Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • (-) Remove Infrastructure filter Infrastructure
  • Iron Ore (6) Apply Iron Ore filter
  • Industrial (2) Apply Industrial filter
  • Oil and gas (2) Apply Oil and gas filter

Filter by current status:

  • Ministerial Statement published (16) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (2) Apply Decision on whether to assess has been published filter
  • Assessment has been terminated under s40A of the EP Act (1) Apply Assessment has been terminated under s40A of the EP Act filter

Filter by relevant environmental factors:

  • (-) Remove Marine Fauna filter Marine Fauna
  • Marine Environmental Quality (14) Apply Marine Environmental Quality filter
  • Benthic Communities and Habitats (13) Apply Benthic Communities and Habitats filter
  • Flora and Vegetation (11) Apply Flora and Vegetation filter
  • Social Surroundings (8) Apply Social Surroundings filter
  • Terrestrial Fauna (7) Apply Terrestrial Fauna filter
  • 37 (5) Apply 37 filter
  • Coastal Processes (4) Apply Coastal Processes filter
  • Inland Waters Environmental Quality (4) Apply Inland Waters Environmental Quality filter
  • Hydrological Processes (3) Apply Hydrological Processes filter
  • Inland Waters (2) Apply Inland Waters filter
  • Landforms (2) Apply Landforms filter
  • Subterranean Fauna (2) Apply Subterranean Fauna filter
  • Terrestrial Environmental Quality (2) Apply Terrestrial Environmental Quality filter
  • 3144 (1) Apply 3144 filter

Filter by Proponent:

  • Forge Resources Swan Pty Ltd (2) Apply Forge Resources Swan Pty Ltd filter
  • Leichhardt Industrials Pty Ltd (2) Apply Leichhardt Industrials Pty Ltd filter
  • API Management Pty Limited (1) Apply API Management Pty Limited filter
  • API Management Pty Ltd (1) Apply API Management Pty Ltd filter
  • Australian Methanol Company Pty Ltd (1) Apply Australian Methanol Company Pty Ltd filter
  • Australian United Steel Industry Pty Limited (1) Apply Australian United Steel Industry Pty Limited filter
  • BHP Billiton Iron Ore (1) Apply BHP Billiton Iron Ore filter
  • BHP Billiton Petroleum Pty Ltd (1) Apply BHP Billiton Petroleum Pty Ltd filter
  • Korean Steel Pty Ltd (1) Apply Korean Steel Pty Ltd filter
  • Onslow Infraco Pty Ltd (1) Apply Onslow Infraco Pty Ltd filter
  • Onslow Marine Support Base Pty Ltd (1) Apply Onslow Marine Support Base Pty Ltd filter
  • Port Hedland Port Authority (1) Apply Port Hedland Port Authority filter
  • Robe River Iron Associates (1) Apply Robe River Iron Associates filter
  • Shire of Ashburton (1) Apply Shire of Ashburton filter
  • Subsea 7 Australia Contracting PTY LTD (1) Apply Subsea 7 Australia Contracting PTY LTD filter
  • Z1Z Resorts Pty Ltd (1) Apply Z1Z Resorts Pty Ltd filter

Filter by region:

  • (-) Remove Pilbara filter Pilbara

Filter by last updated:

  • 2025 (1) Apply 2025 filter
  • 2024 (2) Apply 2024 filter
  • 2023 (1) Apply 2023 filter
  • 2022 (1) Apply 2022 filter
  • 2020 (2) Apply 2020 filter
  • 2019 (2) Apply 2019 filter
  • 2018 (2) Apply 2018 filter
  • 2013 (1) Apply 2013 filter
  • 2012 (2) Apply 2012 filter
  • 2008 (1) Apply 2008 filter
  • 2007 (1) Apply 2007 filter
  • 2002 (1) Apply 2002 filter
  • 1998 (1) Apply 1998 filter
  • 1996 (1) Apply 1996 filter
  1. Home
  2. Proposal search
  3. Pilbara
  4. Marine Fauna
  5. Infrastructure

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Onslow Recreational Jetty

Last updated: February 3, 2025

The proposal is for the construction and operation of a recreational jetty at Beadon Point, Onslow, Western Australia. The Proposal will provide a pedestrian jetty alongside the ruins of the historic Onslow Jetty for tourism and fishing. The jetty will not be designed to accommodate vehicles or vessels and will be for pedestrians only. Some land clearing will be required to allow an access track and a boardwalk access path to the jetty. Read more...

Ashburton Infrastructure Project

Last updated: November 25, 2024

The Proposal is located in the Pilbara region of Western Australia within a development envelope of 20,821 ha and clearing no more than 1,564 ha. Onslow Infraco Pty Ltd (herein MRL a wholly owned subsidiary of Mineral Resources Limited) is proposing to develop: • A fully sealed private haul road, approximately 125km in length • Gas pipeline and ancillary haul road infrastructure. • Storage and bulk handling of ore at the Port of Ashburton. • Dredging a dedicated berthing pocket adjacent to the... Read more...

Lumsden Point General Cargo Facility

Last updated: August 12, 2024

The proposal is to develop and operate a general cargo facility within the Port Hedland inner harbour, within the Town of Port Hedland. This proposal has been superseded by the Lumsden Point General Cargo Facility Read more...

Ningaloo Lighthouse Resort Project

Last updated: December 15, 2023

Z1Z Resorts Pty Ltd proposes to redevelop the Ningaloo Lighthouse Holiday Park, located along Yardie Creek Road, North West Cape. The Proposal comprises the construction of new visitor accommodation; the construction of associated ancillary facilities (i.e., staff accommodation, power supply infrastructure, water supply and treatment, wastewater treatment and reuse, and replacement service station (vehicle refuelling) etc.); refurbishment of the Vlamingh Head Lighthouse Quarters (a part of... Read more...

Balla Balla Export Facilities

Last updated: July 1, 2022

The proposal is to construct and operate an iron ore export facility at Balla Balla midway between Port Hedland and Karratha, northwest of Whim Creek in the Pilbara region of WA. Read more...

Cape Preston East Iron Ore Export Facility (s46) [2183]

Last updated: August 6, 2020

Change to Extension of Timeframe for substantial commencement. Read more...

Balla Balla Export Facilities (s46) [2220]

Last updated: January 20, 2020

The Minister for Environment has requested that the Environmental Protection Authority (EPA) inquire into and report on the matter of changing the implementation conditions in Ministerial Statement 945 relating to Forge Resources Swan Pty Ltd’s Balla Balla Export Facilities proposal. Read more...

Learmonth Bundle Site

Last updated: May 15, 2019

Subsea 7 proposes to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35km south of the Exmouth Townsite. A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields. The proposal consists of an onshore pipeline bundle fabrication site and associated infrastructure, two bundle tracks (approximately 10km in length) along which the... Read more...

Onslow Marine Support Base Stage 2 Capital Dredging

Last updated: March 6, 2019

Onslow Marine Support Base Pty Ltd is proposing to modify and extend the Beadon Creek harbour approach channel, turning basin and berth pocket as part of Stage 2 of the Onslow Marine Support Base (OMSB) proposal. The proposed capital dredging will enable offshore supply vessels to access the newly constructed OMSB land-backed wharf facility (Stage 1) within the Beadon Creek Maritime Facility. 930,000 cubic metres of dredge material will be disposed of onshore to a 44 hectare Dredge material... Read more...

Cape Preston East – Multi-Commodity Export Facility

Last updated: November 12, 2018

The proposal is to construct and operate an iron ore export facility at Cape Preston East in the Pilbara region of WA. Read more...

Anketell Point Port Development (s46) [2162]

Last updated: May 14, 2018

Section 46 extension to the Time Limit for Authorisation for substantial commencement. Read more...

Anketell Point Port Development, Antonymyre, Shire of Roebourne

Last updated: January 30, 2013

The proposal is to construct and operate a multi-user deep-water port with iron ore stockpiling, transfer and ship loading facilities and ancillary infrastructure at Anketell Point. The proposal allows for facilities required by the Proponent and future third parties to be developed. Read more...

Port Hedland Outer Harbour Development

Last updated: February 28, 2012

The proposal is to construct and operate the Outer Harbour Development which includes landside and marine infrastructure for the handling and export of iron ore from BHPBIO’s operations. The Boodarie stockyard infrastructure will supply an overland conveyor to a transfer pad located to the west of the existing Finucane Island facilities. A piled jetty will transfer ore material to the ship loaders located at the piled wharf. Read more...

Macedon Gas Development

Last updated: January 17, 2012

The proposal is to construct a sub sea pipeline, onshore gas treatment and compression plant, and sales gas pipeline. The subsea pipeline from the Macedon Gas Field (100 kilometres west of Onslow) connects to the onshore gas treatment and compression plant at Ashburton North (15 kilometres southwest of Onslow). The sales gas pipeline connects the onshore facility to the Dampier to Bunbury Natural Gas (DBNG) Pipeline. Read more...

Materials Stockpiling and Handling Facilities, Cape Preston

Last updated: March 20, 2008

The proposal is to establish materials stockpiling and handling facilities with a capacity of approximately 4 million tonnes at Cape Preston, approximately 60km west-south-west of Dampier. Read more...

Dredging Program for the Cape Lambert Port Upgrade

Last updated: July 12, 2007

A capital and maintenance dredging program to remove up to 2.5 million cubic metres of marine sediment from within State Waters adjacent to Cape Lambert, and disposal of up to 2 million cubic metres of uncontaminated dredge material to Spoil Ground 1. Read more...

Methanol Plant and Product Export, Burrup Peninsula

Last updated: December 20, 2002

The proposal is for construction and operation of a methanol plant of 1.05 million tonnes per annum (Mt/a) nominal capacity, at Withnell East industrial area on the Burrup Peninsula The proposal includes the installation of a gas supply pipeline, product pipeline, seawater supply pipeline and wastewater discharge pipeline to be situated in infrastructure corridors for which the Department of Mineral and Petroleum Resources (MPR) will be proponent. The plant footprint will occupy approximately... Read more...

Second offshore trunkline and DOMGAS debottlenecking, North West Shelf

Last updated: July 14, 1998

The Proposal is to install a second undersea gas trunk line from the existing offshore Goodwin/North Rankin production platforms to a new terminal located in the existing onshore treatment plant at Withnell Bay on the Burrup Peninsula. Read more...

AUSI Iron Project, Infrastructure Requirements

Last updated: June 25, 1996

The proposal is to construct and operate additional infrastructure to satisfy the requirements of the recently proposed AUSI Iron Project Direct Reduced Iron (DRI) plant near Wickham in the Pilbara region of Western Australia, the subject of EPA Bulletin 794. Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.