ProjectProponent: BHP Petroleum Pty Ltd and Dora! Resources N. L.Proposal description: The proposal is to develop the Griffin oilfield which is located 68km offshore from Onslow. The oilfield will be developed using a floating production, storage and offloading facility and both oil and gas will be produced. The gas will be recovered and transported to the mainland via a submarine and onshore pipeline to a gas treatment plant and then on to the Dampier-Perth gas pipeline. This assessment comprises the portion of the offshore pipeline in State waters, bringing gas onshore to the processing plant on Urala Station and the overland portion of the pipe which joins the Dampier-Perth main gas pipe. Oil production is in Commonwealth waters is not covered by this assessment. Assessment Number: 734Region: PilbaraReferred under EP Act: s38Industry sector: Oil and gasLast updated: September 16, 2019Current Status: Ministerial Statement published 2. Decision on whether to assess this proposalChair's Determination: Consultative Environmental ReviewDate published: Saturday, 13 June, 1992 3. AssessmentScopingApproved: Friday, 21 August, 1992 Environmental ReviewPublic submissions: Monday, 2 November, 1992 to Monday, 30 November, 1992Environmental Review documentation: Consultative Environmental Review document - Volume 1 (PDF, 14.58 MB) Consultative Environmental Review document - Volume 2 (PDF, 11.97 MB) 4. EPA Report on assessmentEPA Report Number: 674EPA Report: Gas pipeline from Griffin oilfield to mainland facility, near Onslow (PDF, 1.07 MB)Key Environmental Factors: Marine Environmental QualityLandLandformsTerrestrial Environmental QualityDate published: Friday, 22 January, 1993 5. Decision on proposal and implementation of proposalMinisterial StatementDate of approval: Wednesday, 17 March, 1993Ministerial Statement: Ministerial Statement 308.pdf (PDF, 319.82 KB) Post-assessment changesSection 46 inquiry: Gas Pipeline from Griffin Oilfield to Mainland Facility near Onslow (S46) [2221]