Last updated: April 7, 2025
Robe River Mining Co. Pty. Ltd is seeking to extend the life of operations at Robe Valley, located 146 km southwest of Karratha, in the Pilbara region of Western Australia. The proposal is a significant amendment to the Approved Proposals (MS 776, MS 1112 and MS 1141) and includes the development of new above and below water table iron ore deposits and associated activities to extend the life of the existing operations at Robe Valley. The proposal includes, but is not limited to: development of... Read more...Last updated: January 24, 2025
The Ridley Magnetite Project (the Proposal) is located approximately 57 km east of Port Hedland. The Proposal is located within a 19,102 ha Development Envelope (DE) with an indicative disturbance footprint (IF) of 8,484 ha. The Proposal is for the mining and processing of iron ore to produce up to 16.5 million tonnes per annum (Mtpa) of magnetite concentrate. The Proposal includes a single pit (below water table), run-of-mine pad, concentrate stockpiles, laydown areas, waste dumps,... Read more...Last updated: November 4, 2024
The Proposal is for the development of the Rhodes Ridge Iron Ore Project (the Proposal), located approximately 40 kilometres north-west of Newman, in the Shire of East Pilbara. The Proposal requires a disturbance footprint of up to 14,850 hectares within a 61,301 hectares Development Envelope. The Proposal includes the development of new above and below water table deposits, and associated activities. The proposal includes but is not limited to: development of new deposits including above and... Read more...Last updated: January 29, 2024
The Shire of Broome propose to develop a Class III landfill, leachate management system and asbestos monocell at the Regional Resource Recovery Park (RRRP). The RRRP is located at Lot 550 on the Broome-Cape Leveque Rd, 12km northeast of the Broome town centre. Read more...Last updated: December 22, 2023
Rio Tinto Winu Pty Limited (the Proponent) proposes to develop the Winu Project (the Proposal). The Proposal is a new copper-gold mine located approximately 300 km south of Broome and 320 km east of Port Hedland in the northern Pilbara region of Western Australia within both the Nyangumarta people’s and the Martu people’s Native Title Determination Areas. The Proposal conceptual footprint will require the clearing of up to 4,868 ha of native vegetation within a proposed 37,344 ha Development... Read more...Last updated: June 26, 2023
Inquiry into implementation Condition 10 (Terrestrial and Marine Quarantine Management System), Condition 16 (Long-term Marine Turtle Management Plan) and Condition 25 (Coastal Stability Management and Monitoring Plan) to ensure that they are effective and reflect a contemporary outcome-based condition setting. It is noted a preceding Section 46 inquiry into Ministerial 800 (dated 11-03-2023) has been requested by the Minister for Environment in relation to Conditions 9, and 15 (Inquiry 1).... Read more...Last updated: October 25, 2021
Main Roads Western Australia (Main Roads) is proposing to build the Swan River Crossings (the Proposal) that includes the construction of new road and rail bridges, the upgrading of the existing rail bridge and the demolition of the existing Fremantle Traffic Bridge in Fremantle, Western Australia. The proposals location includes the Road and rail corridor along Queen Victoria Street, Fremantle from Tydeman Road in the north to Canning Highway south of the Swan River. And the eastern side of... Read more...Last updated: September 14, 2021
Hastings Technology Metals Ltd propose to expand the existing approved Yangibana Rare Earths Project, a Rare Earth Elements mine which includes on site processing and associated infrastructure. The expansion involves mining from two additional pits (Yangibana and Auer) and one larger amalgamated pit (Bald Hill-Simon’s Find-Fraser’s). The proposal is located approximately 270 kilometres east-north-east of Carnarvon in the Shire of Upper Gascoyne. The proposal would include total disturbance of... Read more...Last updated: May 18, 2020
Changes to condition 2 (Proponent Commitments), condition 4 (Compliance Audit and Performance Review), condition 5 (Decommissioning Plan), condition 6, (Review of Options for the Transport of Solid Sodium Cyanide), condition 7 (Transport of Solid Sodium Cyanide), condition 8 (Transport of Liquid Sodium Cyanide), condition 9 (Noise Management), condition 10 (Emissions Verification) and condition 11 (Cyanide Monitoring). Read more...Last updated: April 14, 2020
Eastern Metropolitan Regional Council propose to construct and operate a Community Recycling Centre (CRC) and Waste Transfer Station (WTS) within the existing Hazelmere Resource Recovery Park, at Lots 814, 100 and 301 Lakes Road Hazelmere, in the City of Swan. The CRC would be accepting a range of materials for reuse, recycling and disposal from community members, while the WTS would provide for the short-term storage capacity for consolidation of various waste streams including refuse and food... Read more...Last updated: February 10, 2020
GrainCorp Liquid Terminals Australia Pty Ltd proposes to construct and operate a bulk liquids terminal at Lot 108 Kwinana Beach Road, Kwinana Beach within the Kwinana Strategic Industrial Area. The proposal would involve disturbance of approximately 2.7 hectares and site activities include the transfer and storage of bulk liquids including urea ammonium nitrate liquid fertiliser solution, tallow, vegetable and used cooking oils, industrial solvent, and caustic soda 33%. Read more...Last updated: October 28, 2019
The Commissioner of Main Roads is proposing to upgrade the section of Tonkin Highway between Guildford Road (Bayswater) and the Great Eastern Highway (Belmont). The key components of the project are: construction and operation of two new bridges over the Swan River road widening, reconfiguration, and modification of existing interchanges construction and operation of on/off ramps and collector distributor roads connectivity of the principal shared path to and along Tonkin Highway. The proposal... Read more...Last updated: April 15, 2019
The proponent, Kelliher Bros. plan to expand their grass-fed beef production business from 6 weeks a year to year-round grazing. To achieve this, the proponent would like to trial the installation of a single 40 ha centre pivot irrigator for irrigating pasture within an area of Lot 209 Paterson Road, Ravenswood (88 ha). The proposal occurs within the, Environmental Protection Peel Inlet - Harvey Estuary Policy 1992, policy area. Read more...Last updated: March 5, 2019
DBNGP (WA) Nominees Pty Limited propose to construct 670m of underground natural gas pipeline between the Albemarle Kemerton Plant (a lithium hydroxide manufacturing plant) and the existing Dampier to Bunbury Natural Gas Pipeline. The proposal is located in Kemerton, approximately 17km north-east of Bunbury and will provide natural gas to the Albemarle Kemerton Plant (Ministerial Statement No. 1085) . The proposed pipeline will be constructed within a 30m wide corridor requiring clearing of 2.... Read more...Last updated: February 4, 2019
The Shire of Ashburton is proposing the development of a new regional waste management facility located on undeveloped land at 150 Onslow Road, Talandji, approximately 36 km south of Onslow. The Pilbara Waste Management Facility will provide a range of waste management services including sustainable initiatives such as material reuse, recycling and recovery as well as treatment and disposal. The facility will include: - Class IV Landfill; - Bulk Waste Area including: Green... Read more...Last updated: April 9, 2018
City of Busselton proposes to construct a new route into Busselton. The proposal involves the development of a new two-lane road and bridge linking Causeway Road to Cammilleri Street, including a new bridge over the Vasse river. Disturbance associated with the proposal would include construction on the banks of the Vasse River and removal of 0.56 hectares of native vegetation. Read more...Last updated: January 23, 2017
Request from the Minister of Environment to amend conditions of Ministerial Statement 24. Read more...Last updated: December 7, 2016
The proposal is to clear some portion of Kent Location 1858 for agricultural purposes. The exact area of proposed clearing has changed as the proponent has made further submissions to the State Administrative Tribunal. It is understood that the proponent’s current application is to clear approximately 65 hectares of native vegetation. Read more...