request to change condition 3 - Time Limit for Proposal Implementation of Ministerial Statement 891 . This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...Last updated: July 31, 2023
The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...Last updated: July 31, 2023
The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. Inquiry under s46 regarding amending the conditions of Ministerial Statement 858 . This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...Last updated: July 31, 2023
This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...Last updated: July 4, 2023
In 1998 Main Roads Western Australia (Main Roads) referred Stages 2, 3 and 4 of the Karratha – Tom Price Road, now called the Manuwarra Red Dog Highway (the Original Proposal), to the Environmental Protection Authority (EPA). The EPA assessed the Original Proposal and published EPA Report 1159. Ministerial Statement (MS) 677 was published in 2005. Construction of Stage 2 was completed in 2008. Stage 3 of the Original Proposal is currently under construction and is expected to be completed in... Read more...Last updated: September 1, 2021
The proposal is for the construction and operation of a gas processing plant, onshore supply gas pipeline, onshore sales gas pipeline, and horizontal directionally drilled shore crossing. Read more...Last updated: September 1, 2021
The proposal is an expansion of the existing Sino Iron Project approved under Ministerial Statement 635 (as amended). The proposal is required to accommodate continuation of mine operations associated with the existing two billion tonnes mining rights afforded to Sino Iron and Korean Steel in accordance with existing commercial agreements. It includes the expansion of the mine pit, waste dumps and Tailings Storage Facilities. The proposed mine pit expansion will increase in depth from 220 m to... Read more...Last updated: April 16, 2021
Robe River Mining Co. proposes to develop the West Angelas C, D and G iron ore deposits to sustain production at the existing West Angelas iron ore operations. The proposal is located approximately 130 km northwest of Newman. Mining of the C, D and G iron ore deposits will involve the additional clearing of up to 4,310 ha of native vegetation within a mine development envelope of 26,400 ha. Mine dewatering will be required to accommodate below water table mining, requiring an additional ... Read more...