Last updated: September 1, 2022
Hamersley Iron Pty Limited have submitted a revised proposal for Brockman IV. This proposal provides for the expansion of the existing mine including additional clearing and the release of excess water, as well as some other minor changes. Read more...Last updated: August 4, 2022
Yara Pilbara Fertilisers Pty Ltd propose to modify the existing Pilbara Fertiliser project to include the development of a Renewable Hydrogen Plant and associated infrastructure. The proposal is located approximately 11 km north-west of Karratha in the Pilbara region of Western Australia. The proposal is adjacent to the National Heritage listed area and the Murujuga National Park. The proposal would include a total disturbance of 24.78 hectares. The proposal will result in reduction of... Read more...Last updated: July 1, 2022
The proposal is to construct and operate an iron ore export facility at Balla Balla midway between Port Hedland and Karratha, northwest of Whim Creek in the Pilbara region of WA. Read more...Last updated: June 14, 2022
The Proposal would include the following activities: shore crossing site preparation including installation of temporary facilities along the shoreline at the Pluto LNG Facility to facilitate the installation of the trunkline in shallower depths preparation works associated with the installation of the trunkline including dredging and associated spoil disposal at existing spoil grounds trunkline installation (about 32.7 kilometres long within State waters) shore crossing site reinstatement rock... Read more...Last updated: February 2, 2022
Conditions 6-12, 9-1 to 9-5 inclusive, and 12-1 to 12-8 inclusive of Ministerial Statement 873 are to be removed from the statement and conditions 9-1 to 9-5 inclusive and conditions 12-1 to 12-8 inclusive are to be transferred into a new ministerial statement. The change will facilitate the transfer of conditions relevant to the operation of port facilities from Chevron Australia Pty Ltd to the Pilbara Ports Authority via this new Ministerial Statement. Read more...Last updated: January 25, 2022
Dredging of approximately 3,900,000 cubic metres of material for two new berth pockets and extensions to the existing departure channel and swing basin at Harriet Point and Stanley Point; disposal of dredged material at dredged material management areas. Read more...Last updated: December 24, 2021
The Proponent, FMG Iron Bridge Ltd, proposes to construct and operate the North Star Magnetite Iron Ore Mine, located approximately 110km south of Port Hedland, WA. The Project also includes a borefield in the Canning Basin and a slurry pipeline to transport the ore product to Port Hedland for export. Read more...Last updated: November 24, 2021
Mardie Minerals Pty Ltd proposes to develop a high volume salt and Sulphate of Potash project at Mardie, approximately 80 km south west of Karratha, in the Pilbara Region of Western Australia. The proposal would utilise seawater and evaporation to produce a concentrated salt product and other associated products., The proposal includes a seawater intake, evaporation ponds, processing plant, bitterns disposal pipeline and outfall, desalination plant, freshwater supply bores and associated... Read more...Last updated: September 14, 2021
The Warrawoona Gold Project, located approximately 20km south of Marble Bar, will abstract ore from an open pit and underground mine at the Klondyke deposit as well as a cutback of the existing Copenhagen pit. Ore will be processes at around 2Mtpa at Klondyke. The project will produce gold bar and gold concentrate and is expected to operate for approximately six years. The proposal would include a total disturbance of 398 hectares. Read more...Last updated: September 1, 2021
The proposal is for the construction and operation of a gas processing plant, onshore supply gas pipeline, onshore sales gas pipeline, and horizontal directionally drilled shore crossing. Read more...Last updated: September 1, 2021
The proposal is an expansion of the existing Sino Iron Project approved under Ministerial Statement 635 (as amended). The proposal is required to accommodate continuation of mine operations associated with the existing two billion tonnes mining rights afforded to Sino Iron and Korean Steel in accordance with existing commercial agreements. It includes the expansion of the mine pit, waste dumps and Tailings Storage Facilities. The proposed mine pit expansion will increase in depth from 220 m to... Read more...Last updated: June 10, 2021
Delete conditions 8-4, 8-5, 8-6, 8-7 (Marine Wastewater Outfall) relating to the management of the marine wastewater outfall for the desalination plant. Amend condition 8-8 to remove reference to conditions 8-4 and 8-5. Read more...Last updated: April 16, 2021
Robe River Mining Co. proposes to develop the West Angelas C, D and G iron ore deposits to sustain production at the existing West Angelas iron ore operations. The proposal is located approximately 130 km northwest of Newman. Mining of the C, D and G iron ore deposits will involve the additional clearing of up to 4,310 ha of native vegetation within a mine development envelope of 26,400 ha. Mine dewatering will be required to accommodate below water table mining, requiring an additional ... Read more...Last updated: January 4, 2021
Hamersley Iron Pty Limited propose to develop above and below water table iron ore deposits and associated infrastructure at Western Turner Syncline. The proposal also includes an infrastructure corridor connecting the mining operation to the existing Tom Price mine ore-processing facilities. Surplus water from mining below water table would be managed by use on site and controlled discharge to the environment. Clearing of up to 750 ha would be required. The proposal is located 20 km west of... Read more...Last updated: November 23, 2020
Atlas Iron Pty. Ltd (the proponent) propose to develop the Miralga Creek DSO Project (the proposal), an iron ore project located in the Pilbara region of Western Australia. The proposal includes the development of five open pits using conventional drill and blast, load and haul methods. 8 million tonnes of iron ore will be mined above the watertable over an approximate timeframe of four to five years. Associated infrastructure will include waste rock dumps. Existing borefield and accommodation... Read more...Last updated: October 5, 2020
Flinders Mines Ltd proposes to revise the already approved Pilbara Iron Ore Project located approximately 70 kilometres north-west of Tom Price in the Hamersley sub-region. The revised proposal includes additional clearing up to 300 hectares (ha) to include the Paragon ore deposit and external infrastructure (including haul roads, airstrip and accommodation camp), as well as an increase in abstraction of groundwater of up to 2 Gigalitre per annum. Read more...Last updated: October 2, 2020
The proposal involves the development and operation of the Hope Downs 4 Iron Ore Mine (HD4), located in the Pilbara region in the shire of East Pilbara. It includes the development and operation of an above and below the water table greenfields iron ore mine and associated infrastructure. Ore from the HD4 proposal would be transported via a new railway to existing rail infrastructure near the existing Hope Downs 1 Iron Ore Mine then to port facilities on the coast. The mine would operate... Read more...Last updated: September 30, 2020
The proposal is to mine iron ore from the Stage 1 project area on the southern slopes of the Chichester Range and develop associated mining infrastructure. Read more...Last updated: September 30, 2020
Proposal to mine iron ore from the Stage 2 project area on the southern slopes of the Chichester Range and develop a remote borefield and pipeline by Roy Hill Iron Ore Pty Ltd (RHIO). Read more...