Last updated: May 2, 2025
The Proposal is to extend and redevelop the existing Army Groyne into a barge operations facility in South Thomson Bay at Wadjemup / Rottnest Island. The Proposal includes: Dredging for the purpose of construction for a breakwater/laydown area and for a barge turning circle. Use of dredge spoil for re-use as reclamation to create a laydown area. Extension of the existing Army Groyne to create a breakwater. Barge landing ramp. Ferry berth. Small craft landing facility. Fuel storage and... Read more...Last updated: April 14, 2025
The proposal is to source marine sands from Cambridge Gulf, north of Wyndham in northeast Western Australia, for export to overseas construction projects. The proposal is a vessel-based marine operation with a lifespan of up to 15 years. It does not involve the construction and operation of any shore-based facilities. The operation will involve a Sand Production Vessel (SPV) based generally on the design of a large Trailer Suction Hopper Dredger (TSHD). The proposed operational area (POA) is... Read more...Last updated: February 17, 2025
Gascoyne Gateway Ltd proposes to build, own and operate a multipurpose marine complex in Exmouth that will service a variety of vessels including but not limited to cruise liners and associated ecotourism activities, Defence and marine supply vessels. The project will not be utilised for livestock or iron ore. The Proposal site is located 10 kilometres south of the Exmouth township and immediately south of the Ingram Street light industrial area; opposite the Exmouth landfill site and to the... Read more...Last updated: February 11, 2025
Smiths 2014 Pty Ltd proposes to develop Lot 4131 Smiths Beach Road, Yallingup (City of Busselton) into a coastal tourism village, including: Hotel accommodation and wellness centre Campground 61 holiday homes Community hub and café Surf Lifesaving Club facilities and beach ramp The proposal is located at the southern end of Smiths Beach, adjacent to the Leeuwin Naturaliste National Park. The total proposed development envelope is 40.53 hectares (ha). The major elements of the proposal include:... Read more...Last updated: February 7, 2025
Saracen Properties Pty Ltd (representing 5 Star Margaret River Pty Ltd and The Beach Village Pty Ltd) proposes to develop various lots along Wallcliffe Road Gnarabup for a 121 room five star resort, and beach village comprising of short-stay accommodation, residential dwellings and commercial premises. The proposal development envelope is 8.11 hectares. The proposal is located on the western side of Wallcliffe Road, Gnarabup Beach. Following the seven day public comment period and consideration... Read more...Last updated: February 4, 2025
The Proposal is to construct and operate a new multimodal port in the Kwinana Industrial Area (KIA), approximately 30 km south of Perth. The Proposal includes: A port facility. Adjacent areas of landside development. An offshore breakwater. Dredging for a second main channel. Dredging for access channels, turning basins and berthing areas. Use of dredge material for beneficial re-use and, where required, placement in approved marine placement areas. Removal of the disused Kwinana Bulk Berth 1 (... Read more...Last updated: January 24, 2025
The Ridley Magnetite Project (the Proposal) is located approximately 57 km east of Port Hedland. The Proposal is located within a 19,102 ha Development Envelope (DE) with an indicative disturbance footprint (IF) of 8,484 ha. The Proposal is for the mining and processing of iron ore to produce up to 16.5 million tonnes per annum (Mtpa) of magnetite concentrate. The Proposal includes a single pit (below water table), run-of-mine pad, concentrate stockpiles, laydown areas, waste dumps,... Read more...Last updated: January 24, 2025
The Proposal will use combined onshore wind and solar energy of approximately 5.2 gigawatt (GW) capacity to produce green hydrogen which will be converted to an estimated 2 Million tonnes per annum (Mtpa) of green ammonia for export to emerging green energy markets. The Proposal is located within the Shire of Northampton, Western Australia (WA), approximately 20 km north of Kalbarri. The Proposal comprises the following major components: a wind and solar farm with a combined installed capacity... Read more...Last updated: January 21, 2025
Perdaman Chemicals and Fertilisers Pty Ltd intends to construct and operate a urea plant with a production capacity of approximately 2 million tonnes per annum (Mtpa) on Sites C and F within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula. Both sites are located adjacent to the Murujuga National Park. The EPA considered the Study of the Cumulative Impacts of Air Emissions in the Murujuga Airshed in its assessment of the Perdaman Urea Project. Read more...Last updated: November 25, 2024
The Western Green Energy Hub is a proposal to design, construct and operate a large-scale wind and solar power project to produce value added products, with the base case assuming green ammonia production. The proposal is situated on WA Mirning Native Title determined land in the far southeast of Western Australia in the Shire of Dundas and City of Kalgoorlie-Boulder, to the northwest of Eucla in the South Coast Region. The proposal will be located on Unallocated Crown Land and pastoral leases... Read more...Last updated: July 4, 2024
Time limit for substantial commencement, review of the adequacy of existing implementation conditions to ensure consistency with the EPA’s current objectives for each environmental factor. Read more...Last updated: May 9, 2024
The proposal is for the development of eco-friendly tourism accommodation including holiday units, a restaurant/function centre, and associated facilities, at Lot 660 La Perouse Court, Goode Beach. The proposed development envelope is 7.71 hectares (ha) and includes a 2.23 ha clearing footprint, a 0.402 ha wastewater reticulation zone, and a 5.02 ha conservation area. The proposal is located approximately 50m west of the Goode Beach foreshore and immediately east of Lake Vancouver, a... Read more...Last updated: February 19, 2024
The requested change relates to condition 3 of Ministerial Statement 1056 (as relevant to Ministerial Statement 891) for an extension to the Time Limit for Proposal Implementation for the proposal approved under MS 891. With the agreement of the proponent, the Environmental Protection Authority will take no further action in relation to the s.46 inquiry into the proposed changes to condition 3 of Ministerial Statement 1056 (as relevant to Ministerial Statement 891) Read more...Last updated: February 5, 2024
Province Resources Ltd propose to use combined onshore wind and solar energy to produce green hydrogen and ammonia for export to the green energy market. The proposal is distributed across 3 distinct locations within the Shire of Carnarvon, Western Australia. The proposal will comprise the following major elements: • up to 945 ha (6.8 GW) of wind turbines and up to 10,000 ha of solar arrays (5.2 GW) • a new multiuser port facility with a material offloading facility and export terminal •... Read more...Last updated: September 4, 2023
K plus S Salt Australia Pty Ltd is seeking approval to construct and operate a 3.5 million tonnes per annum (Mtpa) Solar Salt Project located approximately 40 km south-west of the township of Onslow, within the Shire of Ashburton. Read more...Last updated: July 31, 2023
The proposal will provide additional port facilities at Port Hedland to receive and stockpile the product from emerging miners, specifically the various mines owned by the proponent’s shareholders, and load this product onto ships for export. Each of the shareholders is exploring and developing new iron ore projects in the Pilbara, with one company actively mining ore and exporting through the existing facilities in the Port of Port Hedland. The current shareholders of the proponent are Atlas... Read more...Last updated: July 31, 2023
The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. Inquiry under s46 in response to a request to change condition 3 - Time Limit for Proposal Implementation of Ministerial Statement 891 . This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...Last updated: June 9, 2021
VBX Limited propose to develop a bauxite mine located approximately 15 km west of the town of Kalumburu in the Kimberley. The proposal involves the mining of bauxite in the Kimberley and the use of a conveyor to transport processed ore to a barge-loading facility in Napier Broome Sound, and then trans-shipping of ore. Read more...Last updated: May 25, 2021
The proposal is to construct industrial infrastructure and a Southern Harbour in Jervoise Bay south of the Northern Harbour precinct and including the Marine support facility. Read more...Last updated: June 29, 2020
Subsea 7 proposes to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35km south of the Exmouth Townsite. A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields. The onshore pipeline fabrication site and associated infrastructure includes two Bundle tracks (approximately 10 km in length) along which the Bundles will be constructed... Read more...