Last updated: May 12, 2025
Woodside Energy Ltd has provided a combined document that relates to both its Commonwealth referral (Environment Protection and Biodiversity Act 1999) and State referral (Environmental Protection Act 1986). The component within State Waters includes drilling and completion, installation, commissioning, operation, well repair and workover and decommissioning of subsea wells and associated infrastructure located in Western Australian State waters, to extract hydrocarbons from the Torosa reservoir... Read more...Last updated: November 25, 2024
The construction of facilities for the development of the Greater Gorgon Gas Fields on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on Barrow Island. Read more...Last updated: November 25, 2024
The Proposal is to construct and operate a 25 million tonne per annum Liquefied Natural Gas (LNG) facility and associated Domestic Gas (Domgas) facility in the proposed Ashburton North Strategic Industrial Area (ANSIA) 12 kilometres south west of the town of Onslow. Read more...Last updated: April 16, 2024
Inquire into implementation Condition 9 (Quarantine Expert Panel) and Condition 15 (Marine Turtle Expert Panel) to ensure that they are effective and act as an independent advisory group for the Minister for Environment and the proponent on matters relating to terrestrial and marine quarantine and marine turtle monitoring and management. It is noted that a second Section 46 inquiry into Ministerial 800 (dated 11-04-2023) has also been requested by the Minister for Environment in relation to... Read more...Last updated: June 26, 2023
Inquiry into implementation Condition 10 (Terrestrial and Marine Quarantine Management System), Condition 16 (Long-term Marine Turtle Management Plan) and Condition 25 (Coastal Stability Management and Monitoring Plan) to ensure that they are effective and reflect a contemporary outcome-based condition setting. It is noted a preceding Section 46 inquiry into Ministerial 800 (dated 11-03-2023) has been requested by the Minister for Environment in relation to Conditions 9, and 15 (Inquiry 1).... Read more...Last updated: June 14, 2022
The Proposal would include the following activities: shore crossing site preparation including installation of temporary facilities along the shoreline at the Pluto LNG Facility to facilitate the installation of the trunkline in shallower depths preparation works associated with the installation of the trunkline including dredging and associated spoil disposal at existing spoil grounds trunkline installation (about 32.7 kilometres long within State waters) shore crossing site reinstatement rock... Read more...Last updated: February 2, 2022
Conditions 6-12, 9-1 to 9-5 inclusive, and 12-1 to 12-8 inclusive of Ministerial Statement 873 are to be removed from the statement and conditions 9-1 to 9-5 inclusive and conditions 12-1 to 12-8 inclusive are to be transferred into a new ministerial statement. The change will facilitate the transfer of conditions relevant to the operation of port facilities from Chevron Australia Pty Ltd to the Pilbara Ports Authority via this new Ministerial Statement. Read more...Last updated: December 21, 2016
Note: In the matter of The Wilderness Society of WA (Inc) –v- Minister for Environment [2013] WASC, the Supreme Court of Western Australia found the Minister’s agreement decision invalid because the EPA’s decision to report was invalid., The proposal is a strategic environmental assessment for a common user LNG hub precinct for future Browse Basin gas processing in the Kimberley Region. Read more...Last updated: April 30, 2015
To expand the liquefied natural gas (LNG) production capacity of the existing proposal from 15 million tonnes per annum (Mtpa) to 20 Mtpa (nominal). Read more...Last updated: January 17, 2012
The proposal is to construct a sub sea pipeline, onshore gas treatment and compression plant, and sales gas pipeline. The subsea pipeline from the Macedon Gas Field (100 kilometres west of Onslow) connects to the onshore gas treatment and compression plant at Ashburton North (15 kilometres southwest of Onslow). The sales gas pipeline connects the onshore facility to the Dampier to Bunbury Natural Gas (DBNG) Pipeline. Read more...Last updated: February 11, 2000
Woodside Energy Limited proposes to construct and operate additional Liquefied Natural Gas (LNG) processing trains, the current proposal being for two trains with a total additional capacity of 8 Mtpa at its onshore gas plant on the Burrup. Read more...Last updated: January 18, 1999
Apache Northwest Pty Ltd proposes to drill two exploration wells, Chelonia-1 and -2 in Permit Area EP 342 which is located at the head of Exmouth Gulf. Both wells will have the same surface location, situated outside the Ningaloo Marine Park, approximately 100 m from the boundary and 4 km to the SSW of South Muiron Island. Read more...Last updated: July 14, 1998
The Proposal is to install a second undersea gas trunk line from the existing offshore Goodwin/North Rankin production platforms to a new terminal located in the existing onshore treatment plant at Withnell Bay on the Burrup Peninsula. Read more...Last updated: April 6, 1992
Proposal by Minora Resources NL for drilling within petroleum exploration permit area EP 325, situated in the Exmouth Gulf Area. Read more...Last updated: January 7, 1992
Mobil Exploration and Producing Australia Pty Ltd has taken over as operator or a proposed offshore exploration drilling program for petroleum within permit area EP-325 within the Exmouth Gulf. This proposal seeks environmental approval for the drilling of exploration wells within three areas known as Cassidy, Cody and Spider. Read more...Last updated: December 10, 1991
Proposal to develop the Roller Oilfield within permit area TP/3 Part 1, specifically the drilling of a minimum of seven development wells from four monopod structures. Read more...Last updated: October 25, 1991
Western Australian Petroleum Pty Ltd (WAPET) is operator for the participants in Exploration Permit No. TP/3 Part 1. WAPET has already drilled some 18 wells within the Permit Area, has developed the Saladin, Cowle and Yammaderry oilfields and is currently seeking approval to develop the Roller Oilfield. Over the next five year period, WAPET proposes to drill a further four to twelve exploratory wells within Permit Area TP/3 Part 1. Read more...Last updated: April 26, 1991
LASMO Oil (Australia) has proposed an offshore exploration drilling program for petroleum within its permit areas EP-342 and TP/9 at the open end of Exmouth Gulf. This proposal seeks environmental approval for the drilling of two wells in 1991 followed by a minimum of three others over the period 1992-1994. Read more...Last updated: June 27, 1989
Minora Resources NL has submitted a proposal to drill a third exploration oil well in its lease, EP 325, Exmouth Gulf. The well is located 13 km south east of the town of Exmouth. Minora propose to use a jack-up rig and drilling would take about 24 days to complete. Drilling is proposed during the winter of 1989. Read more...