Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Infrastructure (25) Apply Infrastructure filter
  • Iron Ore (23) Apply Iron Ore filter
  • Industrial (11) Apply Industrial filter
  • Oil and gas (10) Apply Oil and gas filter
  • Utilities (2) Apply Utilities filter
  • Waste management (2) Apply Waste management filter
  • Copper (1) Apply Copper filter
  • Gold (1) Apply Gold filter
  • Sand, rock, gravel and clay (1) Apply Sand, rock, gravel and clay filter
  • Uranium (1) Apply Uranium filter

Filter by current status:

  • Ministerial Statement published (53) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (4) Apply Decision on whether to assess has been published filter
  • Assessment has been terminated under s40A of the EP Act (2) Apply Assessment has been terminated under s40A of the EP Act filter
  • EPA Report and Recommendations released - not appealable (1) Apply EPA Report and Recommendations released - not appealable filter
  • Ministerial Statement withdrawn under s.47A (1) Apply Ministerial Statement withdrawn under s.47A filter

Filter by relevant environmental factors:

  • (-) Remove 37 filter 37
  • Flora and Vegetation (37) Apply Flora and Vegetation filter
  • Social Surroundings (33) Apply Social Surroundings filter
  • Terrestrial Fauna (29) Apply Terrestrial Fauna filter
  • Hydrological Processes (21) Apply Hydrological Processes filter
  • Inland Waters Environmental Quality (20) Apply Inland Waters Environmental Quality filter
  • Benthic Communities and Habitats (14) Apply Benthic Communities and Habitats filter
  • Marine Environmental Quality (13) Apply Marine Environmental Quality filter
  • Subterranean Fauna (10) Apply Subterranean Fauna filter
  • Marine Fauna (9) Apply Marine Fauna filter
  • Terrestrial Environmental Quality (8) Apply Terrestrial Environmental Quality filter
  • Coastal Processes (7) Apply Coastal Processes filter
  • People (5) Apply People filter
  • Landforms (4) Apply Landforms filter
  • 3144 (3) Apply 3144 filter
  • Inland Waters (3) Apply Inland Waters filter
  • Human Health (1) Apply Human Health filter

Filter by Proponent:

  • Chevron Australia Pty Ltd (5) Apply Chevron Australia Pty Ltd filter
  • Fortescue Metals Group Limited (4) Apply Fortescue Metals Group Limited filter
  • BHP Billiton Iron Ore Pty Ltd (3) Apply BHP Billiton Iron Ore Pty Ltd filter
  • Hamersley Iron Pty Limited (3) Apply Hamersley Iron Pty Limited filter
  • Roy Hill Infrastructure Pty Ltd (3) Apply Roy Hill Infrastructure Pty Ltd filter
  • Apache Energy Ltd (2) Apply Apache Energy Ltd filter
  • BHP Iron Ore Pty Ltd (2) Apply BHP Iron Ore Pty Ltd filter
  • Fortescue Metals Group Ltd (2) Apply Fortescue Metals Group Ltd filter
  • Hamersley Iron Pty Ltd (2) Apply Hamersley Iron Pty Ltd filter
  • New Energy Corporation Pty Ltd (2) Apply New Energy Corporation Pty Ltd filter
  • Robe River Mining Co. Pty. Ltd (2) Apply Robe River Mining Co. Pty. Ltd filter
  • Apache Northwest Pty Ltd (1) Apply Apache Northwest Pty Ltd filter
  • API Management Pty Limited (1) Apply API Management Pty Limited filter
  • Australian Methanol Company Pty Ltd (1) Apply Australian Methanol Company Pty Ltd filter
  • Australian United Steel Industry Pty Limited (1) Apply Australian United Steel Industry Pty Limited filter
  • BHP Billiton Iron Ore (1) Apply BHP Billiton Iron Ore filter
  • BHP Billiton Petroleum Pty Ltd (1) Apply BHP Billiton Petroleum Pty Ltd filter
  • BHP Direct Reduced Iron Pty Ltd (1) Apply BHP Direct Reduced Iron Pty Ltd filter
  • BHP Iron Ore Pty Ltd. (1) Apply BHP Iron Ore Pty Ltd. filter
  • Burrup Fertilisers Pty Ltd (1) Apply Burrup Fertilisers Pty Ltd filter
  • Burrup Nitrates Pty Ltd (1) Apply Burrup Nitrates Pty Ltd filter
  • Cameco Australia Pty Ltd (1) Apply Cameco Australia Pty Ltd filter
  • Chevron Australia (1) Apply Chevron Australia filter
  • Hope Downs Management Services Pty Ltd (1) Apply Hope Downs Management Services Pty Ltd filter
  • IB Operations Pty Ltd (1) Apply IB Operations Pty Ltd filter
  • Korean Steel Pty Ltd (1) Apply Korean Steel Pty Ltd filter
  • Main Roads Western Australia (1) Apply Main Roads Western Australia filter
  • Methanex Corporation (1) Apply Methanex Corporation filter
  • Mineralogy Pty Ltd (1) Apply Mineralogy Pty Ltd filter
  • NWIOA Ops. Pty Ltd trading as North West Infrastructure (1) Apply NWIOA Ops. Pty Ltd trading as North West Infrastructure filter
  • NWIOA Ops. Pty Ltd (trading as North West Infrastructure) (1) Apply NWIOA Ops. Pty Ltd (trading as North West Infrastructure) filter
  • Pilbara Energy (Generation) Pty Ltd (1) Apply Pilbara Energy (Generation) Pty Ltd filter
  • Port Hedland Port Authority (1) Apply Port Hedland Port Authority filter
  • Readymix Holdings Pty Limited (1) Apply Readymix Holdings Pty Limited filter
  • Rio Tinto Winu Pty Limited (1) Apply Rio Tinto Winu Pty Limited filter
  • Robe River Iron Associates (1) Apply Robe River Iron Associates filter
  • Sino Iron Pty Ltd and Korean Steel Pty Ltd (1) Apply Sino Iron Pty Ltd and Korean Steel Pty Ltd filter
  • Syntroleum Sweetwater (1) Apply Syntroleum Sweetwater filter
  • Wesfarmers Chemicals Energy & Fertilisers Limited (1) Apply Wesfarmers Chemicals Energy & Fertilisers Limited filter
  • Western Stevedores Pty Ltd (1) Apply Western Stevedores Pty Ltd filter
  • Woodside Energy Ltd (1) Apply Woodside Energy Ltd filter
  • Woodside Energy Ltd (1) Apply Woodside Energy Ltd filter
  • Yara Pilbara Nitrates Pty Ltd (1) Apply Yara Pilbara Nitrates Pty Ltd filter

Filter by region:

  • (-) Remove Pilbara filter Pilbara

Filter by last updated:

  • 2024 (7) Apply 2024 filter
  • 2023 (9) Apply 2023 filter
  • 2022 (1) Apply 2022 filter
  • 2021 (3) Apply 2021 filter
  • 2020 (5) Apply 2020 filter
  • 2019 (2) Apply 2019 filter
  • 2018 (3) Apply 2018 filter
  • 2016 (1) Apply 2016 filter
  • 2015 (4) Apply 2015 filter
  • 2013 (3) Apply 2013 filter
  • 2012 (5) Apply 2012 filter
  • 2009 (1) Apply 2009 filter
  • 2008 (2) Apply 2008 filter
  • 2006 (3) Apply 2006 filter
  • 2005 (1) Apply 2005 filter
  • 2003 (1) Apply 2003 filter
  • 2002 (4) Apply 2002 filter
  • 2000 (2) Apply 2000 filter
  • 1997 (1) Apply 1997 filter
  • 1996 (2) Apply 1996 filter
  • 1995 (1) Apply 1995 filter
  1. Home
  2. Proposal search
  3. 37
  4. Pilbara

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Pilbara Energy Generation Power Station

Last updated: November 25, 2024

PEG proposes to construct and operate 14 new gas-fired reciprocating engines with a combined maximum installed capacity of 165 MW. It is expected the average annual throughput of the facility will be approximately 150 MW. The 165 MW power station is expected to result in 609,696 tCO2-e. The proposed PEG power station is located next to the existing Solomon power station and replaces the need for 221 MW power at Iron Bridge, which would have resulted in 1,196,423 tCO2-e. FMG have submitted a... Read more...

Gorgon Gas Development Revised and Expanded Proposal: Barrow Island Nature Reserve

Last updated: November 25, 2024

The construction of facilities for the development of the Greater Gorgon Gas Fields on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on Barrow Island. Read more...

Pluto LNG Development (Site B Option), Burrup Peninsula

Last updated: November 25, 2024

The construction of facilities for the development of the Pluto Gas Field on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on the Burrup Peninsula. Extensive dredging will be undertaken adjacent to the export facility. Read more...

Utah Point Berth Project (Stage B)

Last updated: September 27, 2024

The Utah Point Berth Project consists of two separate stages: Stage A: Dredging and Reclamation; and Stage B: Construction and Operation. Stage A, dredging and reclamation works for the UPBP was approved by the Minister for Environment as an amendment to the existing Fortescue Metals Group (FMG) approval and managed according to the approved conditions. The works for Stage A have been successfully completed. The EPA determined that Stage B, the construction and ongoing operation of stockyard... Read more...

Multi-User Iron Ore Export (Landside) Facility Port Hedland (S46) [2349]

Last updated: February 19, 2024

The requested change relates to condition 3 of Ministerial Statement 1056 (as relevant to Ministerial Statement 891) for an extension to the Time Limit for Proposal Implementation for the proposal approved under MS 891. With the agreement of the proponent, the Environmental Protection Authority will take no further action in relation to the s.46 inquiry into the proposed changes to condition 3 of Ministerial Statement 1056 (as relevant to Ministerial Statement 891) Read more...

Cloudbreak Life of Mine Expansion

Last updated: February 9, 2024

The proposal includes the existing Cloudbreak iron ore mine and proposed expansion. The existing mine includes open pit strip mining, backfilling of pits, progressive rehabilitation and ore processing. The expansion includes increasing ore production, development of new pits and permanent waste landforms, the development of new infrastructure, additional dewatering and water disposal activities, an upgrade of the ore processing facility. Read more...

BHP Billiton Iron Ore - Pilbara Strategic Proposal

Last updated: February 5, 2024

BHP Billiton Iron Ore has prepared a Strategic Proposal of its future operations in the Pilbara for the next 50 to 100 years. The Strategic Proposal will facilitate a more holistic and longer term view of mining activities in the Pilbara region by identifying and assessing how impacts to the environment at a landscape scale will be managed. Read more...

Winu Project

Last updated: December 22, 2023

Rio Tinto Winu Pty Limited (the Proponent) proposes to develop the Winu Project (the Proposal). The Proposal is a new copper-gold mine located approximately 300 km south of Broome and 320 km east of Port Hedland in the northern Pilbara region of Western Australia within both the Nyangumarta people’s and the Martu people’s Native Title Determination Areas. The Proposal conceptual footprint will require the clearing of up to 4,868 ha of native vegetation within a proposed 37,344 ha Development... Read more...

Eliwana Iron Ore Mine

Last updated: November 6, 2023

Fortescue Metals Group Ltd proposes to develop the Eliwana Mine Project in the Pilbara region of Western Australia. The Eliwana Mine Project Area is located approximately 90 km west-northwest of Tom Price. Over the life of the mine, the average annual production rate is estimated at 30 Mtpa but infrastructure will be constructed to reflect peaks in the annual production rate up to 50 Mtpa. The estimated mine life is 24 years. The proposal involves the clearing of up to 8,560 ha of native... Read more...

Newman Hub (Western Ridge) Derived Proposal

Last updated: September 8, 2023

BHP propose to expand existing mining operations at the Newman Hub in the Pilbara, approximately 2 kilometres (km) southwest of Newman. The Proposal is a derived proposal for mining operations at Newman (Western Ridge) authorised by the Pilbara Expansion Strategic Proposal, Ministerial Statement 1105. The proposal is to develop four iron ore deposits to expand BHP’s Newman Hub and includes: overburden storage areas ore and topsoil stockpiles haul and access roads overland conveyor 30 million... Read more...

Multi-user Iron Ore Export (Landside) Facility, Port Hedland (s. 46)

Last updated: July 31, 2023

The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. Inquiry under s46 in response to a request to change condition 3 - Time Limit for Proposal Implementation of Ministerial Statement 891 . This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...

Roy Hill 1 Iron Ore Project, Port Infrastructure

Last updated: July 31, 2023

The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...

Roy Hill 1 iron ore project port infrastructure proposal (s. 46)

Last updated: July 31, 2023

The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. Inquiry under s46 regarding amending the conditions of Ministerial Statement 858 . This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...

Roy Hill 1 Iron Ore Project, Port Infrastructure – Ministerial Statement 858 (s46) [2145]

Last updated: July 31, 2023

This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...

Manuwarra Red Dog Highway – Revised Proposal

Last updated: July 4, 2023

In 1998 Main Roads Western Australia (Main Roads) referred Stages 2, 3 and 4 of the Karratha – Tom Price Road, now called the Manuwarra Red Dog Highway (the Original Proposal), to the Environmental Protection Authority (EPA). The EPA assessed the Original Proposal and published EPA Report 1159. Ministerial Statement (MS) 677 was published in 2005. Construction of Stage 2 was completed in 2008. Stage 3 of the Original Proposal is currently under construction and is expected to be completed in... Read more...

Wheatstone Development – Gas Processing, Export Facilities and Infrastructure (s46) [2143]

Last updated: April 19, 2023

Read more...

Port Facility Upgrade - Anderson Point, Port Hedland: Dredging and Wharf Construction - Third Berth (S46) [2256]

Last updated: January 17, 2022

S46 change to conditions. Removal of Condition 11: Dust Read more...

Devil Creek Gas Development Project

Last updated: September 1, 2021

The proposal is for the construction and operation of a gas processing plant, onshore supply gas pipeline, onshore sales gas pipeline, and horizontal directionally drilled shore crossing. Read more...

Sino Iron Mine Continuation Proposal

Last updated: September 1, 2021

The proposal is an expansion of the existing Sino Iron Project approved under Ministerial Statement 635 (as amended). The proposal is required to accommodate continuation of mine operations associated with the existing two billion tonnes mining rights afforded to Sino Iron and Korean Steel in accordance with existing commercial agreements. It includes the expansion of the mine pit, waste dumps and Tailings Storage Facilities. The proposed mine pit expansion will increase in depth from 220 m to... Read more...

West Angelas Iron Ore Project Deposits C, D and G

Last updated: April 16, 2021

Robe River Mining Co. proposes to develop the West Angelas C, D and G iron ore deposits to sustain production at the existing West Angelas iron ore operations. The proposal is located approximately 130 km northwest of Newman.   Mining of the C, D and G iron ore deposits will involve the additional clearing of up to 4,310 ha of native vegetation within a mine development envelope of 26,400 ha. Mine dewatering will be required to accommodate below water table mining, requiring an additional  ... Read more...

Pages

  • 1
  • 2
  • 3
  • 4
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.