Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Industrial (9) Apply Industrial filter
  • Power generation (8) Apply Power generation filter
  • Infrastructure (5) Apply Infrastructure filter
  • Land use (2) Apply Land use filter
  • Sand, rock, gravel and clay (2) Apply Sand, rock, gravel and clay filter
  • Waste management (2) Apply Waste management filter
  • Coal (1) Apply Coal filter
  • Mineral sands (1) Apply Mineral sands filter

Filter by current status:

  • Ministerial Statement published (24) Apply Ministerial Statement published filter
  • Awaiting Ministerial decision (1) Apply Awaiting Ministerial decision filter
  • Decision on whether to assess has been published (1) Apply Decision on whether to assess has been published filter
  • Environmental Scoping Document approved (1) Apply Environmental Scoping Document approved filter
  • Minister determined that the proposal should not be implemented (1) Apply Minister determined that the proposal should not be implemented filter
  • Proposal withdrawn (1) Apply Proposal withdrawn filter

Filter by relevant environmental factors:

  • (-) Remove 37 filter 37
  • Social Surroundings (17) Apply Social Surroundings filter
  • Flora and Vegetation (14) Apply Flora and Vegetation filter
  • Inland Waters Environmental Quality (14) Apply Inland Waters Environmental Quality filter
  • Hydrological Processes (13) Apply Hydrological Processes filter
  • Terrestrial Environmental Quality (11) Apply Terrestrial Environmental Quality filter
  • Terrestrial Fauna (8) Apply Terrestrial Fauna filter
  • Marine Environmental Quality (5) Apply Marine Environmental Quality filter
  • People (5) Apply People filter
  • Inland Waters (3) Apply Inland Waters filter
  • 3144 (2) Apply 3144 filter
  • Marine Fauna (2) Apply Marine Fauna filter
  • Benthic Communities and Habitats (1) Apply Benthic Communities and Habitats filter
  • Human Health (1) Apply Human Health filter
  • Landforms (1) Apply Landforms filter
  • Subterranean Fauna (1) Apply Subterranean Fauna filter
  • Water (1) Apply Water filter

Filter by Proponent:

  • Worsley Alumina Pty Ltd (4) Apply Worsley Alumina Pty Ltd filter
  • Simcoa Operations Pty Ltd (3) Apply Simcoa Operations Pty Ltd filter
  • Cable Sands (WA) Pty Ltd (2) Apply Cable Sands (WA) Pty Ltd filter
  • Cleanaway Solid Waste Pty Ltd (2) Apply Cleanaway Solid Waste Pty Ltd filter
  • Griffin Power Pty Ltd (2) Apply Griffin Power Pty Ltd filter
  • Western Australia Biomass Pty Ltd (2) Apply Western Australia Biomass Pty Ltd filter
  • Albemarle Lithium Pty Ltd (1) Apply Albemarle Lithium Pty Ltd filter
  • Alcoa of Australia Ltd (1) Apply Alcoa of Australia Ltd filter
  • Alcoa World Alumina Australia (1) Apply Alcoa World Alumina Australia filter
  • Bluewaters Power 3 Pty Ltd (1) Apply Bluewaters Power 3 Pty Ltd filter
  • Conservation Commission of Western Australia (1) Apply Conservation Commission of Western Australia filter
  • Deras (Australia) Pty Ltd (1) Apply Deras (Australia) Pty Ltd filter
  • Griffin Electricity Pty Ltd (1) Apply Griffin Electricity Pty Ltd filter
  • Griffin Power 3 Pty Ltd (1) Apply Griffin Power 3 Pty Ltd filter
  • Iluka Resources Ltd (1) Apply Iluka Resources Ltd filter
  • Lanco Resources Australia Pty Ltd (1) Apply Lanco Resources Australia Pty Ltd filter
  • McDougall Quarries Pty Ltd (1) Apply McDougall Quarries Pty Ltd filter
  • Vasse Coal Management Pty Ltd (1) Apply Vasse Coal Management Pty Ltd filter
  • WA Plantation Resources (1) Apply WA Plantation Resources filter
  • Water Corporation (1) Apply Water Corporation filter
  • Wesfarmers Energy Limited (1) Apply Wesfarmers Energy Limited filter
  • Western Australian Land Authority (trading as DevelopmentWA) (1) Apply Western Australian Land Authority (trading as DevelopmentWA) filter

Filter by region:

  • (-) Remove South West filter South West
  1. Home
  2. Proposal search
  3. 37
  4. South West

Albemarle Kemerton Plant

Last updated: November 25, 2024

Albemarle Lithium Pty Ltd (Albemarle) is proposing to stablish the Albemarle Kemerton Plant, a Lithium hydroxide Product manufacturing plant and associated infrastructure, within the Kemerton Strategic Industrial Area (KSIA), approximately 17 kilometres north-east of Bunbury. The Albemarle Kemerton Plant will produce up to 100,000 tonne per annum (tpa) of lithium hydroxide monohydrate (Lithium Hydroxide Product) from five 20,000 tpa process trains and produce up to 1,100,000 tpa of tailings.... Read more...

Kemerton Strategic Industrial Area (KSIA)

Last updated: April 2, 2024

DevelopmentWA is seeking to develop the Kemerton Strategic Industrial Area (KSIA) for the purpose of industrial and infrastructure development as a strategic proposal. The KSIA is located within the Shire of Harvey, 17 kilometres north of Bunbury. The KSIA key characteristics are: Development of the Kemerton Strategic industry Zone (Industry Core) which is approximately 2,024 hectares (ha). There is an approximate 50-year time period for development. Ultimate land use proposed is to be heavy... Read more...

Banksia Road Landfill, Dardanup. Construction and Operation of Landfill Cells 9, 10 and 12A

Last updated: November 21, 2023

The Banksia Road Landfill is located in the Shire of Dardanup approximately 10 kilometres (km) from the City of Bunbury and 3.8 km south-east of the town of Dardanup. The Landfill is currently operating under a Licence issued through Part V of the Environmental Protection Act (Licence - L8904/2015/1) which allows for the acceptance of Liquid Waste; and Class II and Class III putrescible waste. The proposal would be a continuation of the current operations and including the establishment of... Read more...

Worsley Alumina - Efficiency and Growth Increase of Existing Operations to 4.4Mtpa Alumina Production

Last updated: May 16, 2023

Worsley Alumina Pty Ltd (Worsley) proposes to upgrade the Worsley refinery in order to increase production to 4.4 million tonnes per annum (Mtpa). Worsley has approval under Part IV of the, Environmental Protection Act, 1986, for production of 3.7Mtpa, and the refinery currently operates at 3.25Mtpa. Read more...

Southern Extension of Sandpit, Lot 2 Calinup Road, Gelorup, Shire of Capel

Last updated: January 31, 2022

APH Contractors proposes to extract approximately 2.2 million bank cubic metres of sand from 22.87 hectares over a period of 20 years at an annual extraction rate of 100,000 – 120,000 tonnes per year. Sand will be extracted to a maximum depth of 20m Australian Height Datum (AHD). It is proposed that sand extraction will continue from east of Gelorup Hill and move progressively southwards in 18 sand extraction blocks, each between one and two hectares. Embankments will be restored to 1:4 (14o)... Read more...

Silicon Project, Kemerton and Mine at Moora - Revised Proposal

Last updated: August 9, 2021

The original proposal is for mining of silica (quartzite) rock approximately 15 kilometres north of Moora on Mining Lease M70/191, and smelting to produce silicon, employing wood, charcoal, coal and the silica mined at Moora, in the Kemerton Industrial Area approximately 20 kilometres north of Bunbury in the Shire of Harvey. This revised proposal is for an increase from the approved three submerged electric arc furnaces to four submerged electric arc furnaces at the Kemerton site, and the... Read more...

Cleanaway Banksia Road Landfill – New Tailings Storage Cell

Last updated: July 8, 2019

The proposal involves the construction and commissioning of a new tailings storage cell (Cell 12A) for the storage of lithium processing tailings at the Banksia Road Waste Management Facility (Banksia Road WMF) located at Lot 2 on Plan 65861, Crooked Brook in Western Australia (WA). It is proposed that Cell 12A will have the capacity to contain approximately 522,000 tonnes of tailings. Read more...

Wagerup Alumina Refinery - Increase in Production to 4.7 Mtpa; and Wagerup Cogeneration Plant

Last updated: October 15, 2018

Alcoa proposes to expand the Wagerup Refinery through construction of a third production unit. The proposed production increase to approximately 4.7 Mtpa alumina is to be achieved by a combination of new equipment and upgrade of existing equipment in order to achieve an increase in both capacity and efficiency. As the Wagerup Refinery has been subject to previous assessments, this represents a revised proposal pursuant to s 45B of the EP Act. The current maximum production permitted under the... Read more...

Bluewaters Power Station Phase II

Last updated: April 4, 2018

Griffin Power Pty Ltd, proposes to construct and operate a 200MW coal-fired power station known as the Bluewaters Power Station Phase II (Bluewaters II) adjacent to the proposed Bluewaters Power Station (Bluewaters I) on a site located approximately 4km north-east of Collie. It would be a subcritical coal-fired base-load generation facility with a nominal generating capacity of up to 200MW. The Bluewaters II Power Station would supplement the Bluewaters I Power Station and supply electricity... Read more...

Vasse Coal Project

Last updated: December 7, 2016

Read more...

Bluewaters Power Station Expansion - Phase III and Phase IV (s46)

Last updated: May 1, 2015

The proposal is for the construction and operation of two nominal 229 Megawatt (208 Megawatt net sent-out) subcritical coal-fired base-load generation plants (i.e. Bluewaters Power Station Phases III and IV) on a site adjacent to the existing Bluewaters Phase I and Phase II generating plants located approximately 4.5 kilometres north-east of Collie. The proposal is further documented in Ministerial Statement 837 and EPA Report 1349 . This assessment deals with a request for a change to the Time... Read more...

40MW Biomass Power Plant, Manjimup (s. 46)

Last updated: October 2, 2014

The proposal involves the construction and operation of a 40 Megawatt power plant fueled by up to 380,000 tonnes (+/-10%) per annum of, Eucalyptus globulus, (Bluegum) and pine plantation wastes, a pipeline for water supply, and a power line connecting the power plant to the sub-station. Inquiry under s46 in response to a request for extension of timeframe for substantial commencement, condition 3 of Ministerial Statement 791. Read more...

Bunbury Berth 14A Expansion Project

Last updated: June 18, 2014

The proposal is to construct and operate a coal handling and export facility within the Bunbury Port Inner Harbour in the south-west region of Western Australia. Read more...

Wastewater Treatment Plant Stage 1, Chugg street Walpole, Shire of Manjimup

Last updated: February 7, 2014

The Water Corporation of Western Australia proposes to construct, commission, operate and maintain a new wastewater treatment plant (WWTP) on a portion of the C class Crown reserve No. 29778 (Forestry Purposes) on Chugg Street, north-east of the Walpole townsite. That portion of the reserve is predominantly cleared and used as a depot for the Department of Conservation and Land Management. Read more...

Gwindinup Mineral Sands Mine

Last updated: November 24, 2011

The proposal is for the construction and operation of a mineral sands mine at Gwindinup, approximately 25 kilometres south-south-east of Bunbury and between two and ten kilometres south of the town of Boyanup. Read more...

Bluewaters Power Station Expansion - Phase III and Phase IV

Last updated: January 20, 2011

The proposal is for the construction and operation of two nominal 229 Megawatt (208 Megawatt net sent-out) subcritical coal-fired base-load generation plants (i.e. Bluewaters Power Station Phases III and IV) on a site adjacent to the existing Bluewaters Phase I and Phase II generating plants located approximately 4.5 kilometres north-east of Collie. The proposal also involves the construction and operation of an approximately 63 kilometre long wastewater discharge pipeline following the same... Read more...

40MW Biomass Power Plant, Manjimup

Last updated: March 13, 2009

The proposal involves the construction and operation of a 40 Megawatt power plant fuelled by up to 380,000 tonnes (+/-10%) per annum of, Eucalyptus globulus, (Bluegum) and pine plantation wastes, a pipeline for water supply, and a power line connecting the power plant to the sub-station. Read more...

Synthetic Rutile Plants 1 and 2, North Capel (s46)

Last updated: December 4, 2006

Iluka Resources Ltd (Iluka) has sought to update the 1992 Ministerial Statement 291 to reflect the current operating parameters and licence conditions at the North Capel Synthetic Rutile Plants 1 and 2 site via a review of the conditions and commitments in that Ministerial statement. Accordingly, the Minister for the Environment has requested the Environmental Protection Authority (EPA) to consider and provide advice to him under Section 46(6) of the, Environmental Protection Act 1986 Read more...

Silicon Project, Kemerton (s46) [737]

Last updated: May 17, 2006

The proposal is for a silicon smelter at Kemerton and quartzite mine at Moora. Inquiry under s46 to amend the environmental conditions of Ministerial Statement 27 to allow the proponent, on an as-needed basis, to bypass the baghouse and vent furnace off-gases directly to the atmosphere for up to 50 hours per year. Read more...

Gas Fired Co-generation Facility

Last updated: October 19, 2005

Worsley Alumina’s alumina refinery has existing approval for the production of 3.7 million tonnes per anum (Mtpa) of alumina. This proposal is for the construction and operation of a natural gas-fired, co-generation option. The proposal would be implemented in two stages, each consisting of a gas turbine with a nominal generation capacity of 120 MW electrical output and a heat recovery steam generator (HRSG) of nominally 210 MW steam output. The facility would be located at the Worsley alumina... Read more...

Pages

  • 1
  • 2
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.