Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • (-) Remove Oil and gas filter Oil and gas
  • Infrastructure (8) Apply Infrastructure filter
  • Industrial (1) Apply Industrial filter

Filter by current status:

  • (-) Remove Ministerial Statement published filter Ministerial Statement published

Filter by preliminary environmental factors:

  • Marine Environmental Quality (12) Apply Marine Environmental Quality filter
  • 37 (10) Apply 37 filter
  • Benthic Communities and Habitats (10) Apply Benthic Communities and Habitats filter
  • Flora and Vegetation (10) Apply Flora and Vegetation filter
  • Marine Fauna (9) Apply Marine Fauna filter
  • Social Surroundings (9) Apply Social Surroundings filter
  • Terrestrial Fauna (9) Apply Terrestrial Fauna filter
  • Coastal Processes (3) Apply Coastal Processes filter
  • Terrestrial Environmental Quality (3) Apply Terrestrial Environmental Quality filter
  • 3144 (2) Apply 3144 filter
  • Subterranean Fauna (2) Apply Subterranean Fauna filter
  • Hydrological Processes (1) Apply Hydrological Processes filter
  • Landforms (1) Apply Landforms filter

Filter by Proponent:

  • Chevron Australia Pty Ltd (10) Apply Chevron Australia Pty Ltd filter
  • West Australian Petroleum Pty Ltd (3) Apply West Australian Petroleum Pty Ltd filter
  • Woodside Energy Ltd (3) Apply Woodside Energy Ltd filter
  • Apache Northwest Pty Ltd (2) Apply Apache Northwest Pty Ltd filter
  • Western Mining Corporation Ltd (2) Apply Western Mining Corporation Ltd filter
  • Woodside Offshore Petroleum Pty Ltd (2) Apply Woodside Offshore Petroleum Pty Ltd filter
  • AGI Development Group Nominees Pty Ltd (AGID) (1) Apply AGI Development Group Nominees Pty Ltd (AGID) filter
  • Ampolex Ltd (1) Apply Ampolex Ltd filter
  • Apache Energy Ltd (1) Apply Apache Energy Ltd filter
  • BHP Billiton Petroleum Pty Ltd (1) Apply BHP Billiton Petroleum Pty Ltd filter
  • BHP Petroleum Pty Ltd and Dora! Resources N. L. (1) Apply BHP Petroleum Pty Ltd and Dora! Resources N. L. filter
  • Chevron Australia (1) Apply Chevron Australia filter
  • Chevron Australia Pty Ltd (for original proposal) (1) Apply Chevron Australia Pty Ltd (for original proposal) filter
  • Command Petroleum Holdings NL (1) Apply Command Petroleum Holdings NL filter
  • Dampier to Bunbury Natural Gas Pipeline (WA) Nominees Pty Limited (1) Apply Dampier to Bunbury Natural Gas Pipeline (WA) Nominees Pty Limited filter
  • DBP Development group Nominees Pty Ltd (1) Apply DBP Development group Nominees Pty Ltd filter
  • DDG Operations Pty Ltd (1) Apply DDG Operations Pty Ltd filter
  • Doral Resources NL (1) Apply Doral Resources NL filter
  • Mobil Australia Resources Company Pty Ltd (1) Apply Mobil Australia Resources Company Pty Ltd filter
  • Normandy Pipeiines Pty Ltd and BHP Minerals Pty Ltd (1) Apply Normandy Pipeiines Pty Ltd and BHP Minerals Pty Ltd filter
  • WAPET Pty Ltd (1) Apply WAPET Pty Ltd filter
  • Wesminco Oil Pty Ltd (1) Apply Wesminco Oil Pty Ltd filter
  • Woodside Energy (1) Apply Woodside Energy filter
  • Woodside Energy Ltd (1) Apply Woodside Energy Ltd filter

Filter by region:

  • (-) Remove Pilbara filter Pilbara
  1. Home
  2. Proposal search
  3. Oil and gas
  4. Pilbara
  5. Ministerial Statement published

Wheatstone Development Proposal (S46) [2178]

Last updated: July 4, 2025

Conditions 6-12, 9-1 to 9-5 inclusive, and 12-1 to 12-8 inclusive of Ministerial Statement 873 are to be removed from the statement and conditions 9-1 to 9-5 inclusive and conditions 12-1 to 12-8 inclusive are to be transferred into a new ministerial statement. The change will facilitate the transfer of conditions relevant to the operation of port facilities from Chevron Australia Pty Ltd to the Pilbara Ports Authority via this new Ministerial Statement. Read more...

Gorgon Gas Development Revised and Expanded Proposal: Barrow Island Nature Reserve

Last updated: November 25, 2024

The construction of facilities for the development of the Greater Gorgon Gas Fields on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on Barrow Island. Read more...

Pluto LNG Development (Site B Option), Burrup Peninsula

Last updated: November 25, 2024

The construction of facilities for the development of the Pluto Gas Field on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on the Burrup Peninsula. Extensive dredging will be undertaken adjacent to the export facility. Read more...

Wheatstone Development - Gas Processing, Export Facilities and Infrastructure

Last updated: November 25, 2024

The Proposal is to construct and operate a 25 million tonne per annum Liquefied Natural Gas (LNG) facility and associated Domestic Gas (Domgas) facility in the proposed Ashburton North Strategic Industrial Area (ANSIA) 12 kilometres south west of the town of Onslow. Read more...

Pluto Liquified Natural Gas Development (Site B Option) (S46) [2299]

Last updated: August 15, 2023

Inquire into and report on the matter of changing condition 12 of Ministerial Statement 757 to align it with contemporary greenhouse gas conditions reflecting the content of the Pluto LNG Facility Greenhouse Gas Abatement Program. Read more...

Tubridgi Gas Field Development, near Onslow (S46) [2292]

Last updated: August 15, 2023

Change to condition 1 commitment 1, updating the commitment to be in line with requirements under the Aboriginal Heritage Act 1972 and the Heritage Agreement in place between AGID and the local Traditional Owners (Buurabalayji Thalanyji Aboriginal Corporation (BTAC)). Read more...

Wheatstone Development – Gas Processing, Export Facilities and Infrastructure (s46) [2143]

Last updated: April 19, 2023

Read more...

Jansz Feed Gas Pipeline Barrow Island Nature Reserve

Last updated: October 24, 2022

The Jansz feed gas pipeline is proposed to supply natural gas from the Jansz/Io field located in Commonwealth waters approximately 200km off the Pilbara coast of Western Australia and pipe it across the Barrow Island Nature Reserve to the Gorgon Gas Treatment Plant on Barrow Island. Read more...

Jansz Feed Gas Pipeline, Gorgon Gas Development Revised and Expanded Proposal, Additional Construction Laydown and Operations Support Area, and Gorgon Gas Development Fourth Train Expansion Proposals (S46) [2327]

Last updated: October 19, 2022

Adequacy of the existing implementation conditions of the above mentioned Ministerial Statements with respect to avoiding, reducing and offsetting greenhouse gas emissions. Read more...

Scarborough Project Nearshore Component

Last updated: June 14, 2022

The Proposal would include the following activities: shore crossing site preparation including installation of temporary facilities along the shoreline at the Pluto LNG Facility to facilitate the installation of the trunkline in shallower depths preparation works associated with the installation of the trunkline including dredging and associated spoil disposal at existing spoil grounds trunkline installation (about 32.7 kilometres long within State waters) shore crossing site reinstatement rock... Read more...

Gas Pipeline from Griffin Oilfield to Mainland Facility near Onslow (S46) [2221]

Last updated: July 23, 2020

Change to condition 1 commitment 39 of Ministerial Statement 308 in order to consider the change of distance to the nearest sensitive receptor. Read more...

Gorgon Gas Development Revised and Expanded Proposal (s. 46) [2161]

Last updated: May 29, 2020

Section 46 - request for a change to Environmental Conditions: Inquire into the commencement of Condition 26 (Reservoir Carbon Dioxide Injection System) of Ministerial Statement 800. Read more...

Pluto North West Shelf Interconnector Pipeline

Last updated: November 21, 2019

The Proposal is to construct and operate the Pluto to Northwest Shelf Interconnector, a 3.3 km long, steel buried natural gas pipeline, connecting the Pluto Interconnector Compressor Station to the Karratha Gas Plant which is operated by Woodside on behalf of the North West Shelf Project participants, located on the Burrup Peninsula in the North of Western Australia. The proposal will require the clearing of an estimated 10.69 ha.3.26 ha within the Karratha Gas Plant Lease and Buffer Zone Lease... Read more...

Gas pipeline from Griffin oilfield to mainland facility, near Onslow

Last updated: September 16, 2019

The proposal is to develop the Griffin oilfield which is located 68km offshore from Onslow. The oilfield will be developed using a floating production, storage and offloading facility and both oil and gas will be produced. The gas will be recovered and transported to the mainland via a submarine and onshore pipeline to a gas treatment plant and then on to the Dampier-Perth gas pipeline. This assessment comprises the portion of the offshore pipeline in State waters, bringing gas onshore to the... Read more...

Gorgon Gas Development Fourth Train Expansion Proposal

Last updated: April 30, 2015

To expand the liquefied natural gas (LNG) production capacity of the existing proposal from 15 million tonnes per annum (Mtpa) to 20 Mtpa (nominal). Read more...

Gorgon Gas Development - Additional Construction Laydown and Operations Support Area

Last updated: April 2, 2014

Chevron Australia Pty Ltd proposes to clear an additional 32 hectares of land within a 36 hectare development envelope on Barrow Island. The clearing is for the purposes of an additional construction laydown and operations support area, required to support the construction and operation of the Gorgon Gas Development referred to in Ministerial Statement 800 dated 10 August 2009 and Ministerial Statement 865 dated 8 June 2011. Read more...

Gorgon Gas Development Barrow Island Nature Reserve

Last updated: June 26, 2013

Chevron Australia Pty Ltd, as operator for the Gorgon Joint Venturers, proposes to extract, pipe, liquefy and export 10 million tonnes per annum of natural gas from the Greater Gorgon and Jansz gas fields using facilities offshore and on Barrow Island, Western Australia. Read more...

Wheatstone Development (s. 46) [1960]

Last updated: January 30, 2013

The proposal is to construct and operate a 25 million tonne per annum Liquefied Natural Gas (LNG) facility and associated Domestic Gas (Domgas) facility in the proposed Ashburton North Strategic Industrial Area (ANSIA) 12 kilometres south west of the town of Onslow. The proposal includes: Subsea gas trunkline to bring produced hydrocarbons onshore to the LNG and Domgas plants; Product loading facility (PLF); Materials offloading facility (MOF); LNG and Domgas plants; Accommodation facilities;... Read more...

Wheatstone Development (s. 46) [1956]

Last updated: January 11, 2013

The proposal is to construct and operate a 25 million tonne per annum Liquefied Natural Gas (LNG) facility and associated Domestic Gas (Domgas) facility in the proposed Ashburton North Strategic Industrial Area (ANSIA) 12 kilometres south west of the town of Onslow. The proposal includes: Subsea gas trunkline to bring produced hydrocarbons onshore to the LNG and Domgas plants; Product loading facility (PLF); Materials offloading facility (MOF); LNG and Domgas plants; Accommodation facilities;... Read more...

Macedon Gas Development

Last updated: January 17, 2012

The proposal is to construct a sub sea pipeline, onshore gas treatment and compression plant, and sales gas pipeline. The subsea pipeline from the Macedon Gas Field (100 kilometres west of Onslow) connects to the onshore gas treatment and compression plant at Ashburton North (15 kilometres southwest of Onslow). The sales gas pipeline connects the onshore facility to the Dampier to Bunbury Natural Gas (DBNG) Pipeline. Read more...

Pages

  • 1
  • 2
  • 3
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.